Tests performed on By Corporate Marketing Department - Tecniplast, Buguggiate -

Slides:



Advertisements
Similar presentations
Chemical Fume hood or Biosafety Cabinet
Advertisements

CESO Education Day November 30, 2004 Shawn Kenny Manager, Central Processing Department University Health Network – Toronto General Hospital.
Purpose of a VPA Filling & Metering Pump… Imagine having an employee who constantly measures out a precise dose of liquid whenever it’s needed.
HEALTHCARE BUILDING AUTOMATION
Anesthesia Apparatus Checkout Recommendations
World Health Organization
1 Utility Systems Process Systems – ‘Direct Impact Systems’ Contact the Product Contact Materials that will Ultimately Become Part of the Product Could.
VALIDATION OF HVAC SYSTEMS
Break Out Session 3: Group A: Ventilation and Air Quality Chris Cosgrove, Cosgrove FDS, Inc.
Effect of Room Ventilation Rates in Rodent Rooms with Direct-Exhaust IVC Systems Roger Geertsema DVM, DACLAM, DAVCPM.
ELECTRONIC LOAD CONTROL METER Installation and Programming.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Bmd Crossvent 3.
Unit 6.2. Mechanical and mixed mode ventilation TB Infection Control Training for Managers at National and Subnational Level.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
1 Week 11 SYSTEM SAFETY Matakuliah: Mechatronics 2 Tahun: 2005 Versi: 1.0/0.
Carbon Management Steering Board 7 th October 2011 Filter Survey - Update CARBON MANAGEMENT BOARD – October 2011.
TMP112 Calibration. Slope 1 (Max) Slope 2 (Max) Slope 3 (Max) Slope 1 (Min) Slope 2 (Min) Slope 3 (Min) The slope regions below were created from characterization.
11 Heating System Operation and Diagnosis.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Blower Door Basics WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Local Exhaust Ventilation
Autoclave Use and Safety
Micro Practical 3 PRINCIPLE AND WORKING OF AUTOCLAVE Dr. Shahzad Ali Assistant Professor Department of Wildlife and Ecology UVAS, Ravi Campus, Pattoki.
Daikin Visit November 7, 2014.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Unit 6.4. Filtration TB Infection Control Training for Managers at National and Subnational Level.
BUILDING MANAGEMENT SYSTEM
Settings & Adjustments. Settings & Adjustments.
Integrated Science Unit 3, Chapter 7.
World Health Organization
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
1 AxiCool Unit Cooler / Evaporator - „Plug & Play“ Fan series GLV955 - GTB/MM-November 2013.
Heat Exchange Ventilation Heat Exchange Ventilation.
General Requirements l MIL specifications and protocol l Fault code handling l Monitoring conditions l Other terminology/structure California Environmental.
Lesson Using Pneumatic Systems. Interest Approach Can you explain how air makes a pneumatic hand tool work?
Sterile Products Lab PHT 434
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Control Theory Control System Objectives  Establish a final condition  Provide safe operation  Eliminate the human element  Assure economical operation.
ABL-14d Able Elective Engines Instructors: George Crowl.
Labs21: Improving the Performance of Laboratories Optimizing Air Changes – one of the Big Hits September 21, 2006 Dale Sartor, P.E. Lawrence Berkeley National.
The Capacitor A capacitor is an electronic device which can store charge. The symbol for a capacitor is: Capacitance is measured in Farads (F) or, more.
By Corporate Marketing Dept. - Buguggiate, Italy -
IsoXL BSL3/BSL4 SYSTEM FOR LARGER ANIMALS By Corporate Marketing Department -Tecniplast, Buguggiate -
Developing the GR1800 “Double Decker” Rat Cage By Corporate Marketing Department - Tecniplast, Buguggiate - Product Description.
Technical Analysis. 1500U Floor area 1500 cm P drawer style Floor area 2064 cm 2 LET’S FOCUS ON IT!
Tests performed on By Corporate Marketing Department - Tecniplast, Buguggiate -
LDS TM The Leak Detection System TM consists of: SENSORS one each cage position DEDICATED RUNNERS attached to the racks frame that keep the sensors in.
Easy FlowTM and Smart FlowTM
HOUSING Division Corporate Marketing Department. Plastic Materials POLYETHERIMIDE (PEI) POLYSULFONE (PSU) PSU 3 years WARRANTY PEI 5 years WARRANTY.
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
FLEXIBILITY = Tecniplast is ready and willing to satisfy all the customers needs and provide the right solution for a professional outcome STAND ALONE.
Rectifier A rectifier is an electrical device that converts alternating current (AC), which periodically reverses direction, to direct current (DC), which.
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
Mintie Technologies, Inc. ECU Product Introduction and Demo/Training Virginia Presentation.
Animal welfare and standardization in Tecniplast IVCs: better research outcomes Stefano Gandolfi Junior Product Specialist Housing Division.
1) The Isocage is a REAL sealed cage - Tight air-proof cage - Risk of cracks (implosion) due to pressure differences in the autoclave - The steam is not.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Performance Verification of AEC Downflow Booth via
Modern Devices: Chapter 5 – Cleanrooms,
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Company MIAB - Mölnbacka Industri AB of Deje, Sweden was established in MIAB provides equipment protecting the environment by removing solvent vapours.
Placement Considerations
“ Highlighting the risks and challenges presented by modern data-center cooling systems in fire detection and suppression applications. “ Dave Boyack Sales.
Introducing: New Circular Fan Coil Units
Test Process “V” Diagram
Leaky Appliance Trigger Rate
Exhaust gas intake to cabin air.
Nafa Tech Seminar Phoenix Arizona 2004
AUTOMATIC AIR-CONDITIONING SYSTEM OPERATION
dzprc 负压隔离器 Negative pressure isolator suzhou dzprc tech Co., Ltd.
Presentation transcript:

Tests performed on By Corporate Marketing Department - Tecniplast, Buguggiate -

Pressure – Airflow relationship Aim: Find the relationship between set pressure and intra-cage ACH (ISON36). Method: Record the exhaust airflow and compute cage ACH, having set the system to -75, -100 and -125 Pa. Repeat the measurement after removing 18 and 34 cages. Results: Findings: With all the cages in place P set point (Pa)Cage ACH With only 2 cages inside rack, the internal pressure is constant and the pressure is the same of the set point The increase of the exhaust airflow is caused by the air sucked from the exhaust nozzles of the cages removed In the positions of the cages removed the supply nozzles get closed and in the remaining cages pressure and ACH are constant

Pressure distribution Aim: Evaluate the homogeneity of the intra-cage pressure across an ISO72N rack. The goal is to stay within ± 10 %. Method: Settings: -100 Pa. Record the intra-cage pressure in key positions through a pressure gauge. Results: Findings: Recorded pressure are within ± 10 % range frontback

Backup battery duration Aim: Evaluate the battery lifetime in case of power failure. Method: Settings: +100 Pa (test performed with ISOcage P system) Switch off the electricity supply Record the electrical tension of the batteries during time Minimal tension required for batteries: 21,6 V (useful to recharge batteries) Results: Findings: Battery lifetime > 48 h tested on a 72 cage places rack, with brand new battery h

Noise Level Aim: Evaluate the noise emitted by an ISO36N. The goal is to stay within below 50 dB. Method: Settings: - 25 Pa; -100 Pa; -125 Pa. Record the noise 1 meter away from the AHU. Results: Worst case: Findings: The noise level emitted by the AHU was below 50 dB even in the worst case (working at -125 Pa)

Static conditions Aim: Evaluate the intra-cage environmental conditions when the cage is not ventilated Method: ISOcage with 5 CD1 mice (>50g) 120g of bedding Detection for 15 minutes of CO2 NH3 O2 CH4 Detection of T and RH for 30 minutes Results: Findings: CO2 overtake the max. accepted level in 15 minutes.

Intra-cage pressure with just one blower working Aim: Validate if the system is able to reach and mantain the set point even if one of the two blower is not working. Method: Settings: -75 Pa, -100 Pa, -125Pa. Intra cage pressures are measured. Results: Findings: Set point was mantained

Validation of decontamination rack Aim: Verify the that autoclave cycles is effective, acting through the opening of the HEPA protected rear valve of the ISOCAGE by means of the ISO decontamination rack. Method: - Three ISOcages, complete with bedding and food. - Four spore strips of 1.9x 106 of Geobacillus stearothermophilus - Autoclave cycle, 121°C – 20 min Results: All cultures of the spore strips were negative after 7 days of incubation at 55° to 60°C. Findings: The possibility to sterilize safely the “ISOCAGE hermetic enclosure” by means of a simple device like the decontamination rack was demonstrated.

Acceptance tests report These tests are performed in 100% of manufactured AHUs: DOP test – filter integrity test Aeraulic test Electical tests Sensor calibration