ESS (vacuum) control system Daniel Piso Controls Division www.europeanspallationsource.se February 20, 2013.

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
ESS Test and Prototyping Activities Daniel Piso Ferńandez December 4, 2014.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Time Stamping and archiving of PLC data
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
INTRODUCTION Chapter 1.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
EtherCAT for Advanced LIGO
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
ESS Controls Infrastructure Timo Korhonen ICS Feb.. 4, 2015.
Readout & Controls Update DAQ: Baseline Architecture DCS: Architecture (first round) August 23, 2001 Klaus Honscheid, OSU.
EPICS Collaboration Meeting Spring 2010, Aix France, Jun 2, 2010 Page 1 ITER CODAC COntrol, Data Access and Communication System for ITER Anders Wallander.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
Institut für Computertechnik ICT Institute of Computer Technology Remote Control and Reconfiguration of Laboratories for Education and Training Vienna.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
FAIR Accelerator Controls Strategy
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System Serial Communication, simple,
ADAM-4000 Modbus I/O Market Focus Mark Lin eAutomation Div. PSM Industrial Automation Group
Vacuum Control System AdV architecture similar to the existing one one autonomous station per “pumping unit” (about 30 units : tower, tube station, cryopumps.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
CEA DSM Irfu July 19th 2013-Françoise Gougnaud - Status of EPICS control for ECCTD 1 Françoise Gougnaud Irfu/SIS.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
60kW Thermosiphon control system
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Working with the RAPID-CIM Software Dr. Richard A. Wysk Industrial and Manufacturing Engineering PSU.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 New Standards VLT Control System Mario Kiekebusch (On behalf everyone who took part.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Status & Plans for WA105 Control System
Process Control System Requirements
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
The ILC Control Work Packages
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
COntrol, Data Access and Communication System for ITER
Plan for controls with the digital platform
PLCs integration into the ICS
ESS Main Control Room & ICS Infrastructure
Safety Readiness Review (SRR) Thomas Hansson, ESH
Ola Ingemansson Electrical & Instrumentation Engineer
Vacuum Control System for Monolith Vacuum
Presentation transcript:

ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013

EPICS DESIGN ARCHITECTURE (I) Epics Domain

EPICS DESIGN ARCHITECTURE (II) EPICS IOC runs on Control boxes 2.Control Box provides the interface to equipment

EPICS

PLC BASED INDUSTRIAL CS 5 Standardized Roboust Long product life time Maintenance support from manufacturer Suitable performance for systems where slow control is sufficient Scalable

EPICS INTERFACES TO HARDWARE (I) 6 1.Control box running EPICS connects to the PLC 2.PLC handles all the logic 3.Preferably, all controllers are connected to the PLC using industry standard protocols (e.g. Profibus, Profinet) 1 2 3

EPICS INTERFACES TO HARDWARE (II) 7 1.Control box running EPICS also connects directly to controllers 2.However, PLC still handles all the logic 1 2

INTERFACES TO INSTRUMENTATION FIELDBUSES 8 Simple usage Easy and cheaper wiring Standardization across controllers Robust and clean interface Simplified maintenance Controllers need to support it Handling big distances Reliable and industry proven standard Higher price of controllers is compensated with less PLC equipment Incompatible with radiation

INTERFACES TO INSTRUMENTATION SERIAL PROTOCOLS (RS485/232) 9 Lose “standard“ More development effort Difficult to mantain Problems with very long cables Not so robust and reliable as profibus or profinet Many diferent logic protocols Ok under radiation

INTERFACES TO INSTRUMENTATION ANALOG/DIGITAL CONNECTIONS 10 Additional connections No clean interfaces Can require special connectors/cables Can handle difficult cases Easy to integrate into PLC I/O Shorter distances

VACUUM CONTROLS SCOPE 11

SUMMARISING 12 PLC based controls and EPICS integration Interfaces to instrumentation -> ProfiBus/ProfiNet, R485, R232, A/D Preferences about vacuum equipment with feedback information (eig. valve is open/close) The list of vacuum devices will allow us to develop a set of activities to prototype and develop also standardized controls for different devices. Software development in different stages: – Manual control of vacuum equipment – Automated control of vacuum equipment – Integrated EPICS HMIs.

Vacuum Integration Test Facility Relevant milestones – Vacuum Test Stand Control System design (Q3-2014) – Vacuum Test Stand ready for operation (Q4-2014)

Vacuum Integration Test Facility(ii)

PLC Test Stand 15

PLC Test Stand (II) 16 Hardware SpecificationsCOMMENT Siemens PLC HardwareDone Rack, Power supply, Ethernet switches, otherDone IOCDone Development PCDone Learning Protocols PLC IOC Modbus TCP/IPEPICS-PLC-profibus-modbus-s7plc-report.doc (Section 3) ProfiBus – documentation of the current stateEPICS-PLC-profibus-modbus-s7plc-report.doc (Section 2) ProfiNet -documentation of the current statePLC-protocols-Profinet.docx ITER Siemens driver Instructions for a simple IOC example: EPICS-Tools-modbus- s7plc-SDDs7plc-casestudy.doc Device support for Modbus Instructions how to configure Modbus EPICS driver: EPICS- Tools-modbus-s7plc-SDDs7plc-casestudy.doc (Section 3) Device support for Siemens direct driver Instructions how to configure EPICS driver: EPICS-Tools- modbus-s7plc-SDDs7plc-casestudy.doc (Section 4) Control System Simulation PLC and SimulinkMatlab-PLC-connection.doc BeckhoffDecided to test Beckhoff solution:. Matlab-PLC-connection.doc

PLC Test Stand (III) 17 General Tasks Hardware selection and procurement Non-PLC hardware procurement Timing and Event Correlation Connect NTP Server with ESS Timing infrastructure to synchronize PLCs Desing an experiment (using triggers) to test how well we can correlate information from different events Distribution of triggers to PLCs and data on demand Cryogenics Controls Setup a cryogenics controls technical group Testing functionality of ITER Framework Testing functionality of UNICOS Testing cryogenics libraries from CERN EPICS support for Profibus DP Have a clear picture on collaborations between institutions on this field Having a decision about which framework to use by the end of this year Vacuum Test Stand Identify requirements Coding EPICS integration+GUI+Alarms+Archiving New technologies & Simulation Explore solutions to use Simulink for system simulation Simba Box Siemens FPGA module EPICS Integration Control Configuration Database Device Configuration Database Cabling database and Naming Conventional Facilities BACnet MPS & PSS Motion Control Draft of activities for 2014

PLC Test Stand (IV) Commodity Solutions 18 IOC

19 Questions?