H-ECCTD - KICK-OFF MEETING 16TH MARCH 2016 GENERAL INTRODUCTION Florence ARDELLIER.

Slides:



Advertisements
Similar presentations
SRF Cryomodules November 2013 Meeting
Advertisements

ESS cavities interfaces
Materials to support the discussion: - Recall of TAC11 (1-2 April 2015) recommendations -HOM and PED -Possible QA applicable to SRF collaboration projects.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
ESS Spoke Cryomodules: QA / QC Plans Workshop on Requirements Conformance for SRF Cryomodules, 15 th -16 th October 2014 Denis Reynet, Veronique Poux Sebastien.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
ESS Medium Beta Cavity Prototypes Manufacturing HALF CELLS RESULTS SUMMARY Six medium beta cavities will be manufactured for the Elliptical Cavities Cryomodule.
Accelerator / Elliptical Cavities Cryomodules
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
ESS Programme Plan and Schedule Update C. Darve, Deputy WP05 and WP04 leader Acknowledgement: N. Elias, WP05 and WP04 P. Bosland, WP05 leader
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
1 P. Bosland - Audit WP5 10 th of December 2015 Lund Annual audit for WP5 Elliptical cryomodules Prototype cryomodule M-ECCTD Prototype cryomodule H-ECCTD.
RISK REGISTER Management & Engineering
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
Christine Darve ESS deputy WP leader Pierre BOSLAND, CEA Saclay External WP5 leader With special Acknowledgment to Nuno Elias (ESS) and Gilles Olivier.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
THE ESS ELLIPTICAL CAVITIES CRYOMODULES STAT US ON THE CEA SACLAY ACTIVITIES P. BOSLAND & F. ARDELLIER TAC13 07 th APRIL 2016.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ESS Program Plan and Schedule Update
WP High Beta Cavities Delivery
Status of the M-ECCTD F. Peauger - P. Bosland
Medium Beta Elliptical Cryomodule CDR Closeout
Cryomodule test stand at ESS site
WP5 Elliptical cavities
ESS cavity procurement via in-kind contributions
CSP 25th November 2010 Technical agreement number 3: overview
Campus Master Plan.
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
SQL Server OLTP with Microsoft Azure Virtual Machines
Jaroslaw Fydrych SHC Lead Engineer
Status of the CNRS Contribution to the ESS Accelerator
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Licensing requirements for Cryomodules
Overall time schedule of SRF activities
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
ESSI CHANGE AND nonconformity control SYSTEM
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
CNRS contribution to ESS – 01/02/17
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Quality assurance and Quality control organisation
How Do We Define Acceptance of a Cryomodule? - A Discussion
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Status & Schedule for ESS TS2
SNS-PPU upgrades the existing accelerator structure
ACCSYS Collaboration Board Triestre, 3rd october 2017
Work Unit AIK 11.2 CDR of the CDS-SL Quality
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

H-ECCTD - KICK-OFF MEETING 16TH MARCH 2016 GENERAL INTRODUCTION Florence ARDELLIER

Florence ARDELLIER – ESSI – 29 janvier 2016 H-ECCTD : a phase of Elliptical Cryomodules development 1.H-ECCTD = Inkind contribution 2.H-ECCTD through CEA - ESSI project 3.Main roles of H-ECCTD 4.Road map

| PAGE 3 CEA Saclay/Irfu projet ESS | DATE H-ECCTD = SCHEDULE # 1.10 Schedule#1.10 is based on Early Inkind Technical Annx # 5 + Change request Kick off Meeting aims : -To agree scope of work and development plan -To obtain the « green light » to start work on scope of work

| PAGE 4 H-ECCTD THROUGH CEA ESSI ORGANISATION – PROJECT MANAGEMENT OFFICE ESS liaison Officer ESS Head of ACCSYS & ICS divisions H-ECCTD H-ECCTD is considered as a sub-system of Cryomodule WP

| PAGE 5 H-ECCTD THROUGH CEA IRFU CRYOMODULE TEAM On Courtesy of IPNO Programmatic Complexity in 2016 : 2 demonstrators development in parallel with the 30 Cryomodules componenrts production launch Programmatic Complexity in 2016 : 2 demonstrators development in parallel with the 30 Cryomodules componenrts production launch

| PAGE 6 MAIN ROLES OF H-ECCTD AND ITS ORGANISATION H-ECCTD roles through the general development plan of High Beta elliptical cryomodules  Validate the High Beta Cavities performances before production phase  Validate the « collective effect » in Cryomodule  Lowering the technological risks : RF power tests Main principles: H-ECCTD is a bilateral agreement between ESS and CEA  Mechanical architecture is identical to M-ECCTD : CEA will benefit from the experience learned from IPNO with Gilles Olivier  Mechanical Detailed Drawings for critical components will be M-ECCTD detailed drawings updated  Coupling with components production has to be discussed

High Beta Cryomodules production -T  T : 21 High  H-ECCTD schedule must not affect the general master planning CDR -for High Beta cavities & CM : oct 2017

Banc de Conditionnement coupleurs 704 MHz Banc de Conditionnement coupleurs 704 MHz M-ECCTD H -ECCTD Cryomodules de Série Médium -  Cryomodules de Série High -  Supply of : Cavities, SAF, shieldings : CEA Equipped vaccum vessel: IPNO Supply of : Cavities, SAF, shieldings : CEA Equipped vaccum vessel: IPNO M-ECCTD assembly CDR -1 Supply of part of H-ECCTD components Assemblage CM AO + Appro + reception des composants des 30 CM de série Preparation of market survey MàJ Assemblage des Cryomodules Marcket survey fof Contrat d’ étude d’industrialisation de l’assemblage des CM Kick Off avec ESS (mars) AO contrat d’assemblage de 30 CM CDR 2 Assembly of 9 Cryomodules Tests 3 CM Tests 3 CM Assembly of 21 Cryomodules Assembly of 21 Cryomodules Tests 3 CM Tests 3 CM Cryomodules de série Tests RF Tests stand 704 MHz | PAGE 8 HIGH LEVEL DEVELOPMENT PLAN FOR ELLIPTICAL CRYOMODULES

Banc de Conditionnement coupleurs 704 MHz Banc de Conditionnement coupleurs 704 MHz M-ECCTD H -ECCTD Cryomodules de Série Médium -  Cryomodules de Série High -  Supply of : Cavities, SAF, shieldings : CEA Equipped vaccum vessel: IPNO Supply of : Cavities, SAF, shieldings : CEA Equipped vaccum vessel: IPNO M-ECCTD assembly CDR -1 Marcket survey & procurement of 5 High Beta Cavities Assemblage H-ECCTD Components supply for Crymodules components Preparation of market survey MàJ Assemblage des Cryomodules Market survey for Contrat d’ étude d’industrialisation de l’assemblage des CM Kick Off avec ESS (mars) AO contrat d’assemblge de 30 CM CDR -H Assembly of 9 Cryomodules Tests 3 CM Tests 3 CM Assembly of 21 Cryomodules Assembly of 21 Cryomodules Tests 3 CM Tests 3 CM HIGH LEVEL DEVELOPMENT PLAN FOR ELLIPTICAL CRYOMODULES Cryomodules de série Tests RF Tests stand 704 MHz Test 1st Cavity + coupler Milestone P6: 13th oct 2017 Launch of H-ECCDT procurement PROPOSAL – SEE F. PEAUGER TALK

Description of the H-ECCTD project and its challenges – F. Peauger (CEA) Quality plan for H-ECCTD – CEA 12:00 am – 13:30 am: Lunch break Development plan and schedule – F. Peauger/P. Bosland (CEA) Vacuum vessel interfaces review from M-ECCTD return of experience – G. Olivier (IPNO) + V. Hennion (using Vidyo) Wish list from ESS (to be demonstrated using H-ECCTD) – C. Darve (ESS) Closing remarks and agreement from ESS – C. Darve (ESS) | PAGE 10