Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.

Slides:



Advertisements
Similar presentations
S Y S T E M S E N G I N E E R I N G.
Advertisements

Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
P09233 Flight Parameter Measurements Michael Skube P09233
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Final Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
INDUSTRIAL & SYSTEMS ENGINEERING
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
P09233 Flight Parameter Measurements Michael Skube P09233
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
Development Processes and Product Planning
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
EDGE™ Final Project Plan P09701 – Corning Tropel LightGage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel.
Jon Klein Project Manager Kyle Menges Technical Lead Priya Narasimhan Electrical Engineer Julie Coggshal Industrial and Systems Engineer Christine Lowry.
P09651 – Visible Spectrum Imaging System Lead: Dave Lewis Brian Russell Aditi Khare.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
MSD II –Managerial Presentation Spring 2009 P09454: Design & Testing of Centrifugal Pump Components.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Best Practices In Design Outcomes Of A Survey P. H. King, PhD, PE Joan Walker, PhD Vanderbilt University.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Problem Definition Review Reciprocating Friction Tester.
IAN J. FRANK (ME) Preliminary Project Plan P08427 – LED Lighting Technologies.
ME 481 Mechanical Engineering Design Projects Project Management.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number:
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Tata McGraw CHAPTER 4 Product and Service Design.
First week. Catalog Description This course explores basic cultural, social, legal, and ethical issues inherent in the discipline of computing. Students.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Project Final Presentation Joe Featherall.
Rishitha Dias (IE): Team Manager Kevin Klucher (ME): Technical Lead John Hayles (ME): Design Engineer Reme Meck (ME): Turbomachinery Expert P09454.
Project Kick Off R09233: Flight Parameter Measurements Michael Skube (ME)
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
EDGE™ Final Project Plan Presentation P08043 – Mass Spectrometry Sample Preparation.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
EDGE™ Concept Level Project Plan P09103 Rocket Self-Destruction Device Chris Natoli (ME)
EDGE™ Project Status Update P09023 – Air Muscle Artificial Limb Next Generation Jim Breunig (ME)
P10452 Dresser Rand Compressor Installation and Utilization Joe Bykowicz (ME) Dresser Rand Model.
Turbomachinery Flow Visualization P08453
AY: – Track Project Lead Airframe A Matt Greco P09231
Concept Level Project Plan P08008 – ArcWorks Process Improvement
End of DPM Presentation P08405—Novel Materials Technology
Software Requirements
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
School of EE and Computer Science
Right Move, Right Place, Right Time
Project Final Presentation P09221 – Innovative Composite Parts for a Formula SAE Racecar Tiago Santos (ME)
P08453: Turbomachinery Flow Visualization
P10457: D-R Process Improvement
P10452 Dresser Rand Compressor Installation and Utilization
Project Readiness Review P10029 – Air Muscle Artificial Limb
Heart Pump and the Circulatory System P17080
Final Status Update P09006 – Upper Extremity Exerciser
Final Project Plan P09004 – Eye Movement Tracking Device
Turbomachinery Flow Visualization
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
Presentation transcript:

Allen Luccitti (ME)

Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through a LABVIEW GUI. ▫ Optically clear pump housing ▫ Interchangeable parts Key Business Goals ▫ Demonstrate fluid flow in Turbomachinery ▫ Demonstrate design principles of Turbomachinery ▫ Teach fundamentals of Fluid Mechanics to engineering students ▫ Basis for research projects for graduate students

Mission Statement Primary Market ▫ RIT undergraduate and graduate engineering students ▫ RIT engineering faculty Secondary Market ▫ Dresser Rand Corporation Assumptions and Constraints ▫ Overall foot print of test stand ▫ Available space ▫ Fabrication of specialty parts Stakeholders ▫ RIT engineering students ▫ RIT engineering faculty ▫ Dresser Rand Corporation

Staffing Requirements ME 1 Allen Luccitti ▫ Over see day to day activities of design team ▫ Provide support in necessary areas ▫ Integration of systems ME 2 ▫ Material selection for pump housing ▫ Design of pump housing and components ▫ Test stand design ME 3 ▫ Design and develop closed loop fluid flow path and storage ▫ Test stand design

Staffing Requirements ME 4 ▫ Work with EE on sensor selection and data acquisition concepts ▫ Determine sensor placement in system ▫ Test stand design EE 1 ▫ Sensor selection ▫ Design power system for sensors, data acquisition, and pump EE 2 ▫ Develop LABVIEW GUI to run test stand ▫ Develop algorithms for data acquisition ▫ Provide support to EE 1 as needed

Intellectual Property Considerations  Dresser Rand Corporation Any information provided in support may need to be classified as Private  Pump Design modifications of pump housing and pump  Public Information All relevant information not marked as privet shall be made available to stakeholders

Preliminary Work Breakdown Structure Week 1  ME 1 Allen Luccitti Introduce project Lead team in initial benchmarking Literature search of existing test stands Assign tasks for following weeks  ME 2 Participate in benchmarking of pump Research materials for pump housing

Preliminary Work Breakdown Structure Week 1 ME 3 ▫ Participate in benchmarking ▫ Research pump flow theory ME4 ▫ Participate in benchmarking ▫ Research available sensors EE1 ▫ Participate in benchmarking ▫ Research available sensors and DAQ hardware EE 2 ▫ Participate in benchmarking ▫ Work on LABVIEW tutorials

Preliminary Work Breakdown Structure Week 2  ME 1 Allen Luccitti Lead team in brain storming of alternative solutions  ME 2 Generate alternative solutions to pump housing  ME3 Research flow analysis models  ME 4 Comparison of available sensors Work with EE 1 on hardware selection  EE 1 Data acquisition hardware comparison  EE 2 LABVIEW tutorial training

Preliminary Work Breakdown Structure Week 3 ME 1 Allen Luccitti ▫ Lead Team in concept development ▫ Pump selection ME 2 ▫ Material selection for pump housing ▫ Develop concepts for pump modifications ME 3 ▫ Generate ideas for flow system design ME 4 ▫ Sensor selection ▫ Generate Ideas for sensor integration EE 1 ▫ Data acquisition hardware selection EE 2 ▫ Work on LABVIEW training

Team Values and Norms  Values Members will be on time to all meetings Each member is expected to act in a professional manner Work is expected to be thorough and accurate Each team member should be dedicated to the success of the project

Grading and Assessment Scheme  Grading will be based on several factors Peer evaluations Quality of work Commitment to the project

Required Resources  Dedicated work area for benchmarking  Machine Shop  Computer labs with solid modeling software  LABVIEW tutorial

Customer Needs 1. Pump 1. Transparent pump housing 2. Can be run on available power supplied in class room 3. Interchangeable parts 2. Test Stand 1. Small footprint 2. Transportable 3. Aesthetically pleasing 4. Easily Maintained 3. Flow Loop 1. Variable resistance 2. Pressure monitoring 3. Control with LABVIEW

Risks and Issues  Safety Moving parts Grounding of stand Safe materials  Time CNC of specialty parts Lead times on other parts  Experience of team members

Outstanding Items  Establishing target specifications  Refine three week work breakdown structure  Resource allocation  Remaining stakeholder interviews