G. Dissertori ETHZ CMS Electronics 2002 1 ECAL Detector Control System : Status Report G. Dissertori ETHZ 17.10.2002.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Questionnaire Response
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
The Control System for the ATLAS Pixel Detector
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
André Augustinus 16 June 2003 DCS Workshop Safety.
1 July 19, 2005German Martinez – SX5 Meeting RBX Temperature Monitoring Proposal German Martinez.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
The Detector Control System for the ATLAS SemiConductor Tracker
G. Dissertori ETH Zürich ECAL ESR - DCS 1 ECAL Detector Control System G. Dissertori Electronics System Review, Oct 9, 2003 Status report Trigger/DAQ.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
ATLAS Tracker Group PPD Staff Talk 28/Nov/2005 Steve McMahon 1 Steve McMahon : An Introduction Backgrounds and Pre-History –Imperial College London
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Progress report Collaboration meeting 23-SEP-2009
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
G. Dissertori ETH Zürich ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Detector Control and Safety System for the Electromagnetic Calorimeter.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
External Data and DIP Oliver Holme 18 th January 2008.
Tales and mysteries of PVSS in the land of ECAL Alison Lister ETHZ Alison Lister
A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Dave Barney, CERN. Tracking Tools: Introduction  Main Purpose: to keep track of all incidents & interventions at point 5  Interlocks – reasons & follow-up.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
ProtoDUNE SP – Slow control temperature readout setup test
CMS-ECAL DCS Prototype
CMS-ECAL Front-End monitoring Matteo Marone
UK CMS Oversight Committee Mtg
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Outline News The M0’ experience Current activities Plans/Next Conclusions

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Specification document finally released (today) collected comments from P. Bloch and from the members of the DCS group circulate now inside the collaboration Deputy project leader would like to propose Serguei Zelepoukine from IHEP Protvino as Deputy Project Leader News

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Excellent work done by S. Zelepoukine and the Belgrade group Precision Temperature Monitoring we can achieve the precision required The ATLAS ELMB is a viable backup solution for the readout system if placed not too close to the detector Safety system A safety system with interlocks to the HV/LV has been built and operated discovered large sensitivity of the PLC to the environmental noise --> to be propagated to JCOP/ITCO PVSS on Windows: not yet as stable as we would like... no interface yet to the DAQ The M0’ experience

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Sensor issues Humidity sensors : together with Tracker DCS group a large number of possible sensor types is currently evaluated, tested, irradiated etc. Specifications (chosen sensor) hopefully by end of the year. Pressure/flow meters : together with Tracker DCS group and Frank Glege we are elaborating a little requirements document in order to start a discussion/collaboration with the cooling people. We would like that they choose and install the sensors, and that we take care of the read out and safety actions. Current activities

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS RBFE board Two technicians from Protvino together with the LHC-ACR group study and test of the RBFE (Resistance Bridge Front End) board for sensor excitation and signal conditioning before sending over long signal cable want to combine this with a MUX --> investigations of MUX candidates (issue : radiation hardness) Current activities...

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Lab test of Keithley readout system Student from ETH together with W. Lustermann and S. Zelepoukine Current activities... study of cascaded MUXing system analysis of switching time limits ---> current limit coming from the RBFE board analysis of signal precision over long cable (120m) test will be carried on by a further ETH PhD student

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Software ETH student (Alison Lister) has started to work on software framework, as well on first PVSS set-up for the temperature monitoring will also look into the communication with XDAQ and databases Cabling Serguei has started to discuss with the CMS Integration group about the cabling layout for DCS : Current activities....

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS ECAL DCS cabling and front-end electronics layout Counting room CMS Barrel Endcap Barrel Electronics

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS TMUX Keithley x 10 x 45 PC 45 TMUX Keithley x 45 PC 45 TMUX 50 m 45 CAN ELMB 100 m PC DetectorBalconyCounting room TMUX Keithley x 10 x 45 PC CAN ELMB 6 x 10 PC

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Irradiation tests plan to go with a small group to PSI (end of Nov) in order to do irradation tests of the RBFE board components SM0 integration test we start ordering items bring some of the M0’ setups back to B27 to be used there for those tests Plans/Next

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Overall good momentum My worries will be difficult to keep this momentum over the winter months, since the main actors will not be at CERN or be overloaded with other duties have to well define the activities which can be carried out in the home labs DCS for Preshower : need urgently resources A question has anybody in CMS in general thought about the issue of Galvanic isolation (detector - counting house) for the DCS system?? Conclusions