1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Concerns with RUC Capacity Short Charge and Energy Trades.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
August 10, 2010 COPS Nodal EILS Update Mandy Bauld.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Scheduling and Operating Transmission Devices in the Nodal Environment.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
1 Nodal Day Ahead Invoice Taskforce Update COPS, May 8, 2007.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Cutover Market Call November 29, :30 PM
ERCOT Market Design & Operations
General Overview Of Resource Costs
Ancillary Service Trades and Ancillary Service Settlement
Vendor Definition of DAM Commitment
Project Update and Summary of Project Priority List (PPL) Activity
Presentation transcript:

1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld

2 Relevant Protocol References QRD Language QSE-Requested Decommitment of Resources and Changes to Ancillary Service Resource Responsibility of Resources (4)In the Adjustment Period, a QSE may request to decommit a Resource for any interval that is not a RUC-Committed Interval by indicating a change in unit status in the QSE’s COP. (5)A Resource cannot be decommitted for just a portion of a Day-Ahead Market (DAM)-Committed Interval, which is a one-hour interval. If a Resource that is decommitted for a DAM-Committed Interval, that one-hour DAM-Committed Interval is excluded from the calculation of any Day- Ahead Make-Whole Payment for that Resource. DAM Make-Whole Eligibility Language Day-Ahead Make-Whole Settlements (2) A QSE that has a Three-Part Supply Offer cleared in the DAM is eligible for Day-Ahead Make- Whole Payment energy cost compensation in a DAM-committed Operating Hour, if, for the Resource associated with the offer the generator’s breakers were closed for at least one minute during the DAM-committed Operating Hour.

3 NOT QSE Requested De-Commitment Treatment Slide 3 DAM COMMITMENT SNAP Status Snapshots COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) yes no Does Final SNAPSHOT for all DAM HOURS= 1 (on)? Change DAMCOMMITFLAG?

4 QSE Requested De-Commitment Treatment Slide 4 DAM COMMITMENT SNAP Status Snapshots COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) COP STATUS (0=OFF, 1=ON) no yes Does Final SNAPSHOT for all DAM HOURS= 1 (on)? Change DAMCOMMITFLAG to remove HE7?

5 Possible Outcome of removing Hour – DAM pays two Starts Settlements automated Eligibility for DAM Start-Up Determine contiguous hours of a DAM Commitment Is Resource offline for 5 minute in Adjustment period? Is Resource online for 1 minute during DAM Commitment? Eligible for Start-Up HE5–HE6 AND HE8-HE12 (2 starts) Slide 5 Hour DAM Committed Self Committed SELF DE-Committed Hour HE7 (resource goes off for at least 5 minutes during HE7) DAMCOMMITFLAG HE5 through HE6 DAMCOMMITFLAG HE8 through HE12

6 Possible Outcome of not removing Hour – DAM pays 1 start Settlements automated Eligibility for DAM Start-Up Determine contiguous hours of a DAM Commitment Is Resource offline for 5 minute in Adjustment period? Is Resource online for 1 minute during DAM Commitment? Eligible for Start-Up HE5–HE6 (1 start) Slide 6 Hour DAM Committed Self De-Committed SELF DE-Committed Hour (HE7) not removed from contiguous block. DAMCOMMITFLAG HE5 through HE12

7 Possible Outcome of not removing Hour – DAM pays Energy Settlements automated Eligibility for DAM Energy Determine contiguous hours of a DAM Commitment Is Resource online for 1 minute during DAM Committed Hour? Eligible for Energy HE5–HE12 Slide 7 Hour DAM Committed Self Committed SELF DE-Committed Hour (HE7) not removed from contiguous block. - The resource remains on for at least 1 min, paid for energy - The resource online < 1 min, not paid for energy DAMCOMMITFLAG HE5 through HE12

8 Decisions  If the resource was DAM-committed and fulfilled the DAM-commitment by actually operating in the hour, should the resource be considered for make-whole payment?  Yes: ERCOT to draft an NPRR to modify the language in If approved ERCOT would stop performing the QRD process  No: Leave the QRD rule in place (ERCOT will proceed with automation of a portion of the process, manual support still required daily) Consider whether or not the 2 nd startup resulting from the QRD should be prevented (potential for NPRR)