Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)
Lukasz Krzempek TE-VSC-DLM Status from 24 th Nov
Lukasz Krzempek TE-VSC-DLM Gate valve assembly - TAS side
Lukasz Krzempek TE-VSC-DLM Gate valve assembly - TAS side
Lukasz Krzempek TE-VSC-DLM Status of vacuum layout – 24 th Nov 2015 ATLAS experiment – general side view Status of vacuum layout – 15 th Dec Bellow removal from TAS side -> saved ~70mm 2.All layout moved towards TAS 3.Envelope length-1789mm Layout length (TAS-IR gate valve isolation)-1785mm Gate valve from IR side intended to install on chamber support Envelope length-1789mm Layout length (TAS-IR gate valve isolation)-1854mm
CMS experiment – general side view Lukasz Krzempek TE-VSC-DLM To keep angle valves in available area, assembly of TAS gate valve moved 70mm towards experimental cavern Distance layout from TAS - 80mm- 24 th Nov Distance layout from TAS - 150mm- 14t th Dec 2.53mm
Lukasz Krzempek TE-VSC-DLM d models: ST – CMS ST ATLAS