Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,

Slides:



Advertisements
Similar presentations
RF-Gun cavity for high charge electron generation Takuya Natsui.
Advertisements

First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
CALCULATIONS OF THE LCLS INJECTOR USING ASTRA Jean-Paul Carneiro DESY Hamburg ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
S. Manz 1*, A. Casandruc 1, D. Zhang 1, J. Hirscht 1, S. Bayesteh 3, S. Keskin 1, J. Nicholls 4, T. Gehrke 3, F. Mayet 3, M. Hachmann 3, M. Felber 2, S.
Photocathode 1.5 (1, 3.5) cell superconducting RF gun with electric and magnetic RF focusing Transversal normalized rms emittance (no thermal emittance)
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
I.V. Bazarov, Multivariate Optimization of High Brightness DC Gun Photoinjector, UCLA Workshop, 8-10 November CHESS / LEPP ERL DC Gun Injector.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
FLASH. Free-Electron Laser in Hamburg Long Trains, High Beam Loading Possibilities for high-current long bunch train running at FLASH Siegfried Schreiber.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
CLIC RF manipulation for positron at CLIC Scenarios studies on hybrid source Freddy Poirier 12/08/2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
TTC Meeting Frascati Dec 5-7 Bernd Petersen WG3: Module Test-Stand Summary Charge of the working group: Define scope of module test-stand activities with.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
–10.06 Milan Italy LUCX system and dark current (1) LUCX project (2) Phase Ⅰ and results (3) Phase Ⅱ and dark current Liu shengguang and LUCX.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Simulations of ILC electron gun and bunching system Diagram of bunching system (from TESLA paper by Curtoni and Jablonka) -Electron gun generates electrons.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Laser-Undulator Compact X-ray source (LUCX) POSIPOL2006 Workshop at CERN 1/23 Experimental Plan of X-ray Generation using Optical Resonator using Optical.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Laser electron beam x 30 Multi-Compton chamber system γ-ray cm Conceptual design in 2005 Snowmass X 5 at present Good progress During R&D From Conventional.
An Electron source for PERLE
S.M. Polozov & Ko., NRNU MEPhI
Phil Oxford , june 18 Photoinjector at.
Polarized e- Source Design and R&D 10/24/05
Status of the CLIC main beam injectors
Polarized Electron Source for eRHIC (the ring-ring option)
MIT Compact X-ray Source
The Cornell High Brightness Injector
LCLS Commissioning Parameters
LCLS Commissioning Parameters
Electron Source Configuration
ELIC Injector Working Group High-P, high-I source issues (DC)
Injector: What is needed to improve the beam quality?
Studies of Emittance & Lifetime
LCLS Commissioning Parameters
LCLS Commissioning Parameters
DC Photocathode Gun (JLAB)
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Injector for the Electron Cooler
SuperKEKB required (e+ / e-)
Presentation transcript:

Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration, no buncher, but high density beam -> big space charge, bad transmission. 2nd step : RF-gun + photo-cathode (2007) similar to TTF, but heavy-load of laser development* RF-gun: easy extension of S-band RF-gun of ATF. *Laser development will be done continuously from step 1 to step 2. ** Why two step?: limited budget and man power, however need some beam to confirm cavity gradient in initial stage.

Reason of Beam at STF To develop following performance & technologies; 1. Cavity gradient, 2. LLRF control for beam loaded cavities, 3. HOM studies for TESLA type and LL type, 4. Instrumentation (BPM, BSM) development, 5. Laser development for ILC beam generation, later, want to expand them to ILC Pol e- generation study*. (* Pol e- : by Nagoya-univ. and KEK collaboration)

Acceleration field on axis for simulation Cs-Te photo-cathode solenoid Plan of DC-gun Existing photo-cathode DC gun (Step 1)

Full ILC Charge 3.2nC 10ps bunch length 200keV energy ~50% transmission Beam transmission simulation

1/10 Charge 0.32nC 10ps bunch length 200keV energy ~80% transmission

1/100 Charge 0.032nC 10ps bunch length 200keV energy 100% transmission

Required Laser System 10mA average current within a macro-pulse require 4.2W average laser power with the following conditions; –CsTe photo-cathode –266nm laser energy –1% QE

Laser System (2) Mode-lock oscillator can make a laser pulse train with several 100 MHz frequency. Fundamental wave length is not in UV. Need FHG for Nd:YLF and THG for Ti:Sa. HG crystal however can not be operated in such high average laser power. Start with lower average power (~100mW), upgrade to the higher power. (OPCPA?)

Conclusion of simulation and available laser, 1/100 charge : 100% transmission in case of reduced field of #1cavity (~40% of 35MV/m) to increase beam loading with this small charge, need 100 times narrower bunch spacing and 100 times bigger number of bunch. However initial Laser system power will be ~2% of full specification, Beam loading experiment will be the next priority study. * Also need special treatment of reduced field for the first cavity.