110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.

Slides:



Advertisements
Similar presentations
Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Advertisements

M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Pierre Bonneau EN/CV/DC
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
M. Battistin – 9 th June 2010EN/CV/DC M. Battistin (EN/CV/DC) 9 th June 2010 Detector Cooling Project - WP III Advancement Status.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Cooling System Solutions
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
60kW Thermosiphon control system
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
Michele Battistin Elena Perez Rodriguez 10 November 2010
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Update on the PSB Cooling and Ventilation Systems
He Plant, LN2 Systems and Commissioing
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
ATLAS Thermosiphon Readiness Review 17th March 2016
SPS cryogenic proximity equipment and SM18 validation
M. Battistin CERN EN/CV/DC 9th July 2009
Cooling systems for HL-LHC (WP17.3)
ATLAS Thermosiphon Electrical Distribution and Run Modes
Insertable B Layer Cooling System
EN-CV: P8 systems and Detector Cooling
Low temperature chiller Market Survey
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011

210 th November 2010EN/CV/DC Index Introduction Basic design Chiller Condenser Piping installation and integration Risk Assessment and definition Other tasks: control, infrastructures Planning Conclusion

310 th November 2010EN/CV/DC Introduction The Thermosiphon project started in March 2009 Objective: consolidate the ATLAS ID evaporative station Milestones achieved Mini-Thermosiphon Preliminary study and tests 2kW Thermosiphon Design Purchase Control Construction * Perform tests Full Scale Thermosiphon Basic design and technical note Integration Cost estimation Planning and organization of piping work Chiller purchase process Pipes calculation and integration Condenser purchase process Detailed design and selection of components

410 th November 2010EN/CV/DC Basic design The Thermosyphon is the baseline solution for the consolidation of the ATLAS ID evaporative cooling system. The main design parameters are: – Detector cooling Power: °C. – Pressure and temperature at the rack: 500 mbar, 20 C. – Flow at full power: 1.2 kg/s. The present compressor system will remain as full power back up cooling source.

510 th November 2010EN/CV/DC Thermodynamic Cycle: P-h diagram

610 th November 2010EN/CV/DC Full Scale Thermosiphon P&ID Brine Circuit Chillers Thermosyphon Circuit

710 th November 2010EN/CV/DC TS Brine Low T Chiller 7 The fridge cascade Primary Water 25°C Cooling source is the primary water coming form the cooling towers: ≈25 °C Two fridge systems in cascade take the temperature to -70 °C. The first stage uses R404a and the second stage R23. The second stage cools down a C 6 F 14 liquid brine circuit used to condensate the C 3 F 8 in the condenser of the thermo siphon circuit. First Chiller (R404a) Second Chiller (R23) -30°C-70°C -67°C Condenser Liquid receiver Brine (C 6 F 14 )

810 th November 2010EN/CV/DC Chiller Purchase Requested configurations: – Option 1: Three 50% duty chillers (one air cooled). – Option 2: One 100% duty Chiller (with redundancy on the compressors) plus 2 chillers at 50% duty (one air cooled). Result from the Invitation to Tender: – Best offer from J&E Hall (on both configurations). – New configuration proposed (by CERN and J&E Hall): 2x Chillers 100% duty for same price of 3x 50% duty. Purchase procedure definition: – Purchase of one 100% duty Chiller now and the redundant unit later.

910 th November 2010EN/CV/DC Redundancy and emergency strategy C3F8 condenser 180 kW -70 °C liquid tank USA15 cavern Surface C6F14 brine circuit Primary water 25°C First 100% power Chiller First cycle for Emergency diesel powered Second 100% power Chiller First cycle for Emergency Diesel powered Air cooled ATLAS ID Detector UX15 cavern Back-up 50 kW -20 °C Brine circuit Redundant pumps

1010 th November 2010EN/CV/DC Chiller Characteristics J&E Hall Chiller characteristics: – Design duty: -70°C. 2-stages: R404a (high temperature) and R23 (low temperature). – Stage 1 (R404a): °C (COP=2.08); Equipped with an air cooled condenser sized for warm operation (60 kW of cooling power). – Stage 2 (R23): °C (COP=1.29). Overall COP = 0.66 – Requirement of electrical power: = 293 kW. – Required water from cooling towers: 84,000 kg/h. – Location requirements: Size: 11x2.75x3m (length, width, and height). Weight: < 15,000 kg.

1110 th November 2010EN/CV/DC Chiller Integration The planned position for chillers and brine pumps circuit has to be redefined due to future upgrades of the cooling towers. New position to be defined.

1210 th November 2010EN/CV/DC Condenser Purchase & Integration The DO has been sent: waiting for offers. The condenser will be placed on the roof of building XXX. – The triangular support structure is being designed by EN/MME.

1310 th November 2010EN/CV/DC Pipes & Supports Integration Layout of pipes and supports by A. Bitadze (3DModel Number : ST _01). Calculations for the defined pipe routing and its supports with seismic analyses by EN/MME. Calculations to be sent to PROGEPI (Iniziative Industriali) for verifications and design of supports. Pipes have been bought, cleaned, and are ready to install.

1410 th November 2010EN/CV/DC Risk Assessment and definition The first version Risk Assessment and Definition was done by L. Zwalinski. The document is being reviewed and updated (dependent on the selected components and final version of the P&ID).

1510 th November 2010EN/CV/DC ATLAS reviewing process Pre-design and general lines of the project. Indico agenda and documents here.here 1 st Thermosiphon review: 6 th July 2009 Detailed design for the 2 kW Thermosiphon, mini-thermosiphon and blends. Indico agenda and documents here.here 2 nd Thermosiphon review: 1 st October 2009 Advancement status of Thermosiphon project, oil free centrifugal compressors and sonar sensor. Indico agenda and documents here.here 3 rd Thermosiphon review: 28 th May 2010 Project Readiness Review. Indico agenda and documents here.here 4 th Thermosiphon review: 19 th of November 2010

1610 th November 2010EN/CV/DC Other tasks (in parallel) Control – UNICOS for the Thermosiphon and Chiller. – Draft for the functional analysis in progress. Infrastructure – Search for primary water for the chiller system (dependent on the chiller integration). – Upgrade of the electrical network for standard and diesel power supply (possible to connect to an existing EN/CV rack).

1710 th November 2010EN/CV/DC Planning Time Autumn 2010Winter 2010/2011Spring 2011Summer 2011Autumn 2011Winter 2011/2012 Design and integration Complete basic design and integration Chiller system and brine circuit Invitation to tender process Award the contract Manufacture Supply and installation Tank/condenser Detailed design Demmande d’offre + purchase Manufacture Supply and installation C3F8 piping Supports and earthquake calculus Purchase of material Installation of the pipes By-pass Detailed designPurchase of materialInstallation in the cavern Instrumentation and control Functional analysis Purchase of hardware Programming Electricity and Pneumatic installations Study the requirements Improve UPS/Standard supply if needed Commissioning Tests with by- pass

1810 th November 2010EN/CV/DC Conclusions The Mini-Thermosiphon has proved the working principle for the consolidation. The 2 kW Thermosiphon has been stopped by certification problems of the tank. It shall provide results to design the control of the final project. The Full Scale Thermosiphon is already well advanced – Basic design is done. – Purchase has started: Chiller was ordered. – DO for the condenser is launched (opening proposals the end of May). – Piping installation has been organized. – Component selection is ongoing.

1910 th November 2010EN/CV/DC Thank you for your attention Any questions ? Any questions ?