Mandate and Key Findings of the Independent Environmental Monitoring Agency William A Ross Independent Environmental Monitoring Agency Sustainable Development.

Slides:



Advertisements
Similar presentations
Proposed Quintette Mine Re-opening February 2011.
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Carolyn Dunn Environmental Assessment Division Healthy Environments Consumer Safety Branch Health Canada High Lake Mine Pre-Hearing Conference December.
Violet Camsell-Blondin Chair, Wekèezhìi Land and Water Board Zabey Nevitt Executive Director, Wekèezhìi Land and Water Board Aboriginal Consultation for.
Ecological Systems Maintaining and Enhancing Natural Features and Minimizing Adverse Impacts of Infrastructure Projects Course Review.
Cluff Lake Project IAEA- RSLS Workshop Elliot Lake, Ontario, May 2, 2014 Dale Huffman Vice-President, SHEQ AREVA Resources Canada.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
PROPONENT INVOLVEMENT IN CONSULTATION Presentation to the Geology Matters Community Engagement Workshop October 30, 2012 Consultation with the Mi’kmaq.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
TORNGAT WILDLIFE, PLANTS AND FISHERIES SECRETARIAT The Torngat Secretariat provides administrative and technical support, including research activities,
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
Baffinland Iron Mines Mary River Project November 2011 Community Round-Table Igloolik and Pond Inlet.
Office of the Auditor General of Canada The State of Program Evaluation in the Canadian Federal Government Glenn Wheeler Director, Results Measurement.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
Overview of Land and Resource Management in the NWT.
Kiggavik Project Final Hearing Presentation
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
DEPARTMENT OF PRIMARY INDUSTRY, FISHERIES AND MINES Sustainable development and the challenges of the 21 st century Minerals and Energy Mining – not just.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
Nunavut Water Board (NWB) Water Licensing Process for Jericho Mine Project Water Licence Renewal Application June 20, 2011 Community Meeting.
The Proposed Devolution Agreement. What is a “devolution”? de·vo·lu·tionˌde-və-ˈlü-shən alsoˌdē-və- : transference of rights, powers, property, or responsibility.
Nikolaj Bock EEA and the Arctic. *5 are member countries in the Arctic Council (DEN, SWE, FIN, ICE, NOR) 6 are permanent observes in the Arctic Council.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Inuit Qaujimajatuqangit. Traditional knowledge –Selection based on: same as archaeology boundary Kugluktuk traditional area travel routes Nunavut - NWT.
1 The Lower Athabasca Regional Plan: A Case Study Biol. 595 Sept. 16, 2009.
Joint Secretariat / Inuvialuit Regional Corporation Canada Northern Oil and Gas Research Forum Developing data and information sharing: Using existing.
DECISION-MAKING, FOLLOW-UP AND ENFORCEMENT OCTOBER 15, 2012.
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
1 February 2005 Briefing Sessions Draft Regulations Using Water for Recreational Purposes.
Assessing Effects on Human Health Meadowbank Gold Project Margaux Brisco Nunavut Impact Review Board Final Hearings, Baker Lake, Nunavut March 27 to 31,
Disclosure of Preliminary Screening to MVEIRB In Nunavut all screenings are conducted by the Nunavut Impact Review Board (NIRB). NIRB conducts screening.
WGEA Work Plan Presented to the 3 rd Meeting of the EUROSAI Working Group Sofia, Bulgaria November 4, 2004 John Reed, OAG, Canada.
Tahera Environmental Monitoring Commitments Summary Use TK in monitoring; cooperate with communities Collect reliable information that will: Allow detection.
Agency Coordination: Fraser River Estuary Management Program [FREMP] Georgia Basin/Puget Sound Research Conference 3 April 2003 Vancouver,
Izok Corridor Project: Kitikmeot Community Visit
ENVIRONMENTAL ASSESSMENT AND ABORIGINAL LANDS AND PEOPLES NOVEMBER 5, 2012.
2006 Socio-economic component CUMBERLAND RESOURCES LTD.  Baseline  Impact Assessment  Mitigation and Benefit Enhancement  Monitoring  Intervener Comments.
Nwtboardforum.com For reference only. Not a legal document Inuvialuit Settlement Region.
Best Local Land Use Practices Update Kirby Date, Countryside Program Coordinator.
Long-Term Spent Fuel Management in Canada International Conference on Management of Spent Fuel from Nuclear Power Reactors Vienna, Austria May 31, 2010.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
THE SPECIES AT RISK ACT (SARA) CBA/Justice National Section Meeting National Environmental Energy Resources Law Group Ottawa – October 24, 2004.
THE NAONAIYAOTIT TRADITIONAL KNOWLEDGE PROJECT (NTKP) An Evolving Traditional Knowledge Database via Dynamic Partnerships with Industry Presented to the.
J. Michael Miltenberger Minister Environment and Natural Resources May 11, 2012 Reality of Co-management with Aboriginal Governments in the NWT: Environmental.
1 Update to Dehcho Land Use Planning Forum on Draft Changes to Interim Dehcho Land Use Plan Update to Dehcho Land Use Planning Forum on Draft Changes to.
North Slope Science Initiative Dr. John F. Payne, Executive Director Dr. Denny Lassuy, Acting Deputy Director North Slope Science Initiative
Mineral Development Advisory Group. To represent the interests of Kitikmeot Inuit by protecting and promoting our social, cultural, political, environmental.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
About DROPS Oil & Gas Industry Workgroup focused 100% on dropped object prevention Globally active, member-funded and non-profit making Leading global.
Public Participation in Sustainability Planning and Socio-Economic Impact Assessment in Canada.
What do Accreditation Bodies currently do to engage with regulators? Some common approaches.
The Independent Environmental Monitoring Agency The Independent Environmental Monitoring Agency.
RESOURCE POTENTIAL AND CONSERVATION VALUES. Traditional Land Use and Occupancy Archeology, Rare Features, Historic Sites Wildlife Habitat Value 2/15.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Phase 2 Hope Bay Belt Project
MADRID – BOSTON PROPOSAL PHASE 2 OF THE HOPE BAY PROJECT
Kitikmeot Inuit Association
Phase 2 Hope Bay Belt Project
Independent Environmental Monitoring Agency Annual Report Summary
Indian and Northern Affairs Canada
Environmental Assessment and Licensing (EAL) in Manitoba
Mary River Project Phase 2 Proposal Freshwater Environment
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Mandate and Key Findings of the Independent Environmental Monitoring Agency William A Ross Independent Environmental Monitoring Agency Sustainable Development in the Diamond Mining Sector Ottawa June, 2003

Independent Environmental Monitoring Agency Ekati™ Mine project description Monitoring requirements for Ekati mine Community monitoring Independent Environmental Monitoring Agency - Key findings

Ekati Mine Diamond mine (Canada’s first) Gem quality diamonds Northwest Territories –Arctic barrens, 300 km NE of Yellowknife Construction from 1996 Operation from October, 1998 Surface mining of kimberlite pipes (usually under lakes) – some underground mining Processing plant on site

Panda Pit Ekati Photo BHP Diamonds

Ekati Mine Location

Ekati Mine Project Description Dewatering lakes for access to kimberlite pipes Explosives use (introduces nitrogen (ammonia) into waste rock) Road construction to link pipes Waste rock sent to waste rock piles (ARD) Kimberlite is processed on site to extract the diamonds and then the residue (tailings) is disposed of into Long Lake tailings pond Work camp for several hundred staff (“hotel” accommodates 600 persons)

EIA Review for Ekati Mine Full panel review project approval Major affected people, aboriginal groups –Kitikmeot Inuit Association (Kugluktuk) –Dogrib Treaty 11 Council (Fort Rae) –Akaitcho Treaty 8 (Lutselke and Yellowknife) –North Slave Metis Alliance (Yellowknife) Approval subject to Environmental Agreement –BHPB (proponent), GNWT, Canada

Monitoring Requirements for Ekati Mine Water licences - water quality monitoring Fisheries authorisation - fish studies Renewable Resources - wildlife monitoring Operating Environmental Management Plan - monitoring programs (spills, safety, etc.) Impact Benefit Agreements with aboriginal groups (bilateral) - socioeconomic aspects - independent of Environmental Agreement

Community Monitoring for Ekati Mine Focus on –Wildlife – caribou –Wildlife – wolverine –Monitoring Agency liaison role

Caribou Photo BHP Diamonds

Community Monitoring Caribou Caribou are the major VEC in the North Bathurst Caribou herd – animals –Migrate through mine site (up to ) Elders on site visits Community observations Annual monitoring workshops Caribou management board

Community Monitoring Caribou Site visits to observe and offer advice –Airport avoidance –Road design –Tailings pond concerns Photo RWED Government of the Northwest Territories

Community Monitoring Caribou Community observations –Caribou fitness –Caribou injuries Caribou monitoring program –Radio collars –Community concerns

Community Monitoring Caribou Monitoring workshops –Aboriginal input –Government, industry, Agency input –Review monitoring results, adapt monitoring programs –Wildlife and aquatic effects (plus air quality and reclamation) –Annual events

Elders visiting the poster display at the annual Workshop

Community Monitoring Archaeology

Community Monitoring Wolverine

Significant adverse cumulative impact –Ekati, Diavik and Winter Road operation –Poor food handling results in about 15 animals killed or relocated over three years of a population of about 20 animals –Food handling is better now Regular monitoring via snow tracks

Community Monitoring Wolverine Need to identify wolverine tracks –Get best tracker in the region - Allen Niptanatiak, of Kugluktuk (300 km north of mine) –Known as best wolverine trapper in the area –Commutes by snowmobile to mine site

Community Monitoring Lessons Community role in influencing monitoring is considerable –Concern with dust on vegetation – new monitoring program –Concern with tailings pond – vegetation to avoid attracting caribou (use of TK)

Independent Environmental Monitoring Agency Public watchdog for environmental management at the Ekati mine Seven members: BHPB, GNWT, Canada, and four aboriginal groups Seven board members appointed by seven members No “representation” - all board members have the same common mandate Budget about Can$ /a provided by Mine operator - initially some funds came from governments

Independent Environmental Monitoring Agency In order to meet its mandate the Agency: –monitors and reviews environmental management plans and reports by BHP and government agencies –analyses issues to promote the identification, evaluation and management of environmental impacts –reviews the activities of regulatory agencies and their interactions with BHPB –monitors the progress of traditional knowledge studies funded by BHPB and conducted by aboriginal organisations –facilitates interaction between BHPB and aboriginal organisations to integrate traditional knowledge into BHPB’s management plan

Independent Environmental Monitoring Agency In order to meet its mandate the Agency: –participates in technical workshops involving environmental management at the Ekati mine –meets and corresponds regularly with with BHPB and regulators about environmental issues at Ekati –reviews and comments on regulatory approvals sought by BHPB that relate to environmental matters –reports to aboriginal organisations and the public at large –maintains a publicly accessible library of all materials regarding environmental management of the Ekati mine

Independent Environmental Monitoring Agency In order to meet its mandate the Agency: –publishes newsletters, a web site, a brochure and annual reports –holds an annual general meeting for members of the Monitoring Agency

Key Findings Environmental Impacts –No major environmental impacts to date Concerns about possible impacts –Land disturbance is considerable Rock piles Roads –Wildlife concerns Caribou Wolverine –Aquatic effect concerns –Toxic chemical concerns minimal

Land Disturbance Predicted from the beginning A & R Plan Disturbed area to date 1400 ha (14 km 2 ) –Waste rock, kimberlite and overburden 670 ha Height of 30 m to 50 m –Roads 300 ha –Infrastructure 275 ha –Pits 160 ha –Claim block area ha

Panda Waste Rock Pile

Caribou Impacts Ekati Mine impacts, as measured, are not significant Cumulative – require regional monitoring and management –Collaboration with other mines, roads etc. –Government direction required

Think Like a Caribou Standard roadside Caribou friendly roadside

Or Think Like a Wolf Standard roadside Caribou friendly roadside

Pigeon Culvert No effect on stream but barrier to caribou

Aquatic Effects Downstream water quality changes Effect on aquatic life modest but uncertain Change in zooplankton composition downstream from Long Lake –Uncertain –Monitored

Key Findings Environmental Management Process: –Adaptive environmental management can work Kodiak Lake eutrophication problem managed Waste rock pile management –Need for regional cooperation Industry cooperation Regional monitoring agency

Key Findings Environmental Management Process: –Monitoring program is a good one Developed collaboratively (workshops + debate) –Watchdog role a success I appreciate what you guys (Directors of the Agency) have done over the past few years and I wanted to give you a pat on the back to say good work and I want you to keep it up.” Joe Rabesca (Grand Chief Dogrib Treaty 11)

Key Findings Environmental Management Process: –Effective environmental management at Ekati “[BHPB’s] environmental management and compliance has, to date, been good and improving. [BHPB], the regulatory authorities, the Aboriginal organisations and the Agency contribute to the ongoing improvement of the environmental management at [Ekati]. Overall [BHPB] has responded well to facing the challenges of being the first operating diamond mine in the North.” (Agency annual report, 2000)