Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)

Slides:



Advertisements
Similar presentations
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Update on Q1 TAS REGION (18 to 22m), layouts. D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting1.
Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
F. Savary on behalf of the WP11 team Input from V. Baglin, D. Ramos.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Dean R Walters November 15, 2004 Integration of the Vacuum and Diagnostics with the Undulator By Dean R Walters APS.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
1 28-Nov-2011 Dog-leg meeting «BE/RF» Current 30 GHz layout CTF3 CTF2 Overmoded 90 bend Mode converter Ø50 circular waveguide (existing line) 326 mm 1.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
Cooling of NA62 vacuum system November 11 th, 2014 E. Harrouch, EN-MEF, on behalf of the NA62 Vacuum Team.
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
ELENA Source Vacuum System, LNS R. Kersevan Integration and Installation Committe – 18 Sept 2014.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
V. Bobillier1 Cable installation status.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Year 7: Length and Area Perimeter The perimeter of a shape is the total distance around the edge of a shape. Perimeter is measured in cm A regular shape.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
CLIC Permanent Magnet Quadrupole update 27 th January 2011 Mechanical Engineering status update N. Collomb1.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Standard Grade Prelim Revision The topics we will be revising are: 1. Wednesday 17 th November – Pythagoras 2. Monday 22 nd November – Statistics 3. Tuesday.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
PANDA Collaboration Meeting, GSI November 2010 H.O. Cluster-Jet works at GSI Herbert Orth, GSI Darmstadt, Germany Title.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
A liner in the Corrector package A Cu liner has been inserted in the gap between the CBT and the coil aperture of all the corrector package elements (see.
The reading is 7.38 mm. The reading is 7.72 mm.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
A polygon is a geometric figure with three or more sides.
Booster ring ICL /06/14 Nicolas Chritin EN/MME Cedric Delory EN/MME
Preliminary Y-chamber specifications – First draft
29.01 Past Paper Questions – National 5 Mathematics
EBTF Design Review Technical Meeting Group
WP 3 coordination meeting Saclay May 2008
Design of Q1 TAS Vacuum Sector
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Beam Finder Wire Assembly Undulator System
Unit 9. Day 17..
BGC Collaboration Meeting –
Presentation transcript:

Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)

Lukasz Krzempek TE-VSC-DLM Status from 24 th Nov

Lukasz Krzempek TE-VSC-DLM Gate valve assembly - TAS side

Lukasz Krzempek TE-VSC-DLM Gate valve assembly - TAS side

Lukasz Krzempek TE-VSC-DLM Status of vacuum layout – 24 th Nov 2015 ATLAS experiment – general side view Status of vacuum layout – 15 th Dec Bellow removal from TAS side -> saved ~70mm 2.All layout moved towards TAS 3.Envelope length-1789mm Layout length (TAS-IR gate valve isolation)-1785mm Gate valve from IR side intended to install on chamber support Envelope length-1789mm Layout length (TAS-IR gate valve isolation)-1854mm

CMS experiment – general side view Lukasz Krzempek TE-VSC-DLM To keep angle valves in available area, assembly of TAS gate valve moved 70mm towards experimental cavern Distance layout from TAS - 80mm- 24 th Nov Distance layout from TAS - 150mm- 14t th Dec 2.53mm

Lukasz Krzempek TE-VSC-DLM d models: ST – CMS ST ATLAS