Workshop on ARD at FNAL 1 CDF DØ Tevatron Main Injector\ Recycler Antiproton source Proton source V.Shi ltsev (FNA L) - EPA C'08 NML.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SCRF ACCELERATOR INDUSTRY STEWARDSHIP OUTLOOK Ken Olsen SPAFOA Fermilab Meeting Nov. 13, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
F Fermilab’s Muon Collider Task Force: Overview, Status and Plans Vladimir Shiltsev Fermilab AAC, August 08, 2007.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
The Future of Accelerator R&D at Fermilab Steve Holmes Accelerator Physics & Technology Seminar January 30, 2007.
Future Accelerators at the High Energy Frontier
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
MCTF Fermilab’s Muon Collider Task Force. MCTF - Shiltsev 2MCTF The need Charge/deliverables Current activities Research Directions/Org Structure First.
F Project X Overview Dave McGinnis October 12, 2007.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Muon Collider R&D Co-ordination MCTF. INTRODUCTION 2 2 Steve Geer MUTAC REVIEW April 2007 BNL Steve Holmes, March 13 th, 2007: “ … MCOG ask the NFMCC.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Fermilab Accelerator R&D Strategy Steve Holmes URA Visiting Committee May 8, 2006.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Fermilab’s Muon Collider Task Force: Status and Plans Vladimir Shiltsev Fermilab NFMCC CM - ShiltsevMarch 17-20,
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Fermilab Project Overview Michael Lindgren 2014 EVMS Surveillance Review 10-Dec-2014.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Muon Accelerators for Particle Physics Working Group Summary Conveners: Jaroslaw Pasternak Imperial College/RAL STFC Mark Palmer Fermilab Proton Accelerators.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Overview and Strategy Stuart Henderson Fermilab Accelerator Advisory Committee November 7-9, 2011.
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Ionization Cooling for Muon Accelerators Prepared by Robert Ryne Presented by Jean-Pierre Delahaye MICE Optics Review Jan, 2016 RAL.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
Muon Accelerator Program: Overview & Directions Mark Palmer June 19, 2013.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
Opportunities from the Intensity Frontier to the Energy Frontier J.P.Delahaye/SLAC.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Fundamental aspects of muon beams submitted to Accelerator R&D panel for GARD funding consideration by J.P.Delahaye/SLAC & Robert D. Ryne/LBNL.
Image courtesy of Oak Ridge National Laboratory Eric R. Colby † Office of High Energy Physics Office of Science U. S. Department of Energy Office of Science-Led.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Long-Term Muon Collider Vision Vladimir Shiltsev Fermilab MUTAC - ShiltsevApril 8-10,
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
US strategy and plans for future Lepton Colliders
M. Migliorati, C. Vaccarezza INFN - LNF
Presentation transcript:

Workshop on ARD at FNAL 1 CDF DØ Tevatron Main Injector\ Recycler Antiproton source Proton source V.Shi ltsev (FNA L) - EPA C'08 NML

Workshop on ARD at FNAL Workshop on Directions of Future Accelerator R&D at Fermilab “Welcome” or “Goals of This Workshop” Vladimir Shiltsev Accelerator Physics Center, FNAL 11 May

Workshop on ARD at FNAL Big Picture  LHC is built and will run in 2009:  energy frontier moves overseas for next decade(s?)  confidence in getting new physics insight ~  Growing consensus on the next machine (P5)  should be lepton-lepton collider  ILC energy reach may not be enough  multi-TeV  attention to alternatives (P5 report)  Alternative schemes:  CLIC e+e- linear collider (CDR by ~2010)  plasma-wake e+e- linear colliders (emerging)  muon collider (aims FSDR by 2013) 3

Workshop on ARD at FNAL  Operation:  Run II:  exp: till 2013  NOvA , later, mu2e  Long-base neutrino/DUSEL X  Construction:  NOvA: now-2012 mu2e:  Project X  Lepton collider(ILC,MC) or NF: 202X, ~5yrs  R&D:  SC RF and Project X:  lepton colliders now–2013 (eg MC FSDR)  early 20’s  general and Advanced ARD (ongoing) 4 Fermilab: Years Ahead as we see them now

Workshop on ARD at FNAL Project-X and Muon Complex  Initial Configuration Document: 1 8GeV  MC/NF need: different beam structure

Workshop on ARD at FNAL Project-X Timeline  Collaboration is being formed (08-09)  FNAL Director’s Preliminary Cost and Schedule Review (Mar’09)  Technically limited schedule:

Workshop on ARD at FNAL Has to be upgradeable to NF/MC Front End (2-4 MW) (Under exploration) Use of SC RF Linacs for generation of ~10MW (CW?) beams for energy applications (ADS) ”Project X” : Choices and Future

Workshop on ARD at FNAL Muon Collider detector  NF To DUSEL

Workshop on ARD at FNAL Where Do We Want to Be and When?

Workshop on ARD at FNAL The 5 Year Plan  Will address key R&D issues, including  Maximum RF gradients in magnetic field  High pressure RF tests with ionizing beam  6D cooling section prototype  Full start-to-end simulations  Proton bunching ring design  Magnet designs for acceleration, collider and HTS  Deliverables by ~2013:  Muon Collider Feasibility Report and -Factory RDR  Results of hardware R&D to make technology choice  Cost estimate  Funding increase needed to ~20M$/yr (about 3x present level); total cost 90M$

Workshop on ARD at FNAL US Muon Accelerator R&D Program 5 yr plan ( ) Program Management 1. Design 1.1 Physics & Detector 1.2 Design& Simulations 1.3 Cost Estimate 1.4 NF IDS/RDR 2.Components and tests 2.1 MICE 2.2 Cooling Ch. RF 2.3 Magnets 2.4 6D Cooling comp &test 2.5 Other R&D

Workshop on ARD at FNAL 5 yrs of Muon Collider R&D

Workshop on ARD at FNAL 13 MTA=MuCool Test Area  cryogenic capabilities  RF power at 201 MHz & 805 MHz  Liquid H 2 absorber filling capability  5 T SC Solenoid with 30 cm bore (805 MHz Cavity fits inside)  400MeV/c protons

Workshop on ARD at FNAL General and Advanced ARD at FNAL  Carried Out at A0 Photoinjector  Technology of high brightness sources  Many expt’s incl. round-to-flat transform, emittance exchange  Will move out of A0 after end of Run II and expand in NML:  More in Mike Church’s talk  Will capitalize on investment in SC RF technology and infrastructure  planning for Users’ Facility (probably hosted by FNAL, ANL and UChi) where Lab and University groups can come and do Acc.R&D  got ARRA funds to construct NML facility extension fopr the Users’ Facility  The NML will be the largest AARD Facility in the US  Note that smaller facilities will be possibly available, too 

Workshop on ARD at FNAL FNAL Complex Now: 10 Machines

Workshop on ARD at FNAL So, suitable facilities/setups  Running Accelerators:  surely, with focus on operations, R&D possibilities will be limited  NML(New Muon Lab)  MDB (Meson Detector Building):  HINS: 30-60MeV H- linac, Pr-X front end: cryo, RF, etc  M-Test area : low rate secondary particles available  Misc.:  Magnet and SC RF Test facilities in TD (for hardware tests)  E4R test of fast cycling magnets  Unemployed e-cooling and e-lenses after end of Run II  Small areas here and there…

Workshop on ARD at FNAL Support for Accelerators and for Accelerator R&D in DOE’s Office of Science Patricia Dehmer Deputy Director for Science Programs & Acting Director Office of Science, U.S. Department of Energy Download this talk at AAAS Meeting 13 February 2009 OFFICE OF SCIENCE

Workshop on ARD at FNAL 18 Short-term, Mid-term, and Long-term Activities

Workshop on ARD at FNAL 19  HEP is developing a national accelerator R&D stewardship effort  Input will be sought via a workshop (late 2009) that examines the uses of accelerators throughout society; the desired performance characteristics of these and future accelerators; and the R&D efforts in the private and government sectors.  The workshop will address:  current state of the art and practice;  accelerator improvements to meet existing and future stakeholder needs;  R&D efforts currently underway or planned.  Broad attendance from stakeholders in medicine, industry, security (including energy and defense), and science National Accelerator Stewardship

Workshop on ARD at FNAL 2 ½ Days of the Workshop  Monday 05/11:  reception  overview talks by M.Tigner and M.Church  Tuesday 05/12  AARD: other facilities, possibilities for NML  AM conveners: P.Piot, M.Church  PM conveners: K.J.Kim, S.Nagaitsev  Workshop dinner  Wednesday 05/13:  High Intensity R&D: M.Tigner, P.Spentzouris  ADS and Medical : S.Schriber, W.Chou  summaries of 3 sessions: conveners (X,Y,Z – TBD) 20

Workshop on ARD at FNAL Charge to the Workshop  solicit and evaluate ideas that could be incorporated into a possible accelerator R&D program based on the ILC Test Accelerator in the New Muon Lab (NML) at Fermilab, which is currently under construction (including ideas for improving and refining the current NML design to further enhance its R&D potential)  solicit and evaluate advanced accelerator R&D proposals specific to enhancing the potential of ongoing and planned Fermilab R&D efforts, including Project X, ILC, and Muon Collider (with emphasis on efforts that are synergistic between these programs and/or utilize currently existing or planned facilities)  solicit and evaluate ideas for future accelerator applications of great potential but not yet part of the current Fermilab planned program such as medical accelerators and accelerator driven systems (ADS), including those based on the currently envisioned Project X facility. 21

Workshop on ARD at FNAL Outcome of the Workshop  Better understanding :  Fermilab people to understand broader picture  Collaborators – possibilities at Fermilab  Written report (conveners and OC)  to FNAL management, in 6 weeks (by June 22), be presented at the FNAL DoE S&T Review (early July)  will review the motivation, relevance, and uniqueness of each R&D component.  used as the basis for a substantive R&D proposal for NML and the basis for further augmentation of the Fermilab accelerator R&D program  input for future collaborative agreements/proposals 22

Workshop on ARD at FNAL 23 Welcome to Workshop Thank You For Coming! Speakers, Conveners, Participants We look for “brainstorming” Any Ideas Welcome Conveners will do extra work Summarize presentations and discussions To help them, please conclude your talks with: “Therefore, I(We) Suggest: a) … b) … c)…” So :