K-3 Modular Classrooms Constructed with Cross Laminated Timber REQUEST FOR QUALIFICATIONS FOR Design-Build Services Project No. 2016-743 Project No. 2016-754.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

Dr. Ruth Collins TrinityHaus
LO 3: Understand sustainable construction techniques that are fit for purpose An introduction.
Construction in the Future
East Bridgford Project Existing Projects The Green Box Project Adaptation Techniques used within this project:- Natural ventilation is increased by a passive.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Timber Framed Structures
Innovative New Technologies in Building & Construction.
Building Methods Types of Structure.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
INTERIOR WALL FINISHES
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
QuickWalls® strong. fast. simple.
Structural Insulated Panel System Chapter 15. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Topic C1 Superstructures - walls
Where in the World? -Our home is in New Jersey because the State of New Jersey gives generous rebates on top of the rebates granted by the US Government.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Prefabricated Timber Frame Construction
Structural Systems CM 105. Precast Concrete Framing Offer exceptional strength and resistance to seismic stresses and high degree of fire safety Concrete.
Noise analysis- operations 6 ft. panel on west side of guide way 4 ft. panel on east side of guide way.
Constructing Homes and Other Buildings
BUILT TO LAST Assessing the Benefits of Modular Construction for Military Applications.
Building With Superior Walls Introducing The Superior Advantage.
Precedent Analysis arc 572 UT Solar Decathlon 2009 BLOOMhouse University of Texas at Austin I 2007 ARCHITECTURE I INTERIOR I TECHNOLOGY I SOCIETY architecture.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
Btec Construction Unit 5 Methods of construction for domestic buildings.
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Wall and Ceiling Construction
Environmentally Friendly Framing Methods
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Building Plans.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Outreach Meetings 1063 Capitol Way Block Replacement Project September 26, 2013 (Olympia) September 30, 2013 (Seattle)
Competency: Draw exterior elevations
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Unit 6/P6 – Timber Frame Construction Name ________________
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Name ________________ Unit 6/P7 – Environmental Implications (what do developers need to take into account when building) Noise Nearby Residents Hours.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
CONSTRUCTION SYSTEMS. What Is Construction? Our Constructed World shelter travel.
Cross Wall Construction
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Learning Outcome Lesson Objective
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
a new envelope in a prefabricated timber construction
Ryan Thurston | Duncan McLennan
Prefabricated Timber Frame Construction
External Walls Carl James.
Timber Framed Buildings
Common Structural Forms
Building Methods Types of Structure.
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
Wrangle Hill Elementary School New Castle, DE
Competency: Draw exterior elevations
INDOOR BASEBALL / SOFTBALL FACILITY
Offsite Applications for Rail Overbuild Part 1
Minuteman Vocational Technical Regional High School Progress
TCU-PROJECT: 7TH Semester Course
No. 4 Wood Street, Mansfield
All Africa Housing (PTY) LTD
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

K-3 Modular Classrooms Constructed with Cross Laminated Timber REQUEST FOR QUALIFICATIONS FOR Design-Build Services Project No Project No

K-3 Modular Classrooms ( ) Give DES the authorization to expedite the construction of (20) K-3 Classrooms on five different School District sites. With Two Separate Design Build Teams Western Washington Seattle School District Mount Vernon School District Sequim School District Eastern Washington Wapato School District Toppenish School District Four Classrooms to each district State Building Construction Account-State $ $5,500,000. Total funding 2016 Supplemental Budget Section 1022

Kindergarten - 3 rd grade Classrooms Standard Classroom is approx. 900 sq. ft. Restroom included or adjacent to classrooms Survey & Utilities are part of each site project Site specific issues addressed in each location ADA accessible Must use Cross Laminated Timber Modular Classrooms

Why - Cross Laminated Timber ? A cross-laminated timber is a method of construction that uses timber to form load-bearing solid timber wall, floor and roof panels. These are Modular Construction Panels. Structural openings, such as doors and windows, are incorporated within the panels at the manufacturing plant. In many cases only insulation and cladding is added to the external face to achieve high standards of thermal performance. Modular Panels are up to 40’x10’

The key advantages of CLT modular wood construction: Wood stores and sequesters carbon, keeping it out of the atmosphere By replacing structural concrete, masonry or steel with wood we use less fossil fuel to manufacture Wood is a renewable, manageable natural resource CLT has as inherent high standard of airtightness Construction with CLT is quick, efficient and precise Why - Cross Laminated Timber ?

Construction time is very fast - services can be installed and finishes applied whilst panel installation continues. Higher tolerances achievable through prefabrication Relatively light weight of panels allows reduction in the size of foundations & footings Avoidance of noise and dusts associated with traditional construction Why - Cross Laminated Timber ?

Airtightness is easily achievable Thermal bridging is very much reduced or eliminated entirely Prefabrication of panels reduces the quantity of waste associated with onsite fabrication 'Dry' construction prevents moisture from being admitted into the building Exact dimensions can be provided for custom / non- standard window and door openings, openings can be done in the manufacturing plant prior to shipping Requires only limited site skills Why - Cross Laminated Timber ?

Regional suppliers in British Columbia and Oregon, soon to be in Montana. The State of Washington in the future! Cross Laminated Timber

Statements of Qualification 3:00pm June 1, 2016 Three Finalist Selected for each sideJune 1, 2016 Issue Requests for Proposal June 13, 2016 Proprietary Meetings with Finalists West Side June 15, 2016 Proprietary Meetings with Finalists East Side June 16, 2016 Last Request for Information due from Finalists: West Side June16, 2016 Last Request for Information due from Finalists: East Side June17, 2016 Last Addendum Issued West Side June 17 th, 2016 Last Addendum Issued East Side June 20 th, 2016 Proposals Due at 3:00pm West Side June 28 th, 2016 Proposals Due at 3:00pm East Side June 28 th, 2016 Interview with Evaluation Team West Side June 30 th, 2016 Interview with Evaluation Team East Side June 29 th, 2016 Scoring Proposals West SideJune 30, 2016 Scoring Proposals East SideJune 29, 2016 Public Announcement of scores Both Side 10:00am July 1, 2016 DES Initiates Negotiations with Highest Scoring Proposer West Side July 6, 2016 DES Initiates Negotiations with Highest Scoring Proposer East Side July 7, 2016 Contract Award West Side, July 13, 2016 Contract Award West Side, July 14, 2016 Notice to Proceed – To Be Determined Schedule

Questions? Thank you