Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund 05.03.03.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
The ATLAS Pixel Detector
Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
The ATLAS Pixel Detector - Introduction -
0ATLAS Pixel Mechanics meeting at LBNL 13 April 2000 P.Netchaeva, INFN/Genoa Study of bump stresses The aim of this study is to check the effect of stresses.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
1 Module and stave interconnect Rev. sept. 29/08.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
The following schematic displays the general setup of the Dunk Probe test. The Aluminum sample tested during this run (DSAT3) had a thickness of 200nm.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Mass production testing of the front-end ASICs for the ALICE SDD system L. Toscano a, R. Arteche Diaz b,d, S. Di Liberto b, M.I. Martínez a,c, S.Martoiu.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
1 Module and stave interconnect Rev. sept. 29/08.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
ALICE Silicon Strip Detector Module Assembly with Single-Point TAB Interconnections 1) Introduction 2) Collaboration 3) ALICE SSD module 4) Assembly phases.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of the Beetle Readout for the MaPMTs  history of events  documentation of setup  prospects of near future RICH meeting, CERN, Stephan.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Thanushan Kugathasan, CERN Plans on ALPIDE development 02/12/2014, CERN.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Kevin Nash MaPSA-Light test system 1. The System 2.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Chip design and mass test system development Y. Kwon (Yonsei Univ.)
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003.
Anna Maria Fiorello - Research Dept ATLAS-Pixel Project: Bump Bonding ATLAS BUMP BONDING PROCESS.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
The STS-module-assembly:
Berkeley status Aug 10th, 2012.
Study of Indium bumps for the ATLAS pixel detector
The workflow of module assembly for the CBM Silicon Tracking System
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Gluing jigs for Demonstrator
Equipment for Assembly – UK Experiences
Flex wire bonding with pattern recognition between each wire
ACOE347 – Data Acquisition and Automation Systems
Presentation transcript:

Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund – E4 ATLAS-/Si-Meeting

Module mounting structure bare module probing ● FE probing - 2 h ● sensor probing - 10 min flex hybrid - tested at Oklahoma test MCC ? - few min or tested at DELTA assembled module test - 3 h glue pigtail to flex hybrid 30 min + 1 h bond pigtail - 30 min glue MCC to flex hybrid 15 min + 1 night bond MCC - 1 h test flex hybrid with MCC - ?? glue flex to bare module 45 min + 1 night bond FEs to flex at Bonn 2 h

Flex hybrid - tests at Oklahoma ● bare flex hybrids tested for shorts and opens in industry (fast test - up to 5% error) ● attach bare flex hybrid to frame ● load passive components on flex hybrid ● visual inspection (misalignment, substrate defects, solder on pads) ● measurement of substrate, cover layer and metal thickness; trace and pad width ● wirebond and encapsulate test connections (until now rebonded at Bonn) ● test high voltage (800 V) isolation ● envelope inspection (maybe after MCC is bonded and potted) Glue pigtail to flex hybrid equipment ● 10 sets of pigtail tools (doesn't exist - construction drawings ready) ● solid adhesive film (Pyralux) (doesn't exist) ● stereo microscope (exists - maybe new or additional light source needed) ● heater (exists - Heraeus) ● glue and vacuum apparatus with accessories (exists - Paggen LABSET M- Dispenser & M- VAC-PIN)

Bond pigtail to flex hybrid equipment ● manual bonder (exists - bond tests on flex holder card successful) ● 50  m pure Al wires (single wires between signal pads and three wires with different length between power pads = 23 bonds) ● 17,5  m AlSi wires (three wires with different length between HV pads = 6 bonds) MCC test equipment ? ● standard pixel testsystem (exists) ● MCC test card (doesn't exist - exists at Bonn) ● low voltage source (3.5V) (exists - ?) ● we do not have any experience

Bond MCC to flex hybrid equipment ● manual bonder (exists - no tests with MCC made) ● 25  m AlSi wires (69 bonds)  MCC wirebonds encapsulation ? Glue MCC to flex hybrid equipment ● 10 sets of module mounting tools (doesn't exist - construction drawings ready) ● stereo microscope (exists - maybe new or additional light source needed) ● Dow Corning SE4445 silicon or Epotek 70 glue ● glue rotator (doesn't exist - easy to build) ● glue and vacuum apparatus with accessories (exists - Paggen LABSET M- Dispenser & M- VAC-PIN)

Flex hybrid with MCC test equipment ● visual inspection (before encapsulation) ? ● envelope inspection ? ● detached wire bonds, broken lines ● MCC power consumption with and without clock ● R/O of FIFOs and registers, parametric measurements on the I/Os ● contact each group of FE pads and additional parametric measurements ● event building with simulated events Flex hybrid with MCC tests ● TFM (Test Flex Module) board (doesn't exist - ask ?) ● power supply (exists - ?) ● programmable scanner and digital multi meter (exists - ?)  MCCExe / (Pattern generator (MCC input) & logic state analyser (MCC output) (doesn't exist - ask ?)  MCC probe card with 60 needles (doesn't exist - ask ?)  we do not have any experience

Flex hybrid with MCC tests TFM board MCC on flex probe card

Bare module probing equipment ● probe station with >6'' chuck (exists - ?) ● needle card with 48 contact points (doesn't exist - ask Theo) ● needles for two contact points (exists - ?) ● handling- and test-tool for bare modules (doesn't exist - ask Attilio) ● double low voltage source (2.0V & 1.6V) (exists - Agilent E3631A) * ● double low voltage source (+5V & -5V) (exists - self-construction) * ● multimeter (exists - HP 390A) * ● picoampermeter (exists - ?) * ● VME-crate (exists) with: * ● VME-MXI interface (exists - NI VME-MXI-2) * ● TurboPLL (exists - new PROMs needed) * ● TurboPCC (exists - new PROMs needed) * ● SCSC? or something equivalent (exist - doesn't work, ask Atillio) * ● oszilloscope & 2 differential probes- (exists - Tektronix TDS 640A, P6248 & P6246) * ● standard PC with MXI-interface (exists - e4pc06 maybe more memory needed) * ● TurboDAQ (exists - Version 3.4) * ● pulser (exists - Agilent 81110A) * * = standard pixel testsystem

Bare module probing tests visual inspection? FE probing (subset of standard test routines ATL-IP-QC-xxxx): ● global- & pixel register functionality ● column pairs affected by pixel defects ● pixels not answering to digital injection ● pixels with low noise (without HV to sensor) ● analogue and digital current consumption at power up, after global registry test, after digital injection scan & after noise scan ● MonLeak ? ● CrossTalk ? sensor probing: ● standard I-V measurement (ATL-IP-QP-0006)

Glue bare module to flex hybrid equip. ● 10 sets of module mounting tools (doesn't exist - construction drawings ready) ● stereo microscope (exists - maybe new or additional light source needed) ● Dow Corning SE4445 silicon and Dow Corning 3140/3145 ● glue rotator (doesn't exist - easy to build) ● glue and vacuum apparatus with accessories (exists - Paggen LABSET M- Dispenser & M- VAC-PIN) ● 3 different glue methods used (discussion last pixel week - wait for decision) ● heater (exists - Heraeus) Bond FEs to flex hybrid at Bonn ● automatic bonder at Bonn ● trip to Bonn when all module mounting tools are filled or we need a extra chuck at Bonn and some flex holder protection tools

Assembled module test equipment ● standard pixel testsystem (exists) ● 4? 241 Am sources (doesn't exist) ● flex frame support card (doesn't exist) / type0 microcable (doesn't exist) & module support card (doesn't exist) ● module cooling (doesn't exist)? Assembled module tests ● analogue and digital current consumption ● global and pixel register functionality ● digital performance of each pixel ● threshold dispersion of the whole module ● noise of the whole module ● tuning ● burn-in (maybe only on the bi-staves)

Summary bare module probing ● FE probing - 2 h ● sensor probing - 10 min flex hybrid - tested at Oklahoma test MCC ? - few min or tested at DELTA assembled module test - 3 h glue pigtail to flex hybrid 30 min + 1 h bond pigtail - 30 min glue MCC to flex hybrid 15 min + 1 night bond MCC - 1 h test flex hybrid with MCC - ?? glue flex to bare module 45 min + 1 night bond FEs to flex at Bonn 2 h