Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation02.12.20091 WG FM Correspondence Group on GSM-R ETSI & GERAN update on ER-GSM band.

Slides:



Advertisements
Similar presentations
3.7) On-going activities within CEPT/ECC Thomas Weilacher Vice Chairman of CEPT/ECC Working Group FM (Frequency Management)
Advertisements

Activities in CEPT ECC/WGFM/ Project Team FM54
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 1 1 All you always wanted to know about.
MCC 3G and GSM Specification Handling Ian Doig, MCC.
Page 1 Appendix O to the ACP WGM/8 Report ETSI Brief Note that the following is an edited version of a presentation given to cover status of draft EN 302.
Doc.: IEEE /xxxxr0 Submission January 2010 Stephen McCann, RIM January 2010 Stephen McCann, RIMSlide 1 ETSI ERM TG11 #23 Meeting Date:
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
Submission doc.: IEEE /0375r1 Mar 2015 John Son, WILUS InstituteSlide 1 Minimum Resource Granularity in OFDMA Date: Authors:
1 Progress made in specifying the GERAN Andrew Howell, Chairman (Motorola) Marc Grant, Vice-Chairman (Cingular Wireless)
1 On the road with 3GPP 3GPP’s Long Term Evolution and System Architecture Evolution projects.
Coexistence challenges in the UHF band Bruno ESPINOSA European Communications Office (ECO) Overview of CEPT/ECC actions.
World Class Standards Coexistence plugtest: CEN DSRC CEN DSRC / ITS-G5 coexistence RTTT / CEN DSRC Coexistence plugtest Ispra, Italy 4 July 2011 Anders.
#UIC ERTMS World Conference 1. – 3. April 2014, Istanbul UIC Rail System Department UIC ERTMS World Conference Dirk Schattschneider UIC Frequency Manager.
GSM onboard aircraft : SE7 activities Joint meeting, ETSI – 09 September GSM ONBOARD AICRAFT CEPT / SEWG / PT SE7 Jean-Philippe Millet, ANFR
GSC#8 April 2003, DRAFT GSC-8, OTTAWA Slide 1 RAST 10/2-3 Generic Standards
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
CEPT/ECC-ETSI Co-operation Process
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
Doc.: IEEE /1256r0 AgendaRich Kennedy, BlackBerry IEEE Regulatory SC DRAFT Dallas Meeting Plan and Agenda Date: Authors: November.
Rue de la Science 14, 1040 – Brussels [Belgium] T: F: July
FM 54 GSM-R points ERA ERTMS Unit London, 22 February 2016.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
Doc.: IEEE /??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007.
EUROPEAN COMMUNICATIONS OFFICE Nansensgade 19 DK-1366 Copenhagen Denmark Telephone: Telefax:
Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation ETSI RTEGSM-R #18 ETSI & GERAN update on ER-GSM band introduction 27.
LTE Standards Strategy for Public Safety Andrew Thiessen.
1Proprietary and Confidential GERAN WG3 #70 Meeting Report - Plenary Presentation – GP
ERM/MTS STF proposal on formal Phy measurement framework Friedbert Berens Vice Chair ERM TGUWB Presentation to ERM, July 2010.
Freddie McBride, European Communications Office
Ca-US-ECC Cooperation 2011
1210 MHz of harmonised spectrum (ECC framework)
Month Year doc: IEEE /xxxxr0
ETSI technical activities report for ECC March 2017
Status Report RAN WG6 to TSG-RAN #73
Coexistence challenges in the UHF band
Status Report RAN WG6 to TSG-RAN #73
IEEE RR-TAG Teleconference Plan and Agenda
Reconfigurable Radio Systems Activities in ETSI
Reflection Of The NJFA In The ERC Report 25 (ECA Table) And Relation To EFIS And To The RSPP Inventory CEPT/ECC Civil/Military Meeting, November.
STF 397 report for SE24 M65_25R0_SE24
Activities in CEPT-ECC potentially relevant for UIC
CEPT/ECC-ETSI Co-operation Process
Railway Mobile Communication System Future Dan Mandoc,
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
CEPT/ECC Activities on ITS
Broadband PPDR frequency situation in Europe
3GPP Status.
Proposed response to 3GPP ED request
Radio spectrum for present and future rail transport needs
Radio spectrum for future railway applications
Month Year doc: IEEE /xxxxr0
eCall: Creating momentum towards the networked car
Liaison statement and Request for Specification and Implementation of Harmonised Pan-European Emission Limits relevant for the GSM-R Operating Range.
EU-US-JP ITS Steering Group Annual Meeting 2018
January 19 March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: European Regularity Considerations.
What should WG do about the ED related request from 3GPP RAN1?
5 GHz Band – Vehicle Wi-Fi Usage Regulation Status
eCall: Creating momentum towards the networked car
3GPP RAN1 and RAN4 status on NR-Unlicensed and LAA
Month Year doc: IEEE /xxxxr0
GERAN update on ER-GSM band
May 19 March 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: European Regularity Considerations.
'eCall: Next Steps for Deployment' Competititiveness of European Automotive Software Industry WS Brussels, 28/04/10 Emilio Dávila González
Ca-US-ECC Consultation 2012
ECC actions on interference from 5 GHz RLAN into meteorological radars
ETSI BRAN Update (IEEE Co-Existence Workshop)
Presentation transcript:

Kapsch CarrierCom ||Titel der PräsentationUntertitel der Präsentation WG FM Correspondence Group on GSM-R ETSI & GERAN update on ER-GSM band introduction CG-GSM-R(13)036

Kapsch CarrierCom ||ETSI & GERAN update on ER-GSM band introduction2UIC RF WS Introduction ■ Standardisation work needed to include ER-GSM band into relevant Standards ■ ETSI TC RT activities  closed ■ 3GPP GERAN activities  almost closed ( * ) ■ ETSI MSG activities  pending ( * ) see slide P-GSM E-GSM R-GSM ER-GSM UL DL

Kapsch CarrierCom ||ETSI & GERAN update on ER-GSM band introduction3UIC RF WS Frequency ecosystem in the Standards TSG GERAN GSM GPRS EDGE 3GPPETSI TC RT GSM railway MSG European Harmonized Standards TS TS TS (RF parameters) TS TS (conformance testing) EN defining R-GSM band EN defining R-GSM band TSG CT CN Function (VGCS, billing) TS (signalling capabilities) Change Request needed to refer to ER- GSM band New version of 3GPP specification referencing ER- GSM band Harmonized Standard = applicable at EU level 3GPP step almost concluded

Kapsch CarrierCom ||ETSI & GERAN update on ER-GSM band introduction4UIC RF WS 3GPP GERAN activities 1/3 ■ During 3GPP GERAN #59 several Change Requests were approved ■ CR to TS High level description of frequency band and RF channels ■ CR to TS Description of the RF parameters to be used over the new 3 MHz ■ CR to TS Corrections needed with the use of ER-GSM 900 term in TS ■ CR to TR Summary of the coexistence studies captured in this report ■ CR to TS New indicator in the Classmark 3 for ER-GSM MS signalling ■ Compromise found between public and railway operators ■ Conditions to use ER-GSM spectrum in case of uncoordinated deployment of new ER-GSM equipment close to a legacy equipment already deployed in E-GSM band described in TS (see next slide) ■ In case of coordinated deployment higher output power can be allowed ER-GSM standardisation major milestone accomplished with the compromise found at GERAN level

Kapsch CarrierCom ||ETSI & GERAN update on ER-GSM band introduction5UIC RF WS 3GPP GERAN activities 2/3

Kapsch CarrierCom ||ETSI & GERAN update on ER-GSM band introduction6UIC RF WS 3GPP GERAN activities 3/3 ■ All "Core Specifications" finalized, Test Specifications remaining ■ CR to TS Test Cases for ER-GSM mobiles ■ CR to TS Test Cases for ER-GSM base stations ■ Test Specifications important for Harmonized Standards ■ Test Cases are needed in EN and to demonstrate compliance of equipment covering the essential requirements of article 3.2 of the R&TTE Directive ■ ETSI Technical Committee in charge of those EN is MSG

Kapsch CarrierCom ||ETSI & GERAN update on ER-GSM band introduction7UIC RF WS CEPT/ECC discussions ■ 3GPP GERAN liaised about ER-GSM CRs approval (Aug. 2013) ■ 3GPP RAN4 and ETSI TC MSG for the specification part ■ ECC PT1 and ECC WG FM for the regulatory part ■ ECC PT1 liaised back (Sept. 2013) ■ Asking for clarifications about the working assumptions used to derive the ER-GSM RF parameters, in particular ■ Attenuation slope 6 and 11 dB/MHz ■ Minimum Coupling Loss between ER-GSM BS and UTRA/E-UTRA BS ■ 3GPP GERAN provided answers (Nov. 2013) ■ Feedback on working assumptions for attenuation slope and Minimum Coupling Loss

Kapsch CarrierCom ||ETSI & GERAN update on ER-GSM band introduction8UIC RF WS Next steps ■ RTEGSM-R #16 meeting on January in Sophia-Antipolis ■ Drafting of Test Specifications Change Requests ■ 3GPP GERAN #61 meeting on Frebruary in Sophia-Antipolis ■ Presentation of Test Specifications Change Requests ■ ETSI TC MSG #37 meeting on March in France (TBD) ■ Start of the EN update process?

Kapsch CarrierCom || Untertitel der Präsentation9 Titel der Präsentation Thomas Chatelet Railways Regulatory Affairs Railways Customer Solutions Management Kapsch CarrierCom France SAS SITE DE IMMONTIGNY | 1 RUE JEAN PIERRE TIMBAUD | CS | SAINT QUENTIN EN YVELINES CEDEX Phone +33 (0) | Mobile +33 (0) | Thank you for your attention.