Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
Novel technologies and materials for thermal management
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
K. Arndt - PurdueTracker Upgrade Workshop - Nov FPIX Mechanical Design & Module Development Alternative layouts of pixel modules on disks to spur.
Phase 1 FPIX mechanics status Phase 1 Pixel Upgrade Workshop - Aug2012 Plenary IV Session1 Kirk Arndt Purdue University for CMS FPIX Mechanical Group S.
CMS Pixel Mechanical FPIX Half Disk Design Updates C. M. Lei Joe Howell Simon Kwan 10/28/2009.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10,
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Arndt & Shipsey - PurduePixel Upgrade Discussion 9-Oct FPIX Material Reduction & Module Development A few alternative layouts of modules on disks.
BTeV Pixel Detector Laurie Ramroth Fermi National Laboratory Under the direction of: Jim Fast.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Phase 1 FPIX cooling tubes routing in HC Kirk Arndt - Purdue124 April 2012.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
FVTX substrate FEA1 FVTX Substrate FEA C. M. Lei March 02, 2006.
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
K. Arndt - PurdueTracker Upgrade Workshop - June 3, Phase 1 FPix Mechanics Plans for module assembly Phase 1 design objectives: 1.Reduce # of module.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
1 2S Module meeting, 24 September 2012 S tudies on module support inserts Refers to work by Riikka Häsä, Helsinki Institute of Physics, summer student.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
An Overview of the FPIX Detector Upgrade – CMS Experiment
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
FVTX substrate FEA1 FVTX Substrate FEA C. M. Lei March 02, 2006.
FPIX Upgrade – Status of CO 2 Cooling Studies S.Grünendahl, FNAL for the FPIX Upgrade Mechanical Group H. Cheung, G. Derylo, S.G., S. Kwan, C.M. Lei, E.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
Thermal Analysis of Outer Tracker Modules and Rod Susanne Kyre UCSB 2/8/20101Susanne Kyre UCSB.
FPIX Mechanical Design & Module Development
For the CMS Pixel detector
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Micro-channel Cooling
For the CMS Pixel detector
BPIX/FPIX System and Services Planning
Antti Onnela CERN – EP – Detector Technologies group
Phase 2 Outer Tracker Module analysis
2S module geometry updates Module positioning concepts
Ideas and Plans on Tracker Module Mechanics Developments
WG4 – Progress report R. Santoro and A. Tauro.
Progress in the development of the CO2 cooling system
Status Report on Fermilab CO2 cooling activities
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
For the CMS Pixel detector
Presentation transcript:

Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger. S. Koenig / PSI Update on the Phase 1 FPIX Half Disk Design, S. Kwan / FNAL Phase 1 FPIX Mechanics - Plans for module assembly, K. Arndt / Purdue Phase 2 Outer Tracker Module analysis, S. Kyre / UCSB TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela

BPIX module design Reduction / optimisation of components from present version TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela

BPIX prototypes and test structures Barrel model structure in carbon-fibre Module support with clamps Thermal tests due to start in PSI, Lyon, CERN TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela

FPIX PresentPlanned Phase 1 TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela MODULE LAYOUT  12 identical half-disks  only 2x8 modules  One 2x8 module placed on each side of a substrate for all outer and inner radius blades  Substrate uses Thermal Pyrolytic Graphite – material with excellent in-plane thermal conductivity Inner half-disk Outer half-disk Simon Kwan, Fermilab on behalf of the USCMS Pixel Mechanics R&D group

FPIX Outer (inner) half-disk assembly with Edge Cooling Concept TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela Simon Kwan, Fermilab on behalf of the USCMS Pixel Mechanics R&D group 0.7 mm thick carbon fiber ring for support uses only 3.0 mm thick CC ring for cooling and support uses Cf skin to enclose the tubing Ss tubing Machined groove to house tubing One piece ring made of CC

FPIX Half-disk assembly with Edge Cooling Concept TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela Simon Kwan, Fermilab on behalf of the USCMS Pixel Mechanics R&D group Cf supporting spokes Configuration (1) Heat sink on outer edge only HDI being the outermost within module 0.06 cf TPG cf Blade 150% heat load, 7.3W per blade; sensor: 0.6 W; ROC: 6.7 W ∆T = 5.2C across model ∆T = 3.4C Across sensor

FPIX Module development – Various Integrated Module/Panel Concepts under study, here one example Equipment for automated module assembly under development TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela Kirk Arndt, Purdue on behalf of the USCMS Pixel Mechanics R&D group 2x8 BBM TBM TPG HDI 2x8 BBM TPG HDI pigtail

FPIX Module development - Adhesives study TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela Kirk Arndt, Purdue on behalf of the USCMS Pixel Mechanics R&D group Requirements for adhesive: – Thermal conductivity: > 0.2 W/m-K – Soft: shear modulus < 50 N/mm^2 – Conformable to 50 micron non-flatness – Radiation hard – Electrically non-conductive – Curing at room temperature – Not flowing during application: adhesive confined within chip – Good wetting properties – Not creeping after curing – Allow integrated module replacement without damaging the support Status – Begun a market survey of adhesives for pixel integrated module assembly with potential to meet requirements for SLHC (including adhesives used in current LHC detectors – ALICE, ATLAS, CMS, LHCb and TOTEM) – 6 primary candidate adhesives selected for further testing so far – Building mechanical grade samples using candidate adhesives for evaluation of mechanical properties before and after irradiation FPIX adhesive sample for tensile testing after irradiation

Phase 1 FPIX Time-scale and milestones Module and disk conceptual design and studies are ongoing  baseline conceptual mechanical and electrical design this summer. Small prototype development for testing will follow. Goal to build full-scale prototypes for thermal and mechanical tests in early Time scale for Phase 1 TDR (Spring 2010) TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela USCMS Pixel Mechanics R&D group

Phase 2 Outer Modules First thermal analysis based on module design shown in April 09 tracker week TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela This is the start, and too early to refer to the first results. Need to work on module and support geometry, materials, power of components, cooling contacts, etc. Bonding tests (inclined and long bonds) planned at UCSB Susanne Kyre, UCSB

Summary Design of Phase 1 BPIX and FPIX modules and structures advancing well. – Important gains (~ factor 2) in material budget seem achievable BPIX design: basic concept same as in present detector, but important changes in support design, cooling pipe. – Prototyping of BPIX structures on-going, thermal tests about to start – Cooling pipe to structure gluing requires verification (common topic within the Tracker) FPIX design: important changes in the mechanics concept: outer/inner disk, edge cooled modules. – Many details to be worked out, and prototyped, but seems in good track. – Performance of the edge cooling to be tested. Module – coolant deltaT’s likely to be different in BPIX and FPIX due differences in cooling pipe position vs. modules – Is this a problem? Work on the Phase 2 outer module mechanical/thermal engineering started TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela

On the Tracker-wide Mechanical/Thermal Engineering 1.Need to ensure coherent references on requirements (thermal, precision/accuracy), choice of materials (glues, cooling pipes, …), quality control, etc. 2.A lot of experience and know-how within the collaboration (and within other similar projects) – enhance communication and organization of documentation – Common entry web page(s) pointing to group pages. lists. 1 &2 to be tackled by the Tracker Upgrade Engineering coordinators: A. Onnela, H. Postema, K. Arndt, R. Schmitt, S. Koenig Tracker-wide Mechanical/Thermal Engineering meetings to be held every two months – Within ‘Tracker monthly’ or other suitable – We too need afternoon slots! Tracker Upgrade Project Office (D. Abbaneo, S. Kwan) meets weekly/bi- weekly, and calls sessions on specific topics, including engineering. TK Upgrade Workshop June 09, Summary on Engineering / A.Onnela