2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007.

Slides:



Advertisements
Similar presentations
2013 CASBO ANNUAL CONFERENCE & SCHOOL BUSINESS EXPO These materials have been prepared for the CASBO CBO Professional Council. They have not been reviewed.
Advertisements

Bond Election Presentation 2014 Webb Consolidated ISD.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
The Facts About the Hubbard ISD Bond Election 2008.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Jim Ned CISD School Bond Election May 8 th, 2010.
B.E.S.T. Building Excellent Schools Today Center Schools Application Overview.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Levy and Bond Recap Board Report September 10, 2013.
MSAD # PROPOSED BUDGET. MSAD #11 District Goals The budget was developed to ensure implementation of the district goals and to prepare students.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Long Range Facility Planning assisted by Silver Falls School District.
1. 2 A look at Katy ISD in square miles –three counties –two cities 47,800+ students 6,300+ employees 44 campuses 12 support facilities.
A Survey of Voter Attitudes in Douglas County, Colorado #12459 May 25-26, 2010.
College Station ISD Planning for Growth December 12, 2006.
Building for the Future of Johnston Schools Forum for Public Feedback on September 11, 2012 Bond Referendum Monday, October 29, :00 PM Summit Middle.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
Geary Public School 2010 Bond Issue Vote Tuesday December 14, 2010.
Sunnyside stands for education $88 million bond M&O override.
Growing Strong Moore Public Schools Bond Election February 12, 2013.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Georgetown ISD Citizen’s Advisory Committee On July 14, 2015 the Georgetown ISD Citizen’s Advisory Committee unanimously voted to recommend to the Georgetown.
Building the Future of Learning. Start with the Why Aging Facilities Phase Two of a master plan Safety concerns at McCamley Field Expand opportunities.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
SAM RAYBURN INDEPENDENT SCHOOL DISTRICT B OND E LECTION I NFORMATION 9363 East FM 273 Ivanhoe, Tx (903)
Saint Croix Central Task Force Findings May 2, 2012.
Lufkin ISD Tax Ratification Election (TRE) Lufkin ISD’s Plan to generate an additional $3,000,000 without a tax rate increase.
Ridgefield School District Capital Facilities Plan March 9, 2010.
Savoy ISD Tax Ratification Election (TRE) What is it and why it is needed.
Southland Public Schools Public Meetings Operating Levy Information October 13, :30 PM-Rose Creek Elementary School October 19, :30 PM-Adams.
LeRoy-Ostrander Public School Public Meetings Operating Levy Information October 20, :30 PM- LeRoy at school October 22, :30 PM-Ostrander at.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
The FACTS about the November 6, 2007 Bond Issue
Camas School 2016 Bond Fall 2015 A History of Caring, Quality, and Growth.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
COLLEGE STATION ISD 2015 Bond Information Election Date: November 3, 2015.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
SCHOOL LEVY INFORMATION Quincy School District February 2015.
Bond Proposal Student Enrollment Bond Accomplishments Voting Information District Achievements.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
BUDGET HEARING II Presented to the Board of Education MAY 10, 2016.
Medina Valley ISD 2016 Bond Information MISSION STATEMENT “Medina Valley Independent School District will challenge its students with an educational environment.
S.P.L.O.S.T. Building the Future … One Penny at a time “Building the future for the children of Crisp County…one penny at a time!”
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
Windsor C-1 School District Planning 2017
How we got to ‘U’ aka Measure ‘U’pgrade.
Capital Construction Bond Program
Welcome.
District Overview We’re growing: current enrollment 22,000 students
Bond Election Order “SHALL the Board of Trustees of the Rockwall Independent School District in Rockwall, Kaufman and Collin Counties, Texas be authorized.
Unanimous Vote by the Board of Education
UNION GROVE ELEMENTARY REFERENDUM
MSAD # PROPOSED BUDGET.
Referendum Discussion
Welcome and presenter introduction
Grade Configuration Change Overview
Independent School District No. 318 December 3, 2018
Property Tax Levy – Taxes Payable 2019
Town Hall on Budget & Taxes
Paynesville Area Schools
Public School Finance 101 Greg Cartwright, Chief Financial Officer Allen Independent School District 7:45 – 7:55 Tim Carroll (embedded slides)
Presentation transcript:

2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007

Dripping Springs ISD 2007 Bond Election Information Why is a Bond Election Needed? Current student enrollment at the middle school exceeds building capacity Existing enrollment and demographic projections for the high school campus show that future student enrollment will soon reach and exceed the capacity of high school facilities

Dripping Springs ISD 2007 Bond Election Information What is in the Bond Package? The $96.17 million dollar bond program includes: –Remodeling & expanding the existing middle school for use as an 1,800 student high school –Renovations & upgrades to the existing high school for use as a 1,200+ student middle school –Land for future school facilities –Fees and other bond associated costs

Dripping Springs ISD 2007 Bond Election Information Bond Program Detailed Overview & Estimated Costs Convert and Expand Existing Middle School to 1,800 Student High School Est. Cost $62.7 million Building Additions approx. 200,000 SFPerforming Arts Auditorium (Approx. 25,000 SF, 600+ Seats) ClassroomsModification/Expansion of Core Facilities Administration Core Facilities to Accommodate 2,500 Students LibraryData, Security, Fire Alarm, and Bell System Upgrades Competition Gym and Locker RoomsAthletic Improvements Career & Technology Education (Ag, Auto Running Track and Turf Field Mechanics, Computer Tech, etc.) Field House Buildings Sitework Practice Fields Excavation, Grading, and Site Demolition Tennis Courts Sidewalks, Parking, Drives, and SignageUtilities and Drainage Fencing, Landscaping, and IrrigationWastewater Treatment Facility

Dripping Springs ISD 2007 Bond Election Information Bond Program Detailed Overview & Estimated Costs Convert Existing High School to 1,200-1,300 Student Middle School Estimated Cost $13,600,000 New Entry Canopy, Parking, and DrivesRemodel of Existing Facility New Lobby and Main OfficeHVAC and Electrical Improvements Data, Fire Alarm, and Bell System UpgradesADA/Accessibility Upgrades Science ClassroomsTechnology Upgrades Stadium ImprovementsSecurity Improvements Land for Future School Facilities Estimated Cost $1,000,000 Fees and Other Bond Associated Costs....Estimated Cost $18,870,000 Furniture, Fixtures, and Equipment (FF&E)Infrastructure, Fees, and Permits Design, Engineering, and TestingBond Issuance Costs

Dripping Springs ISD 2007 Bond Election Information How were the projects for this bond package determined? A 2004 DSISD Facility Advisory Task Force recommended a Secondary School Study Group look at facility needs at secondary school level In 2005, the Secondary School Study Group (SSDG) initiated a study and process to develop recommendations to the District for the maximum student capacity, grade configurations, and use of existing buildings at middle and high school level A Long-Range District Facilities Planning Team was created to address the facility needs based on the SSDG recommendations –Appointed by the Board of Trustees –Included 74 community members representing all attendance areas –Included parents, grandparents, business owners, teachers, principals, administrators, staff, board members, and other community taxpayers The Planning Team reviewed data and facilities and projected needs for the next years This bond program was determined by the Planning Team to be the most appropriate solution for secondary facility needs in the District

Dripping Springs ISD 2007 Bond Election Information Secondary Enrollment Projection

Dripping Springs ISD 2007 Bond Election Information Why are we exchanging sites for the middle and high school? Current high school site does not have enough land to accommodate future growth for a 2,500 student campus The District already owns more available land at the middle school site A location “swap” allows the District to maintain previous investments in facilities and maximize use of available land

Dripping Springs ISD 2007 Bond Election Information Could we build a new school for the cost of these renovation projects? The amount of this bond package would not likely support either two new schools or one new school and the renovations/additions needed to bring the other campus to the desired capacity and functionality The cost of land for a new middle school or high school site is not affordable within this bond package amount

Dripping Springs ISD 2007 Bond Election Information Does the District currently own enough land for these middle and high school projects? Yes - The District owns sufficient land to complete these projects Some funds are included in this bond package for future land purchases

Dripping Springs ISD 2007 Bond Election Information When will the new schools open? Both the high school and middle school projects are proposed to be open in Fall 2010

Dripping Springs ISD 2007 Bond Election Information Will construction be going on while school is in session? Yes - Design will begin immediately if this bond issue passes As much as possible, construction will be planned to take place during the summer The District will work with architects and construction managers to plan a phased design that will provide the safest environment and least amount of disruption

Dripping Springs ISD 2007 Bond Election Information How were costs for these projects determined? The Long Range District Facilities Planning Team worked with a professional architect and a contractor to develop the scope and estimated costs of these projects

Dripping Springs ISD 2007 Bond Election Information When can we see drawings of these projects? The District worked with an architect to develop educational specification for facilities at all grade levels and conceptual studies The educational specifications have been approved by the Board of Trustees and provide framework for the campus expansion Once the bond passes, the actual design process will begin District staff, faculty, and the community will have an opportunity for input during the design process

Dripping Springs ISD 2007 Bond Election Information Is a new stadium included in this bond package? No – Funds are only included to support some modifications at existing athletic facilities

Dripping Springs ISD 2007 Bond Election Information How will this bond package affect my property taxes? It is estimated that the tax rate will increase 7.47 cents per $100 valuation This would result in an estimated monthly property tax increase of $12.45 on a $200,000 home in DSISD Estimated 2008 Annual Tax Impact on Residential Home Taxable Value of Residence w/o Exemptions $150,000 $200,000 $250,000 Estimated Annual Total Tax Increase $ $ $ Estimated Monthly Total Tax Increase $9.34 $12.45 $15.56

Dripping Springs ISD 2007 Bond Election Information If I’m over 65, how will this bond package affect my taxes? Unless new improvements are made to your home, taxpayers with an over-65 homestead exemption will NOT see an increase in their taxes if their taxes were frozen at the time of their 65 th birthday To have your taxes frozen, you must make application to your County Appraisal District

Dripping Springs ISD 2007 Bond Election Information What future facility needs does DSISD anticipate? The Long Range District Facilities Planning Team has considered future facility needs of the District The District has not implemented a time frame yet for any other future projects Student enrollment growth will be a critical factor in initiating future facility projects

Dripping Springs ISD 2007 Bond Election Information How can funds from this bond program be used? New schools Renovations to existing school facilities Furniture, equipment, technology Fees, cost of issuance of bonds Land purchases for future facilities

Dripping Springs ISD 2007 Bond Election Information Who is qualified to vote in this bond election? All registered voters residing within the boundaries of Dripping Springs ISD are qualified to vote in this election

Dripping Springs ISD 2007 Bond Election Information When and where can I vote? DSISD Administration Building –October 23, 11:00 a.m. – 7:00 p.m. –October 27, 10 a.m. – 4:00 p.m. –October 30, 11:00 a.m. – 7:00 p.m. Dripping Springs Middle School –October 25, 6:00 p.m. – 8:00 p.m. Dripping Springs High School –November 2, 6:00 p.m. – 8:00 p.m. Rooster Springs Elementary School –October 23, 6:00 p.m. – 8:00 p.m. Drippings Springs Elementary School –October 23, 6:00 p.m. – 8:00 p.m. Walnut Springs Elementary School –October 23, 6:00 p.m. – 8:00 p.m. Early Voting will be held at the following DSISD Locations: Plus additional early voting sites in Williamson & Travis County For a complete list of Early Voting and Election Day Polling Locations, contact DSISD at

Dripping Springs ISD 2007 Bond Election Information For more information, contact: Dr. Mard Herrick, Superintendent Dripping Springs ISD Mercer Street, Dripping Springs, Texas