 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 

Slides:



Advertisements
Similar presentations
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Advertisements

Helical Piles Defined Presentation by: Howard A. Perko, Ph.D., P.E. Magnum Geo-Solutions, LLC Copyright 2011 – Magnum Piering, Inc., All Rights reserved.
Cost Estimating Workshop March 14-17, Project Phase Update Phase 1 and 3 Brad Hyre, P.E. Transportation Manager HDR Phase 2 Manoj Sethi, P.E. Executive.
HYDROELECTRIC PROJECT
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
PILES  there are two categories of piles according to the method of installation: A. Driven Piles 1.t imber, steel, precast concrete, piles formed by.
Session 25 – 26 DRILLED SHAFT And CAISSON FOUNDATION
Foundations Excavations
Geotechnical Investigation Step 1 - Gather Existing Information Structure Data Bridge, building, road, wall, etc. Type - stories, loads, materials, etc.
Reconstruction of the Eads Bridge Highway Deck
Micropiles Save Drilled Shafts
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
BRIDGE FOUNDATION DESIGN
Development of Pressure Penetrating Pipe(PPP) Pile for Enhancement of Bearing Capacity Do, Eunsu Seoul National University Geotechnical & Geoenvironmental.
AN INTRODUCTION TO MICROPILES CIVL 141 Spring 2011.
1 43 rd ANNUAL FHWA MIDWEST GEOTECHNICAL CONFERENCE Bloomington, MINNESOTA, OCTOBER 1-3, 2014 Update on FHWA Active and Future Highway Geotechnical Engineering.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
Hoover Dam Bridge. Creeping closer, 900’ above the Colorado River, the two sides of a $160 million bridge at the Hoover Dam slowly takes shape The bridge.
Foundation Engineering CE 483
Ann & Richard Barshinger Life Science & Philosophy Building Franklin & Marshall College – Lancaster, PA Michael A. Hebert Structural Option Spring 2006.
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Other Construction Projects
Introduction to a pit installation
CAISSON FOUNDATION.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
Jeff Graves Senior Project Manager/Geological Engineer.
No Cell Phones, Please. Thank You.. Division of Layne Christensen Company Specialty Foundation Construction Jet Grouting Drilled Micropiles Vibratory.
Brad Oliver – Structural Option Advisor – Professor Memari.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
DESIGN AND ANALYSIS OF DEEP FOUNDATION WEEK 10 DESIGN OF BORED PILE DESIGN OF GROUP AND RAKE PILE PILE SETTLEMENT.
Emergency Landslide Correction Benefits of a Contract Joey Franzino, P.E. INDOT Geotechnical Operations Engineer September 23, 2015.
November, 2013 TH 53 Realignment: E-1A Preliminary RSS Design GALE-TEC ENGINEERING, INC/Dr. B.R. Christopher November, 2013 Gale-Tec Engineering, Inc.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
ECNM Meeting October 1, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects.
 Working with FHWA on review.  Submit to Cooperating Agencies (EPA and Corp of Engineers)  45 day review May  Respond to agency comments  Publish.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Viktor Krivenkov Pavel Titov Roman Zinovjev Dmitry Pinezhko TTK/UAS, 2010.
CAISSON FOUNDATION.
 Add potential impacts for a 53/135 interchange  Meeting with FHWA to resolve issues  Do not have a plan/timetable from FHWA for review.  Submit to.
Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html.
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
TH 53 Relocation Project.  We have to penetrate large boulders and some of the hardest rock in the world  To know what we can get in the ground  To.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Section Engineers Meeting March 6, 2014 Lexington, KY.
IWM 2004 Tokyo, Japan Micropile Foundations Johnson City Medical Center Johnson City, Tennessee John R. Wolosick, P.E. Hayward Baker Inc. Atlanta, Georgia.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
AN OVERVIEW OF SHALLOW AND DEEP FOUNDATION SYSTEMS
Geotechnical Investigation
Sardar Patel Institute Of Technology
Pearl Condominiums Philadelphia, PA
John R. Wolosick, P.E. Hayward Baker Inc. Atlanta, Georgia
An-Najah National University Engineering College
No Cell Phones, Please. Thank You..
Foundations in Low-Rise Construction (up to 3 floors)
CONSTRUCTION METHODS & TECHNOLOGY
Guardrail Leaveouts 606 special provision July 6, 2016.
محمد امین طلایی – پویا نوذری
Minuteman Vocational Technical Regional High School Progress
Pre-loaded micropiles at Credit Valley Hospital – …..Revisited
Pier Foundations Piers Suspended floor Ground beam Next slide.
BUILDING CONSTRUCTION Foundation
Presentation transcript:

 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically  Viewed drilling operation

 E-1a and E-2 have similar conditions (fill over rock)  Large boulders (unknown size) and some of the hardest rock in the world  No experience drilling in this material  How long it will take to install foundations  Need to determine best foundation type and cost

 All work on E-1a haul road  One 8’ diameter drilled shaft ◦ Can it be constructed ◦ No load test  (2) 16” and 24” drilled pile ◦ 2 locations previously drilled ◦ Load test one 16” pile  July 25 th letting  Cost $3.5-5 million  Pre-bid meeting – July 9

 Minimize number of piers for any option  HDR to develop conceptsand cost estimates  E-1a ◦ Steel ◦ Concrete ◦ Delta Frame Arch  E-2 ◦ Steel ◦ Concrete ◦ Arch ◦ Delta Frame Arch

 Geological Mapping of faces  Boring at possible arch locations  Cost

 Commissioner’s Staff – June 16  Air Quality – June 17  Cliffs Negotiations– June 19  PAC – July 2  Coffee & Conversation – July 3  Test Foundations Pre-Bid – July 9  Needed meetings  Utilities  DNR School Trust