Public Meeting : Zoning By-law Amendment Application File No. ZBA 01/14 6939 Wellington Road 124 Dan Currie, MA, MCIP RPP MHBC PLANNING March 7, 2016.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Rossmore Secondary Plan Presentation to Council July 16, 2014.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
TOWNSHIP OF BECKWITH OFFICIAL PLAN REVIEW OFFICIAL PUBLIC OPEN HOUSE: AUGUST 24, 2010 OPEN HOUSE NO. 3 AGENDA  What is an Official Plan?  The Official.
Draft Policy Overview Utilities & Renewable Energy Planning Study Presentation By: Tim Cane, The Jones Consulting Group Ltd. November 12, 2008 Township.
June 5, 2007 BCC Called Public Hearing on BZA #SE , April 5, 2007 APPLICANT: Genesis Communications, Inc.
Town of Lyndon Zoning Bylaw Changes Town Planning Commission Public Informational Meeting 09December09.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Proposed CBS Municipal Plan and Development Regulations Amendments for Backlot Development Municipal Plan Amendment No. 9, 2015 Development Regulations.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
CITY COUNCIL WORKSHOP MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) DECEMBER 20, 2011.
Roles and Responsibilities in Municipal Land Use.
Consistency Determination: City of Seaside Local Coastal Program FORA Board Meeting March 15, 2013 Agenda No: 8a.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
 Introduction by the Chair  Confirmation of public notice  Municipal overview of planning applications  Public comment  Council & public questions.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Amherst County Comprehensive Plan (Update)
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
NEWPORT POINTE COUNTY FILES: GP# , RZ# , SD# , AND DP# BOARD OF SUPERVISORS HEARING June 4, 2013.
Environmental Impact Assessment in the Slovak republic.
Community Development Department FUTURE LAND USE MAP AMENDMENT GRAND HAVEN NORTH CONSERVATION AREA APPLICATION # 2604.
1 Public Planning Meeting Date: June 24, 2015 Application: Draft Plan of Subdivision, Official Plan and Zoning By-law Amendment Applicant: Highland Gate.
INFORMATIONAL MEETING AGGREGATE OPERATION PROPOSAL Add picture.
1 Presented to the Fort Worth League of Neighborhood Associations By the City of Fort Worth, Planning and Development Department August 24, 2009 CONSERVATION.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Planning and Zoning Division Jefferson County RZREHARING To amend existing Planned Development zone district to allow for mini-warehouse storage.
“ Grand Landings North” Comprehensive Plan Amendment & Rezoning City Council Public Hearing March 3, 2015.
Planning and Zoning Division Jefferson County RZREHARING To amend existing Planned Development zone district to allow for mini-warehouse storage.
Planning and Zoning Division Jefferson County RZREHARING To amend existing Planned Development zone district to allow for mini-warehouse storage.
Community Development Department City Initiated Comprehensive Plan Amendments (CPA) & Zoning Map Amendments Planning & Land Development Regulation Board.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
BUMSTEAD PIT Part Lot 27, Concession 7 Geographic Township of Holland Township of Chatsworth County of Grey Applications to Amend the County of Grey Official.
Eagle Heights Development Proposal Consists of two sets of development applications and two property ownerships: Paletta and Taylor lands. Paletta is applicant.
Prepared by: Alex Fisch Planning Services Division.
A PRESENTATION BY AYNSLEY ANDERSON AND LAUREN MARTIN OF BARRISTON LLP Aggregates 101 Pit stop(ped) at the OMB.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Flamborough Quarry Update Meeting September 19 th, 2006.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Vista Verde Ranch Revised Draft Environmental Impact Report Vesting Tentative Tract & Oak Tree Permit Project Description :70 unit single.
Public Participation Meeting June 15, 2016 Surplus Farm Dwelling Severances.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
Aggregates 101 Grey County Planning Process for Pits and Quarries April 24, 2015 Scott Taylor, MCIP, RPP Senior Planner.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
Presented by Kelsey Lang, Planning Associate June 27, 2016
Scoping Meeting April 20th 6:00 pm
PowerButte: Solar Overlay Replacement with PowerButte Guide
Site Plan Control By-law
New Comprehensive Zoning By-law December 12, 2016.
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
Jefferson County Planning Commission Hearing April 10, 2013
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
Neighbourhood Planning Review: Hidden Valley Area
Fifth Standard Solar Project Complex
MPO School Transportation Working Group
Tam O’Shanter Rezoning
SEQRA as a Tool to Review Energy Projects
La Grange Plaza Rezoning & Site Plans Site Construction Plans Site
Public Meeting Re: Proposed Erin Pit Extension
Official Plan and Zoning By-law Amendment Application
MH Thank you Mr. Chair, Good Morning Everyone
Proposed Zoning By-law Amendment & Future Consent Application
Presentation transcript:

Public Meeting : Zoning By-law Amendment Application File No. ZBA 01/ Wellington Road 124 Dan Currie, MA, MCIP RPP MHBC PLANNING March 7, 2016

Purpose of Presentation To provide a brief overview of the application: 1.Describe the process to date and next steps; 2.Summary of Agency comments; and 3.Review of the zoning regulations

Purpose of the Zoning By-law Amendment Application Zoning By-law Amendment to rezone the land from Agriculture (A) to Extractive Industrial (M3) to permit an above the water table pit Related Aggregate Resource Act (ARA) application submitted to Ministry of Natural Resources and Forestry

Subject Lands Area of ha (126.4 acres) Lands currently used for agriculture Surrounding area primarily comprised of agricultural uses Lands north of inactive quarry, CNR line, and Speed River Lands bisected by a high voltage transmission corridor SUBJECT LANDS Township of Woolwich City of Cambridge Township of Puslinch Township Guelph/Eramosa

Policy Context Lands designated Prime Agricultural by County of Wellington Official Plan and subject to a Mineral Aggregate Resource Overlay Aggregate extraction and associated uses are permitted by Official Plan, subject to rezoning No Official Plan Amendment required

Process Timeline Zoning Bylaw Amendment (ZBA) and Aggregate Resource Act application (ARA) proceed concurrently DateEvent March 10, 2014ZBA application received by Township April 17, 2014Application deemed complete by Township April 18, 2014Application circulated to commenting agencies April 24, 2014Revised ZBA application received by Township May, 2014Related ARA application deemed complete by MNRF May 20, day ARA public consultation process commences June 11, 2014ARA public information session (Approx. 30 people attended) June 12, 2014County files objection to ARA licence application June 18, 2014Township files objection to ARA licence application July 4, 2014ARA public consultation process concludes January 12, 2016Revised zoning by-law amendment submission received by Township January 18, 2016Applicant’s response to Burnside comments received by Township February 1, 2016Recommendation to schedule public meeting considered by Council March 7, 2016Public Meeting – to hear public comments on the application April/May 2016Recommendation on application considered by Council

Agency Comments TABLE 2. AGENCY COMMENTS AgencyComment SummaryConcerns Addressed Grand River Conservation Authority Impact on natural heritage features No objection to the application being taken forward for consideration Hydrogeological impacts Impact on on-site woodland Impact on wildlife Upper Grand District School Board No objectionsN/A Region of Waterloo (Transportation Planning) Region has no jurisdiction over proposed access N/A Township of PuslinchImpact on private wellsComments adequately addressed by revised site plan and supplemental information provided Accuracy of water table elevation Potential impacts to ground water Monitoring Program / Mitigation County of Wellington (Emergency Management) No commentsN/A County of Wellington (Planning & Development) Entrance on county roadComments adequately addressed by revised site plan and supplemental information provided Removal of woodlot Recycling operations Rehabilitation to prime agriculture County of Wellington (Roads Division) Entrance location / designNo objection to entrance location in principle, additional information regarding Traffic Impact Study required prior to approval of entrance Traffic on Wellington Road 124 intersection with Kossuth Road Township of Guelph/Eramosa (Engineering Consultants – Burnside) Technical site plan comments; hydrogeology; acoustic assessment; road access and sightlines; wildlife habitat Supplemental materials and responses generally addressed remaining issues. Additional information required regarding timing of construction of berms (noise report).

Agency Comments Ministry of Tourism, Culture and Sport Ministry satisfied with archaeological assessment. N/A CNExtraction setbacks from rail lineResponse from applicant provided, February 17, Comments pending. Drainage patterns Security and fencing Ministry of Natural Resources & Forestry* Removal of woodlandsMNRF’s outstanding concerns have been addressed. Impact on Species at Risk and Endangered Species Impact on natural heritage features Adequacy of mitigation measures Groundwater monitoring Six Nations of the Grand River*Interest in development relating to land, water and resources Applicant met with representatives on October 1, No response received since meeting. Interest in archaeological information Hydro One*Access to transmission towersResponse from applicant provided, November 26, Comments pending. Extraction surrounding towers (face of undisturbed area)

Zoning Analysis: Extractive Industrial-M3 Zone Applicable RegulationM3: Zoning By-law RequirementsProposed Development Setback for excavationWithin 15 m (49.2 ft) of any lot lineThe proposed extraction is set back at least 15 m from lot lines. Within 30 m (98.4 ft) from any part of the boundary of the site that abuts: a public road or highway or land zoned or used for residential purposes The proposed excavation is set back 30 m from lot lines that abut Wellington Road 124 and lands used for residential purposes. Within 30 m (98.4 ft) from any body of water that is not the result of excavation below the water table NA Setbacks for buildings, structures and stockpiles Within 30 m (98.4 ft) of any lot lineThe proposed structures and stockpiles are set back greater than 30 m from any lot line. Within 90 m (295.3 ft) from any part of the boundary of the site that abuts land zoned or used for residential purposes The proposed structures and stockpiles are set back greater than 90 m from lands zoned or used for residential purposes Maximum building height25 m (82.0 ft)The proposed maintenance building is less than 25 m in height

Next Steps Public Meeting (March 7, 2016) Planning Report for information purposes Opportunity for public comments Staff will review comments and prepare a recommendation report Council Meeting (date TBD) Planning Report providing recommendation Council decision on ZBA application