HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )

Slides:



Advertisements
Similar presentations
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
Advertisements

RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Progress and Plan for Superconducting RF Cavity RF Group.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Current status Arkadiy Klebaner November 21, 2012
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Progress on Hydrogen R&D System
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
1 ESS Cryogenic regulation loops proposal  Thermal shield  Power Couplers double-wall  CM cool down  Stand by and nominal operation  CM warm up Bertrand.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
Cryogenic refrigeration for the XFEL facility. Current status of the commissioning. Wilhelm Hanspeter Grenoble, June 4th, 2015.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
LCLS-II Cryoplant Overview
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Overview of the ESS Linac Cryogenic Distribution System
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
Process Requirements and Design Approach
2K Cold Box FDR Introduction
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Cryomodule test stand at ESS site
He Plant, LN2 Systems and Commissioing
Process Simulation for the LCLS-II Cryogenic Systems
HL-LHC IT STRING and Series test of SC link
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Cryogenic System Operation and the Progress of SSRF II
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
The HIE—ISOLDE Cryogenic System, its Infrastructure and Considerations for Phase 3 O. Pirotte (TE/CRG)
2K Cold Box Process Design
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ILC Experimental Hall Cryogenics An Overview
ESS elliptical cryomodule
Thermohydraulic behaviour of the cryogenic system
Presentation transcript:

HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )

ISOLDE Isotope Separator OnLine Device

The High Intensity and Energy (HIE) ISOLDE project is a overall upgrade of the ISOLDE facility at CERN. Consists in a superconducting linear accelerator of radioactive ion beams to study the nuclear physics. Involves a increase of the intensity and energy in the beam and an improvement of its quality and flexibility.

In order to achieve this energy, 32 superconducting RF cavities and 8 small solenoids, grouped in six cryo-modules (4.5 K), will be installed. To comply with the project requirements it is necessary a new Cryo-station. Such is comprised of a compressor, coldbox and a distribution unit.

CP + CB + Distribution unit CBCB CPCP DWDW JB 5 JB 6 JB 4 JB 3 JB 2 JB 1 RMRM Exp. Hall 170 CM6CM5CM4CM3 CM2 CM1

List racks/cabinets QSR1H-EM12 = 199 QSR1H-EM35 = 199QSI1H-QYE21 = 199 QSC1H-EM02 = 198 QSK1H-QYC31 = 199 QSC1H-QYC01 = 198 QSC1H-EM03 = 198 Exp. Hall 170 QSR1H-QYC11 = 199 QSK1H-QYC32,33,34,42,43 = 199

B KV Motor Booster High-stage

Gas inlet Female rotor Male rotor Gas outlet Casing Radial bearing Input Shaft Hydraulic Cylinder Slide valve Oil

Compressor Stepper Compressors 1 & 2 detail Buffer 1 & 2

Pressure preparation Step 20 Compressor Regulation start request Step 30 CP START Step 40 CP normal run Step 50 CP stopping Step 60 <20%

B. 199

Main characteristics of cryogenic equipment for HIE ISOLDE: Equipment Unit Value Cryoplant: (ex-LEP ALEPH plant) Compressor suction (MPa) Compressor discharge (MPa) 1.4 Nominal throughput (g s -1 ) 160 Cooling power at 4.5 K 630 W & 1.5 g/s liquefaction 2700 W at K Storage: (m 3 STP) 2440 Gas storage at 1.4 MPa (m 3 ) 160 Gas bags + buffer at 0.1 Mpa (m 3 ) 200 Helium Pumping Group: Suction pressure (kPa) 1.54 Discharge pressure (MPa) Nominal throughput (g/s) 2.0

Vacuum System for CB Diffusion pump To pump out the high vacuum insulation spaces in the CB, transfer line and cryostat, two vacuum systems are needed. In the case of the CB it generates high vacuum using a rotary pump (primary) & diffusion pump. With this combination we get =~ mbar

Cold Box

Transfer line

To meet the project needs, Six Cryo-modules, split into two families, will be installed. 4 x 2 x High βLow β 5 RF Cavities & 1 Solenoid 6 RF Cavities & 2 Solenoid Total: 32 superconducting RF cavities & 8 solenoids High βLow β

B. 170 Project phase 3

Current status of the project: phase 1. To be tested in the SM18-M9 over the next months.Currently in operation status at 4.5K. Test in SM18-M9 In position, B.170

Dewar Transfer line + Jumper Box RM Cryomodule Current leads Vacuum CP CB

Cabled signal Profibus PA SC LT FIP

Profibus PA FIP

Profibus PA FIP

Profibus DP Cabled signal

Profibus PA

1 FEC CPU 25 WorldFIP crates in the final phase. 100 agents. 56 channels installed for the infrastructure: - 28 Connected Spare. 768 channels expected for the 6 Cryomodules: ~ 43% declared as spare. ~ 69 connected for the CM in position 2.

InstrumentationAddress devices PT 364 (Vacuum)12 LFC (FT, CV)13…28 1 CPU S Interface ET Link. 16 Couplers PA: 17 Slaves DP: CP nºInstrumentationAddress Coupler Address devices 1&2CL TT's (PT100)4- 3RM (PT, FT, CV)53…10 4Dewar (CV,PT)511…18 5&6JB 1 (CV,PT)63…18 7&8JB 2 (CV,PT)73…18 9&10JB 3 (CV,PT)83…18 11&12JB 4 (CV,PT)93…18 13&14JB 5 (CV,PT)103…18 15&16JB 6 (CV,PT)113…18

Split range is a control configuration used in industrial processes for controlling pressure, temperature or flow. The output signal of a single PID controller is split and sent to two or more control valves. A single process is controlled by coordinating the actions of several valves. E.g. the controller adjusts the opening of the inlet valve when the measured value of the PT is in the range of 0 to 100bar, the outlet valve when is 120 to 200bar and the ventilation valve when is greater than 200bar. PT Vessel SRC inletoutlet vent

Operation Stepper – CM2

Operation StepperOperation Stepper – CM2

First cold down of the HIE cryomodule 1/2

First cold down of the HIE cryomodule 2/2

Cryomodule cryostat measured heat load

Conclusion Cryogenic refurbishing done without main issues. Cryogenic control system is a CERN cryogenic group standard. Commissioning phase with cryomodule cooled down with LHe, progressing well. LHe level remains stable while tests on the solenoid and cavities are progressing. Commissioning with beam expected next October Second cryomodule installation in progress, test in SM18 M9 end of the year.