WPI / N: What remains to be done Uli Katz ECAP / Univ. Erlangen 23.02.2012 WPD+I+N Report, Catania, 23.02.2012.

Slides:



Advertisements
Similar presentations
DICODE-FP7 Project WP6 - Validation & Assessment.
Advertisements

EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
Creating Better Health and Care Services An overview of a Better Health and Care Review process.
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” Technical.
The KM3NeT Project  Objectives  Current membership and funding  Preparatory Phase  The EMSO connection  Structural funds ESFRI Meeting, Brussels,
Status of the KM3NeT Design Study  History and structure  Tasks and progress  The European context  Context of decisions to be taken  Conclusions.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
Practical Research: Writing research proposals Hannah Jones SO914 week /14.
Emergency Planning at ACF-Paris
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.
The Preparatory Phase Proposal a first draft to be discussed.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
Chapter 2 Needs Identification
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
TG Projects status Nikos Houssos euroCRIS Board meeting Prague, 06 June 2012.
The KM3NeT Preparatory Phase Project  Objectives  Current membership and funding  The Preparatory Phase project KM3NeT Meeting, Pylos, April 16, 2007.
EPOS-PP Work Package 3 Governance John Ludden British Geological Survey/NERC U.K.
Biokenaf QLK5 CT th technical meeting Madrid, 27 and 27 th of September 2006 E. Alexopoulou/CRES.
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
THE 2 nd CORE GROUP MEETING Vienna, the 16 March 2012 Agnieszka GOLAS EUROCADRES’ project expert.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
Astroparticle Physics for Europe ASPERA -2 WP3: Knowledge and technology transfer 1. Kick-off meeting 7 July 2009, Rob van der Meer (FOM) WP 3 Knowledge.
WP2 – Strategy, governance and liaisons EuroVO-ICE– First review – 26 October 2011 Françoise Genova, EuroVO-ICE coordinator,1 WP2 Strategy, governance.
Mantychore FP7 WP4 (SA1) - Software Refinement. Objectives Main duties – Analysis of User Requirements – Implementation – Support and bug fixing This.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
FP6−2004−Infrastructures−6-SSA EUChinaGrid status report Giuseppe Andronico INFN Sez. Di Catania CERN – March 3° 2006.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
A Cost Model for KM3NeT Uli Katz Physics Institute University Erlangen-Nuremberg KM3NeT WP2 Meeting Oct. 24, 2006, Marseille Based on a presentation by.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to the Meeting  Schedule  Recent developments  Objectives and issues KM3NeT Meeting, Pylos, April 16, 2007 Uli Katz Univ. Erlangen.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
ERINHA: Framework for the biological high containment research infrastructure STOA – AVIESAN Workshop June 19th 2012, European Parliament, Brussels.
MAPS Middleware Action Plan & Strategy Project Middleware Action Plan & Strategy Project (MAPS) Patricia McMillan, Project Manager.
CERN openlab Phase 5 Preparation (Technical) Alberto Di Meglio CERN openlab CTO office.
3rd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Carmela ASERO, EGI.eu 17 September 2013, Madrid
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Astroparticle Physics European Consortium What can large Astroparticle Physics projects like LAGUNA-LBNO expect from the new APPEC, the Astroparticle Physics.
A proposal for the KM3NeT Computing Model Pasquale Migliozzi INFN - Napoli 1.
Eurostat I) Context & objectives of KIP INCA project Project owner is the Environment Knowledge Community (EKC) EKC is an EU inter-services group involving.
WP5 – Infrastructure Operations Test and Production Infrastructures StratusLab kick-off meeting June 2010, Orsay, France GRNET.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
DESIRE – Desertification Mitigation and Remediation of Land DESIRE Work Block 3: Gudrun Schwilch / CDE 1 October 2007 / WB3 Training Workshop Murcia, Spain.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
AMICI WP1 – Management, coordination and dissemination
AENEAS WP6 first conference call
Concluding remarks E. Migneco
Pasquale Migliozzi INFN Napoli
WP4: High-Energy Neutrinos
KM3NeT 2.0 Kick-off meeting, Athens,
Introduction WP 2 Legal Entity
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
KM3NeT Collaboration meeting, Marseille, January 2013
Project Ideation Agile Down-to-Earth © 2016.
WP4 Positioning European Astroparticle Physics in the world-wide context WP leader CNRS Partners: FOM, IFIN-HH, FRS-FNRS/FWO, FCT Total work: 22 months.
RECARE set-up Rudi Hessel on behalf of coordination team
Demography applications of SDMX Giuseppe SINDONI, Unit B3
Presentation transcript:

WPI / N: What remains to be done Uli Katz ECAP / Univ. Erlangen WPD+I+N Report, Catania,

U. Katz: WPI+N Report, Catania, Feb WPI: Data and control Major objectives: create the framework for the handling of the neutrino telescope data production of computing and storage models set up a ready-to-implement solution for the neutrino telescope operation system Deliverables: D.I.1 Report on requirements and specifications of data distribution and computing models: 43 FTEMs, due month 12. D.I.2 Report on solution for KM3NeT data distribution, computing and operation: 43 FTEMs, due month 32. Partners: U-Erlangen, INFN, CNRS, NOA-NESTOR, DIAS, FOM, UPVL

U. Katz: WPI+N Report, Catania, Feb WPI: Data and control - Status Report on requirements and specifications of data distribution and computing models A lot has been done in the context of the work for WPD and WPF/L Things need to be put together, some gaps remain to be filled Report on solution for KM3NeT data distribution, computing and operation Data distribution deep sea  shore  filter/trigger and filter output well understood and defined; computing resources for filter estimated. Data distribution to users/labs/GRID/computing centers and computing models and resources for reconstruction, simulation, analysis need to be studied in more detail Operation model: Needs to be written down, details to be decided

U. Katz: WPI+N Report, Catania, Feb WPN: User support and impact assessment Major objectives: Investigation of needs and requests of the user communities (in and beyond KM3NeT) concerning data dissemination, data formats, computing support and infrastructure operation. Assessment of the impact of the KM3NeT research infrastructure and the related facilities on the European Research Area (ERA). Deliverables: D.N.1 Report on user needs and requests:25 FTEMs, due month 10. D.N.2 Report on operation model and draft operation rules: 26 FTEMs, due month 20. D.N.3 Report on impact assessment activities:33 FTEMs, due month 35. Partners: U-Erlangen, INFN, CEA, CNRS, NCSR-D, NOA-NESTOR, DIAS, FOM, CSIC, UVEG, UNIABDN, U-Leeds, U-Liverpool, U-Sheffield

U. Katz: WPI+N Report, Catania, Feb WPN: User support and impact assessment - Status Report on user needs and requests “User Workshop” at VLVnT11 Very detailed and specific objectives formulated in HEAP-MM proposal Report on operation model and draft operation rules Basic issue: KM3NeT will be an observatory as opposed to an experiment May touch issues regulated in MoU Depends on one vs. multi-site decision Report on impact assessment activities To answer the question “how useful was the Preparatory Phase program for the external recognition of the project?”

U. Katz: WPI+N Report, Catania, Feb WPI / N – What remains to be done Drafts of deliverables distrbuted The WP coordinator takes care Filling some gaps will be required Many (all!) of you will be asked to comment/contribute Time scale: next weeks (drafts should go out until mid-April) Deliverables ready before summer