GBLWMP-SLUP Integration February 5, 2010 Deline. Ecological Integrity Policy GBLWMPSLUP 4.5.2 (a): All activities in the GBLW must be consistent with.

Slides:



Advertisements
Similar presentations
EMS Checklist (ISO model)
Advertisements

Regulatory Landscape for Leased Federal Airports Archerfield Airport Community Aviation Consultation Group (AACACG) 2 November 2011 Helen Gannon Aviation.
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Responsible Resource Development April 17, Context Government focussed on responsible development of Canada’s natural resources to create jobs and.
CONSULTATION AND THE SAFEGUARD POLICIES ECA Safeguard Training for PIUs, May 17, 2011.
Rule-Making Book II EU Administrative Procedures – The ReNEUAL Draft Model Rules 2014 Brussels, May th Herwig C.H. Hofmann University of Luxembourg.
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Environmental Management System (EMS)
Outline What is the precautionary principle? Precautionary principle in the context of DSM Obligation to apply the precautionary approach Precautionary.
Fermilab Environmental Management System (EMS)
ISO General Awareness Training
Purpose of the Standards
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Forward Planning. 3 components: i) Forward planning Plans (County Development Plan and 12 Local Area Plans) Strategies (Housing/Retail/Wind) Studies (Housing.
SURFACE MINING CONTROL AND RECLAMATION ACT OF 1977 Rosemary Newsome.
Internal Auditing and Outsourcing
1 Next Generation ISO Susan LK Briggs Presented to EFCOG/DOE EMS Implementation, Lessons Learned & Best Practices Training Workshop, 3/05.
Sacred Sites. Documentation Documentation: Forest Supervisor or Ranger District Offices may document Sacred site (s) information in a variety of ways.
Overview of Land and Resource Management in the NWT.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Environmental Impact Assessment (EIA): Overview
Internal Control in a Financial Statement Audit
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
How Are Marine Protected Areas Created? A Guide for the Lay Person.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
Review of the Operational Policies and Guidelines: key issues from a civil society perspective Sven Harmeling, Germanwatch Held.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Disclosure of Preliminary Screening Staff package provided to MVEIRB prior to Board meeting MVEIRB informed of Board decision Decision issued three (working)
Planning and Community Development Department Housing Element City Council February 03, 2014.
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
LEGISLATIVE DEVELOPMENTS IN NATURE CONSERVATION AND HABITATS LAW IN 2011 Margaret Austin 29 March 2012.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
By Rachel Coleman.  “ The head of any federal agency having direct or indirect jurisdiction over a proposed federal or federally assisted undertaking.
CONCLUSION AND SUMMARY. How has (NLCA) been met? a) whether the project would enhance and protect the existing and future well-being of the residents.
SEA in the Czech Republic Prague, 24 September 2008.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of.
ICZM PROTOCOL INDICATORS THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT: What indicators are needed? Marko PREM Director a.i.
Bulgarian Geology and Mining Ministry of Environment and Water.
Overview of Proposed Alaska National Wildlife Refuges Regulatory Changes U.S. Fish and Wildlife Service.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
1 Application Process Gwich’in Land & Water Board WG 6 Document Review Prepared by Johnny Edwards.
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
ISO Most Common Problems May 25, 2000 Underwriters Laboratories Inc. May 25, 2000 Underwriters Laboratories Inc.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
TRTFN - BC Framework Agreement Planning Process Fred Oliemans, ILMB Bryan Evans, TRTFN Presentation to Public Workshop, Atlin, BC June 13, 2008.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
GBLWMP-SLUP Integration Meeting February 4-5, 2010 Sahtu Land Use Planning Board.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
SLUP Issues / Draft Agenda DLC & DRRC SLUP Meetings, February 4 & 5, 2010, Deline, NT.
Maintenance BC - NZTA assessment in TIO
Stakeholder consultations
Accountability and Internal Controls – Best Practices
NEB Modernization: Expert Panel Engagement Session March 7, 2017
Canadian Navigable Waters Act
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Joint Army-EPA Mitigation Rule
Presentation to Local Authorities
Neopay Practical Guides #2 PSD2 (Should I be worried?)
10th Air Quality Governance Lekgotla Session: 7.3
Presentation transcript:

GBLWMP-SLUP Integration February 5, 2010 Deline

Ecological Integrity Policy GBLWMPSLUP (a): All activities in the GBLW must be consistent with the maintenance of the ecological and cultural integrity of the GBLW. (b) Applicants…must demonstrate…that all aspects of their activities are consistent with the maintenance of ecological and cultural integrity. New SMZ CR: Applicants will assess the impacts of their proposed activities against the values identified for the zones and the reasons for protection, and mitigate their impacts to those values. Open to suggestions in wording…

Adaptive Management Policy GBLWMPSLUP Draft (c): Management must be adapted to emerging knowledge. It must take account of and integrate the best available scientific and traditional knowledge. And it must be defensible in terms of both of these bodies of knowledge. The traditional knowledge used to meet this policy must be specific to the area that will be affected by the activity under consideration. CR #8: Applicants will demonstrate that they have considered traditional knowledge, new technologies and adaptive management practices to develop appropriate mitigation measures to reduce impacts on the environment from their activities.

Research & Monitoring GBLWMPSLUP – Draft (a): [Regulators] shall ensure that each authorized party: (i): Establishes and maintains a site-specific research and monitoring program that is appropriate to the nature and scale of its proposed activity and adequate to demonstrate that all aspects of its activities are consistent with the maintenance of the ecological integrity of GBLW ecosystems. CR #18: Applicants will develop a site-specific research and monitoring program sufficient to document the impacts of their proposed land use activities on the ecological and cultural values identified for the zone in which the activity is proposed.

Restoration GBLWMPSLUP – Draft (a): [Regulators] shall ensure that each authorized party: (ii) Upon termination or abandonment of its activities, restores all areas affected by the activities to a condition consistent with the maintenance of the ecological integrity of GBLW ecosystems. CR #19: On termination or abandonment of activities, applicants will restore all areas affected to the condition they were in before the authorized land use activities began. Draft 3 will have further changes to the wording to address comments received on Draft 2: “ecologically functional and consistent with surrounding landscape”.

Security GBLWMPSLUP – Draft (a): [Regulators] shall ensure that each authorized party: (iii): furnishes and maintains security with the Minister sufficient for achieving the purposes in (a)(i) and (ii) above, as well as for any ongoing measures that may be required after abandonment or closing. CR#20: Applicants will furnish and maintain security with the Minister sufficient to achieve the reclamation goals stated above for their land use activities, and any ongoing measures that may be required after abandonment or closing. The SLWB has never collected security deposits on any application. They have identified this CR as an issue for them. The SLUPB is meeting with the SLWB to discuss the issue. This requirement may be revised or removed for Draft 3.

Permafrost GBLWMPSLUP – Draft (c): All infrastructure in the Special Management Zone must be built, monitored and managed so as to prevent and where necessary rectify any negative environmental effects that may result from the infrastructure’s degradation or aggradation of permafrost. CR #11: Applicants will design their land use activities to prevent and/or mitigate adverse environmental impacts resulting from the degradation or aggradation of permafrost.

Consultation GBLWMPSLUP (i): Applicants…shall design and implement their activities in close consultation with the appropriate Déline authorities. All bodies having authority under subsection 46(1) of the MVRMA shall consult Déline authorities prior to issuing licences, permits or other authorities under existing legislation. Draft 2 CRs #6 and 14 require community consultation on traditional use and wildlife areas Actions #2 and 3 require communities and government to document consultation requirements Draft 3 New requirement for enhanced consultation on identified values for SMZ Further work on above CRs & Actions (broaden scope?)

Consultation (continued) GBLWMP (i): …For greater certainty, the Mining Recorders Office …and the National Energy Board shall consult Déline authorities prior to issuing approvals under [their] authority in the Special Management Zone. INAC: “INAC does consult and request information from the Sahtu before issuing any prospecting permits in their area…the timeline…is extremely short… as prescribed in legislation.” NEB: “…specific responsibilities are placed on the NEB that extend responsibilities beyond the NEB’s mandate and jurisdiction…The inclusion of the above condition may cause confusion with the expectations of Crown Consultation (which the NEB does not and is not able to perform)…the NEB cannot function as a quasi-judicial tribunal and perform Crown Consultation activities.”

Purpose of Meeting SLUPB has to integrate the GBLWMP into the SLUP Conflicting comments from the Parties and other Planning Partners Goal: Find common ground so the Board can develop a SLUP that is acceptable to everyone

The Path Forward The SLUPB has, and will continue to make best efforts to integrate the GBLWMP into the SLUP in a way that captures the spirit and intent of that plan, within the constraints of our process. Integrate the Water Heart and Elders Teachings into the “Plan” in the most appropriate places Integrate the context into the “Plan” as rationale for plan requirements wherever possible and appropriate Open to further suggestions in wording Further consultations after Draft 3

Constraints Timelines – Will not delay Draft 3 Funding – SLUPB is not funded to pay for community consultation INAC’s comment? Other Interests – 21 orgs, 30 submissions, over 750 comments to address/respond to

Next Steps / Options Deline can submit specific comments, suggestions on the SLUP – Deadline is in 2 weeks Board will produce Draft 3 based on consideration of the information and comments received Opportunity for longer consultations with Deline following Draft 3 Discussion and Closing Comments