S.DusiniOPERA meeting, LNGS 19-23 May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
The LNF test setup Status as of Geometry of LNF setup Top and bottom trigger counters 4 KLOE-type tracking chambers One BESIII-(COMPASS-)type.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
News on GEM Readout with the SRS, DATE & AMORE
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
Florida Institute of Technology, Melbourne, FL
C.Gustavino, october 28-31, The RPC testing LNGS The RPC testing LNGS Outline : Trigger walls (Glass RPC, Flat Cable Strips,
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
OPERA Coll.Meet. October 2002Luca Stanco - Padova1 1.Status of Magnets and financial orders (including RPC) Mario Spinetti15’ 2.Status of RPC (including.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
C.Gustavino, may 19-23, The Trigger walls of the test LNGS The gas system of the trigger wall is ready only since the last week (delay.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
1 Short Status of TB Analyses in SDHCAL Imad Laktineh.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
MuID Twopack Efficiencies: Measurements with Cosmic Rays & High Voltage inforamtion.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
A. SarratILC TPC meeting, DESY, 15/02/06 Simulation Of a TPC For T2K Near Detector Using Geant 4 Antony Sarrat CEA Saclay, Dapnia.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Vladimir Frolov (Centro Fermi) On behalf EEE-TO group.
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Results with the RPC system of OPERA and perspectives
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
Large CMS GEM with APV & SRS electronics
Han Jifeng BESIII MUON GROUP IHEP, CAS
11th Pisa meeting on advanced detectors
Presentation transcript:

S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost ready Reconstruction and analysis in progress DataBasein progress Conclusion S.Dusini – INFN Padova Bologna – LNF – LNGS - Padova

S.DusiniOPERA meeting, LNGS May 2003 Setup of the Test Test all RPC with cosmic ray to evaluate: –Efficiency –Working point voltage –RPC single rate –RPC current Trigger planes RPC RPC Box zy view Dimension in cm 

S.DusiniOPERA meeting, LNGS May 2003 Gas and HV Gas – 10 th of April: permission to use gas in Lab2 –4 gas line (i-but, Ar, TFE, SF 6 ) –1 gas line for each RPC –For the moment we chose to have 3 RPC in series like in OPERA –Test with standard gas mixture (48% Ar,48 % TFE, 4% i-but) HV –CAEN SY127 with pos. and neg. power supply –RPC current monitored with two 16 ch. nano- amperometer. (The same system will be used for OPERA)

S.DusiniOPERA meeting, LNGS May 2003 Strips and Electronics 50 X + 50 Y panels with 3cm wide strips equipped with 32 ch. MACRO FE cards + inverter for neg. signals. Digital 32 ch. OR (DigOR) used to measure RPC single rate. Read out with CAMAC-STAS controller All electronics tested and ready for data data taking FE card Strip panels Inverter

S.DusiniOPERA meeting, LNGS May 2003 DAQ LabView program written by M.Lindozzi (LNGS) on Linux PC to read –STAS chains –DigOR –RPC currents The DAQ is in debugging phase, possibly ready in 1-2 weeks

S.DusiniOPERA meeting, LNGS May 2003 Reconstruction & Analysis There is a reconstruction prog. written in Fortran by S.D. now used to debug the DAQ and to make the analysis on the first RPC Final goal is to have recon. analysis and online- histograms written with Root (S.Stalio and SD) –Online histograms + event display almost ready (see next) –Recon + analysis 2,3 weeks All the data will be stored in Root files.

S.DusiniOPERA meeting, LNGS May 2003 Histogram presenter & event display screenshot

S.DusiniOPERA meeting, LNGS May 2003 DataBase The test will provide 7 parameters to characterize the RPC –Plateau efficiency  –  of efficiency distribution in bin 10x10 cm 2 –Efficiency map –V knee and V  =10% –Single rate vs. Volt –Current vs. Volt The cuts to reject a chamber are not yet fixed All the data will be stored in RPC database

S.DusiniOPERA meeting, LNGS May 2003Conclusions After some delay (Gas+DAQ) the RPC Cosmic Test is starting 2 RPC box are already in the test Due to the delay of trigger walls for the moment we will run in auto-trigger mode (majority N DigOR >4) Debug all the system Accumulate statistic to set quality cuts In a short time we will be running testing 36 RPC per week.