1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.

Slides:



Advertisements
Similar presentations
Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
NCSX Mod Coil C1 features requiring rework at PPPL.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
The Effect of T-Stiffener Web and Flange Tilt on Frame Stress Evaluated using Finite Element Analysis by Dean Pasquerella MASTER OF ENGINEERING Major Subject:
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
WBS3 Diagnostics Planning Update Presented by B. Stratton with input from T. Brown, M. Cole, E. Fredrickson, R. Feder, P. Goranson, L. Guttadora, D. Johnson,
Design the Moving and Handling Fixture for the DECAM Imager Edward Chi Fermilab November 17, 2008.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
August 8, 2007 Flange Options for the Antineutrino Detectors Kirk McDonald Princeton University (August 8, 2007)
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
NCSX Modular Coil Turning Fixture FDR. FDR Charge (answers were added below after the review) Modular Coil Turning Fixture FDR - Charge to Reviewers –The.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Process Planning and Computer Aided Process Planning
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX VACUUM VESSEL PL Goranson Comprehensive Final Design Review May 05, 2005 Vacuum Vessel Supports Heating/Cooling System NCSX.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
1 MC Assembly over the VV FPA Station 3 FDR Review July 17, 2007 T. Brown.
Vacuum Vessel lateral loading (Neutral beam port only)
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 Job 1260 Neutral Beam Transition Duct (NBTD) P. L. Goranson.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
Mount structure concept FM1 & FM2 Mount structure design 1) Aluminum structure. 2) Structure design for holding Newport mirror mount because of its compact.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
Update: TF Outer Ring and Clevis Design TF Outer Ring – Implemented recommendations from P. Rogoff. Modified Bolted Joint. Modified weldment to reduce.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
1 Modular Coil Assembly Fixture (MCAF) Information Meeting February 23, 2005.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 FPA Stage 2 MC Flange Assembly Issues and Design Proposals June 20, 2006 T. Brown.
1 CD-2 ECP Preparations What is Needed. 2 Background As part of the CD-2 process, we need to establish a fully supported and documented cost and schedule.
1 NCSX VV Assembly Joint Issue B. Nelson 17 Mar 2005.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
MICE Partial Return Yoke Mechanical Design
Far Detector Activities Late 2017 – Early 2018
MICE Coupling Coil Update
US-HiLumi – Shipping Post Assembly Status
SNS PPU Cryomodule Space Frame
SC1R Cold Box PDR Assembly Sequence
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown

2 Component Installation Fixture Design Requirements The installation fixture shall provide a cost-effective (economical) system to install the magnetic loops, VV heating tubes and I&C components while meeting individual installation requirements.  heating tubes are not expected to impose any specific requirements on their vessel installation fixture other then requiring accessibility to comfortably assemble and attach the tubes.  The magnetic loops need to be installed and their final position accurately measured. The vessel surface deflection should be far smaller than other sources of deflection.  The Rogowski coil that initially was to be installed on the VV has been moved to the MC shell.

3 Diagnostic Loop Arrangement ~ 70 loops will be placed on each vessel field period Location marks to place the loops “may be” done by MTM otherwise we will need to use the Roamer Arm or Leica to provide the locating marks.

4 Heating Tube Arrangement 64 tubes with 600 studs at ~8” spacing will be placed on each vessel field period

5 Component Weights (lbs)  Vacuum Vessel – 3,629  Heating tubes – 1,000  Magnetic loops – 100  I & C – 25 4,754 lbs

6 13 ½ ‘ 10 ½ ‘ Basic Dimensions Shell Fabrication profile tolerance is 3/8” and ports are welded on after loops are installed.

7 Vertical port trunnion support arrangement

8 Vertical Position NB Flange Position Parting Flange Position Alternate Support Arrangements

9 Vacuum Vessel Shell Deflection Support Arrangement Shell Deflection Range (in) Relative Displacement Trunnion Support Vertical Support NB end Support Parting Plane Support

10 Vacuum Vessel displacement contours for atmospheric + gravity loads

11 Supporting the vacuum vessel using a vertical port trunnion support scheme is the most cost-effective approach that allows comfortable access to the vessel surface. For this arrangement the vessel surface deflection should be far smaller than other sources of deflection. Therefore, my recommended is that the trunnion support system be adopted. Selected Design Approach

12 Hoist ring attachment at each end for crane access. Simple support stands are bolted to the floor. The VV is supported off existing vertical port blank-off flanges with a bolt on end tube. Hold down plat used to fix the VV position

13

14

15 The vessel support stand is expected to be fabricated in house. The bill of material is listed on the dawning.

16 max_disp_mag: e-05 max_disp_x: e-06 max_disp_y: e-05 max_disp_z: e-06 max_prin_mag: e+04 max_rot_mag: e-06 max_rot_x: e-06 max_rot_y: e-06 max_rot_z: e-07 max_stress_prin: e+03 max_stress_vm: e+04 max_stress_xx: e+04 max_stress_xy: e+03 max_stress_xz: e+03 max_stress_yy: e+04 max_stress_yz: e+03 max_stress_zz: e+04 min_stress_prin: e+04 strain_energy: e-01 Support Stand Analysis ASTM A36 Carbon Steel Fty = 36 ksi Ftu = 58 ksi

17

18

19

20 Description Unit Weig ht (lbs) $ per Lb Unit Cost ($) Qnt y Total Cost ($)Comments Equiv $75//hr Support stand structure3127 2,1842 4, Clamp down bracket Modified VV blank-off cover2 600 Drill and tap about 5 holes.8.0 Blank-off cover tube attachment Machine hoist ring McMaster-Carr Misc Hardware 300 Contingency 1, , wks Fabrication cost Estimate

21 Charge: 1. Are the requirements well defined? 2. Does the design adequately address the requirements? 3. Does the analysis adequately underpin the design? 4. Do the drawings define the design adequately to be used as the sole basis for fabrication and acceptance of the support fixture? 5. Has safety been adequately addressed in the design of the support fixture? 6. Can the support fixture be fabricated and installed within the budget and schedule identified in the project baseline? 7. What additional work or documentation should be done in order to complete the final design?