HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.

Slides:



Advertisements
Similar presentations
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Advertisements

13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
HIRADMAT IN THE WANF TUNNEL I. E FTHYMIOPOULOS, EN/MEF  HIRADMAT-Exp.Area Working Group  EN/MEF : I. Efthymiopoulos, A. Pardons, M.Lazzaroni, N. Gilbert.
Injection test? Mike Lamont For initial discussion.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
Construction and Installation of the CLIC Experimental Area
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Stripping Foil Test Stand in the Linac4 Transfer Line
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I.
Extraction and beamline progress B.Goddard TE/ABT.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
The integration of 420 m detectors into the LHC
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD2 ColMat HDED.
Status of n_TOF Facility
HIGH RADIATION TO MATERIALS Ans Pardons for the HiRadMat project team IEFC Workshop, March 22, 2011 Outline  The HiRadMat facility – Why, What, When,
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Advanced European.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
The Next Generation of a Gamma Irradiation Facility GIF++
Adrian Fabich HiRadMat Technical Board CERN, 15th Sep 2016
HiRadmat requests A. Fabich MSWG, 30. January 2015.
ELENA installation and commissioning status
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
SPS CC: Final plan for interlocking of crab cavities in SPS
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Overview Some useful presentations: Public overview – coffee meeting
YETS PS + PS SWY + TT2 Facility Coordinator:
Distributed Optical Fibre Radiation and Temperature Sensing at High Energy Accelerators and Experiments Update on installation of DOFRS in PS-Booster.
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
HiRadMat Test Facility
Present and Future test facilities for High-intensity Targetry CERN
A. Fabich EuCARD-2 annual meeting 2017, Glasgow
SPS Injection BIS - Draft requirements
Presentation transcript:

HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement

Modifications YETS15/16 Zone layout for IMPACT – Introducing a virtual zone in TT61 – Allows TT61 to be included both in SPS and HRM facility Shafts V0-V7 in SPS interlock chain 4 – Muon pits of former WANF facility – Manual veto (as in the North Area) handled by EN/EA CV intervention on – 2 days, dates to be confirmed – Access to TJ7 in week 10, partially with oxygen/CO2 meter (to be provided by BE-ICS) FE rack for BPMs moved from TJ7 to TA7 – Avoid impact by beam radiation – ECR SPS-BYBPM-EC-0002 RadMon detectors installed in TT66 and TT61 Extending the surface preparation area – Space for preparing experimental setup with mock-up tunnel configuration SectSC preparations using table/support LPROT Additions to TT61 shielding and TJ7 bunker shielding 4/3/2016A. Fabich2

TT61 shielding - modifications 4/3/2016A. Fabich3 NEW concrete

TJ7 bunker - modifications 4/3/2016A. Fabich4 8x 1688 concrete

Beam slot assignments 4/3/2016A. Fabich5 HRM access “easily possible” TCDI, BLM2 MicOpt RotColl beam Cry2 beamdBM beam SextSC beam BTV2 beam Backup (SCI?) backup ?

HiRadMat tests in 2016 HRMT28-TCDI – collimator test (Graphite and C-C) – Approved – Almost ready for beam HRMT20-MicOpt – Optical microphone as BLM – Approved, follow-up from 2015 – Parallel mode with TDCI – Ready for beam HRMT19-BLM2 – Testing new BLM developments – Approved – Beam time with TDCI – Ready for beam HRMT21-RotColl – Rotating collimator developed at SLAC – Previously tested in SPS ring – Approved – In preparation HRMTxx-BTV – Testing BTV materials – To be approved – Follow-up from 2015 – Setup available for minor modifications HRMTxx-SextSC – Original proposal of testing cold coils approved – In 2016 a pre-test of at ambient temperature is envisaged – to be approved – Preparing … HRMT17-dBM – Diamond detectors – Approved – First HiRadMat tests with ions operational beams only Scintillating SCI screen tests – Latest proposal by ESS/Oslo – Preliminary discussions in the recent days – To be approved – In July? 4/3/2016A. Fabich6 Detailed experiment descriptions available on

Beam pulse lists 4/3/2016A. Fabich requests communicated to BE/OP, MSWG Ion beam time with operational available beams only Expected: Similar accumulated beam time as in 2015

Proposals Improve remote handling/automatic plug-in system for signal cabling – 2015 collective dose for all BA7 access: 0.6 man-mSv Extend the facility for cryogenic tests – e.g. structural damage of SC magnets and systematic quench tests during beam impact – To be studied: LHe supply/recuperation, safety impact … HiRadMat users day – Within framework of the HRM Scientific Board – Inviting former experiments Presenting scientific results and dissemination – Initiate discussing HiRadMat facility improvements/extensions 4/3/2016A. Fabich8

Access to V0-V6 Muon pits of former WANF Exposed to muon beam in forward direction of HiRadMat target area Access to be restricted upon RP request Access to VO needed about twice a year for intervention by CV Skipping installation of full-fletched access control system (SPS) Padlocks with manual veto system like in the North Area – Agreed by EN, BE and RP (EDMS ) – Installed by BE/ICS – Manual veto held by EN/EA Installation completed, operational from /3/2016A. Fabich9 ISR HiRadMat V0 V6 BA7