Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.

Slides:



Advertisements
Similar presentations
Incremental Analysis Lecture No. 21 Professor C. S. Park
Advertisements

13-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 13 Breakeven and Payback Analysis © 2012 by McGraw-Hill.
MANAGERIAL ACCOUNTING
B280F Introduction to Financial Management
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 26-1 CAPITAL BUDGETING Chapter 26.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Other Analysis Techniques Dave Ludwick Dept. of Mechanical Engineering University.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
Investment Analysis Lecture: 9 Course Code: MBF702.
Strategy and Analysis in Using NPV (Chapter 8) Financial Policy and Planning MB 29.
Key Concepts and Skills
Corporate Finance Lecture 5. Topics covered Decision trees Decision trees Dealing with uncertainty Dealing with uncertainty –Sensitivity analysis –Senario.
Lecture 8 Strategy and Analysis in using NPV The NPV analysis then gives a precise formula for deciding whether or not to proceed with the investment.
Ch 9 Learning Goals 3. The importance of risk in capital budgeting.
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
Project Analysis and Evaluation
Engineering Economic Analysis Canadian Edition
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
(c) 2001 Contemporary Engineering Economics 1 Chapter 14 Project Risk and Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Dealing With Uncertainty
Engineering Economics in Canada
Contemporary Engineering Economics, 4 th edition, © 2007 Methods of Describing Project Risk Lecture No. 46 Chapter 12 Contemporary Engineering Economics.
Sensitivity and Breakeven Analysis
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Financial and Managerial Accounting
Chapter 9 - Making Capital Investment Decisions
Chapter 10 Sensitivity and Breakeven Analysis. Handling Project Uncertainty Origin of Project Risk Methods of Describing Project Risk.
Methods of Handling Project Risk Lecture No. 30 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
Capital Budgeting and Investment Analysis
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
CTF Analysis and Terminal Loss
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
L30: Methods of Handling Project Risk ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Accounting Principles, Ninth Edition
Long-Term (Capital Investment) Decisions
Capital Expenditure Decisions
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
Capital Budgeting Decisions
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. The Capital Budgeting Decision 12.
CORNERSTONES of Managerial Accounting 5e. © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Investment Analysis Lecture: 10 Course Code: MBF702.
0 CHAPTER 10 Long-Term (Capital Investment) Decisions © 2009 Cengage Learning.
Engineering Economic Analysis Canadian Edition
Evaluating a Single Project
CHAPTER 10 DEALING WITH UNCERTAINTY. RISK Risk and uncertainty are similar in that they both present the problem of not knowing what future conditions.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms: determining.
L29: Sensitivity and Breakeven Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Copyright ©2015 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Sixteenth Edition By William.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
Chapter 8 Capital Asset Selection and Capital Budgeting.
CAPITAL BUDGETING CAPITAL: capital here refers to long term assets used in production BUDGET: is a plan that details projected inflows and outflows during.
Risk Analysis in Capital Budgeting. Nature of Risk Risk exists because of the inability of the decision-maker to make perfect forecasts. the risk associated.
. © 2003 The McGraw-Hill Companies, Inc. All rights reserved. Project Analysis and Evaluation Chapter Ten.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Probabilistic Cash Flow Analysis.
©2009 McGraw-Hill Ryerson Limited 1 of Risk and Capital Budgeting Risk and Capital Budgeting Prepared by: Michel Paquet SAIT Polytechnic ©2009 McGraw-Hill.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
Capital Budgeting and Risk Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Methods of Describing Project Risk
Discounted Cash Flow Analysis
Long-Term (Capital Investment) Decisions
Chapter 7 Present Worth Analysis
Chapter 11: Breakeven and Sensitivity Analysis
Presentation transcript:

Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk

Previously In previous lectures, we assumed a high degree of confidence in all estimated values, that is we assumed certainty. In most situations, however, there is doubt as to the ultimate results that will be obtained from an investment - there is risk and uncertainty

Risk and Uncertainty Caused by lack of precise knowledge regarding future business conditions, technological developments, synergies among projects, etc. Should be made explicit in any analysis Risk - Variability described by probability distributions Uncertainty - Probability distributions are not known Generally the terms are interchangeable

Four major sources of uncertainty Inaccuracy of the estimates: cash inflow, savings in existing operating expenses, capital required Type of business involved Type of physical plant and equipment involved Length of the project and study period

Non-probabilistic Methods for Describing Project Risk Breakeven Analysis Sensitivity Analysis Scenario Analysis Risk-Adjusted MARRs Reduction of the useful life

Breakeven Analysis Commonly used when selection among alternatives is dependent on a single factor (e.g., capacity, sales). Solve for the value of that factor at which the conclusion is a standoff. common measures include annual revenues and expenses, rate of return, market or salvage value, equipment life, capacity utilization).

Kinds of Breakeven Analysis Comparing two alternatives: Find the value of some parameter that makes the NAW or NPW equal. Evaluating a single alternative: Find the value of some parameter that makes NAW or NPW equal to zero. To decide, judge whether the breakeven point can reasonably be expected.

Breakeven Analysis - Example 1 Suppose that the market value of Alternative 1 is known with certainty. What would the market value of Alternative 2 have to be so that the initial decision based on this information would be reversed? Use a MARR of 15% per year

Example 1 - cont’d NAW A = $255 NAW B = $213 (MV = 1200) Choose A Find Breakeven Point for market value for B NAW A = NAW B 255 = -$6000 (A/P,15%,10) + $1350 +X(A/F,15%,10) Solve for X = 2050 Decision?

Example 1 - cont’d Breakeven Point = $2050

Sensitivity Analysis Relative magnitude of change in the measure of interest caused by one or more changes in estimated factors Common technique when one or more factors are subject to uncertainty. Assesses the impact of uncertainty in estimates on study results.

Sensitivity Analysis - Example 2 A machine is considered for immediate installation. Because of the new technology built in, we want to investigate its NPW over a range of +/-40% in a) capital investment,b) annual net cash flow, c) market value, d) useful life. Use MARR = 10%

Example 2 - cont’d Base NPW = -$11,500 + $3000 (P/A,10%,6) + $1000 (P/F,10%,6) = $2,130 a) When capital invest. varies by +/- p%, NPW = - (1 + p/100) ($11,500) + … (linear function) b) When revenues vary by +/- a%, NPW = … + (1 + a/100) ($3000)(P/A,10%,6) + … (linear function) c) When market value varies by +/- s%, NPW = … + (1 + s/100) ($1000) (P/F,10%,6) (linear function) d) When the useful life varies by +/- n%, NPW = … + $3000(P/A,10%,(1 + n/100)(6)) + $1000 (P/F,10%, (1 + n/100) (6)) (nonlinear function)

Example 2 - Spider Chart Observation: Solution is most sensitive to … Sensitivity analysis is useful for identifying factors that need to be estimated more carefully

Considering Several Factors: Scenario Analysis also called optimistic-pessimistic estimation used to establish a range of values for the measure of interest typically, the optimistic estimate has 1 chance out of 20 to be exceeded by the actual outcome and the pessimistic estimate has 19 chances out of 20 to be exceeded by the actual outcome

Scenario Analysis - Example 3 An ultrasound inspection device for which optimistic, most likely and pessimistic estimates are found below. The MARR is 8%.

Making Decisions Compare NAW(O) = 74,000, NAW(M) = 4500, NAW(P) = Decision: –If NAW(O) < 0 then »Reject –If NAW(P) > 0 then »Accept –Else »Do more analysis or let the boss decide

Analyze all Combinations (NAW in $000s) NAW > $50,000 for 4 out 27 combinations NAW < $0 for 9 out of 27 combinations Decision?

Risk-adjusted MARRs Involves the use of higher MARRs for alternatives that are classified as highly uncertain and lower MARRs for projects with fewer uncertainties Widely used in practice

Risk-adjusted MARRs - Example 4 Two alternatives, both affected by uncertainty to different degrees. The firm’s risk-free MARR is 10%. Alternative P is thought to be more uncertain than Alternative Q. At 10%, both alternatives have the same NPW Decision?

Example 4 - cont’d Using prescribed risk-adjusted MARRs of 20% for P and 17% for Q, we get NPW P = $10,602 NPW Q = $8,575 => Choose Alternative P Contradictory result

Example 4 - cont’d

Risk - adjusted MARRs Subject to many pitfalls. One of them is that the uncertainty in the project is not made explicit. Not recommended when other techniques can be used.

Reduction of the useful life Estimated project life is reduced by a fixed percentage and each alternative is evaluated regarding its acceptability over this reduced life span

Reduction of the useful life - Example 5 A proposed new product line has cash flows as below. Do an after tax analysis with an MARR of 15% The company ‘s maximum simple payback period is three years Decision?

Example 5 - cont’d ROR as a function of the useful life After- tax ROR Useful Life

Reduction of Useful Life Heavy emphasis is placed on rapid recovery of investment capital in the early years of project Closely related to the discounted payback technique Neglects cash flows that occur later in life Not recommended

Summary Methods are relatively simple to apply. They are also somewhat simplistic and imprecise in cases where we must deal with multifaceted project uncertainty. Probability concepts allow us to further analyze project risk and develop better recommendations.