CLIC08 Workshop, CERN 14-17 October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.

Slides:



Advertisements
Similar presentations
Solomon William KAMUGASA
Advertisements

Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
H. SCHMICKLER Alignment challenges for a future linear collider.
Applied Geodesy Group Survey and Alignment of the ILC An approach to cost calculation and network simulations VLCW06 Vancouver, British Columbia, July.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
PACMAN : technical objectives Hélène Mainaud Durand.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Alignment and stability session
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Recent developments on micro-triangulation
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
What Should We Do?.
List of changes and improvements for the next generation CLIC module
Need for Alignment Position of off-momentum proton w.r.t. beam
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
Alignment challenges for a future linear collider
Presentation transcript:

CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND

Pre-alignment study status and model for the beam dynamics simulations OVERVIEW INTRODUCTION – alignment requirements SURVEY AND ALIGNMENT GENERAL CONCEPT PRE-ALIGNMENT STUDY STATUS A known and stable alignment reference Sub-micrometric sensors Fiducialisation and internal metrology MODEL FOR THE BEAM DYNAMICS SIMULATIONS CONCLUSION

Pre-alignment study status and model for the beam dynamics simulations STRATEGY OF CLIC ALIGNMENT Within +/- 0.1 mm (1  ) Mechanical pre-alignment Implementation of active pre-alignment Implementation of beam based alignment Implementation of beam based feedbacks Girders and quadrupoles within ± 10  m (3  ) Active positioning to the micron level Stability to the nanometer level

Pre-alignment study status and model for the beam dynamics simulations PRE-ALIGNMENT REQUIREMENTS The tolerance of the transverse pre-alignment of the CLIC components is: ± 10 microns (3  ) on a 200msliding window along each linac At the micron scale: this pre-alignment needs to be active (ground motion, noise of accelerator environment, temperature dilatations)  continuous monitoring of the position and re-adjustment when necessary. A scale order concerning this pre-alignment : For the LHC: ± 0.1 mm over 100 m (1  ) For the ILC: ± 0.2 mm over 600 m (1  ) ( in the vertical direction) CLIC pre-alignment = technological challenge

Pre-alignment study status and model for the beam dynamics simulations GENERAL ALIGNMENT CONCEPT

Pre-alignment study status and model for the beam dynamics simulations GENERAL ALIGNMENT CONCEPT As it is not possible to implement a straight alignment reference over 20 km: use of overlapping references Two references under study: a stretched wire a laser beam under vacuum

Pre-alignment study status and model for the beam dynamics simulations Simplification of the problem by prealigning components on girders Simplification of the alignment by linking adjacent girders by a common articulation point Association of a « proximity network » to each articulation point Association of a « propagation network » to every x articulation point GENERAL ALIGNMENT CONCEPT

Pre-alignment study status and model for the beam dynamics simulations GENERAL ALIGNMENT CONCEPT The feasibility is proved if one can demonstrate: A stable alignment reference, known at the micron level Sub-micrometric sensors A mechanical/electrical zero of each sensor perfectly determined with respect to the reference of the component to be aligned  Implementation of a R&D strategy in order to prove the feasibility of the pre-alignment solution, reviewing each key point carefully. This solution of pre-alignment must be compatible with the general alignment strategy, and with the other accelerator equipment or services.

Pre-alignment study status and model for the beam dynamics simulations PRE-ALIGNMENT STUDY STATUS A known and stable alignment reference Sub micrometric sensors Fiducialisation and internal metrology

Pre-alignment study status and model for the beam dynamics simulations A STRETCHED WIRE AS AN ALIGNMENT REFERENCE On the scale of a micron, the stability and the determination of the shape of the wire are far more difficult to reach. Among the parameters that can contribute to variation in the shape of the wire: Gravity change, function of: Wire location Distribution of the masses in the neighborhood Attraction of the moon and the sun Effect of the rotation of the Earth Weather report (humidity, temperature) Air currents

Pre-alignment study status and model for the beam dynamics simulations TT1 TEST FACILITY First results: Good knowledge concerning the installation of long stretched wires Great impact of humidity variations on the lineic mass of a wire (and on the sag), but we know how to correct it Very good uncertainty of measurement between sensors along 2 wires of different length (100 m and 140m):  0.4  m (radial) and 0.6  m (vertical) over 2 days (stable conditions) Next steps: an upgrade of the facility To confirm the effect of the rotation of the Earth To modelize the vertical shape of a stretched wire without the HLS system Why not to try to stretch longer wires, in order to decrease the propagation error along the linac?

Pre-alignment study status and model for the beam dynamics simulations 500 m TEST FACILITY

Pre-alignment study status and model for the beam dynamics simulations A STRETCHED WIRE AS AN ALIGNMENT REFERENCE Study the influence of the gravity changes on a stretched wire and on the leveling system (foreseen for the modelization of the shape of the wire) Next studies and tests… To obtain a better knowledge of the parameters that influence the shape of the wire Gravimetric studies have been undertaken concerning the accuracy which can be obtained concerning the determination of the geoid. Alternative solution: development of an laser based alignment solution, in collaboration with NIKHEF.

Pre-alignment study status and model for the beam dynamics simulations AN OTHER ALIGNMENT SYSTEM: RasCLIC Sub micrometric resolution Low frequency seismograph.  Problem: how to use it for the CLIC pre-alignment?

Pre-alignment study status and model for the beam dynamics simulations PRE-ALIGNMENT STUDY STATUS A known and stable alignment reference Sub micrometric sensors Fiducialisation and internal metrology

Pre-alignment study status and model for the beam dynamics simulations SUITABLE SENSORS What is needed: A sub micrometric resolution A known and controlled drift A good interchangeability and a suitable mechanical interface Repeatability of measurement better than the micron Upgrade of the existing capacitive-based WPS sensors Development of an optical -based WPS sensor

Pre-alignment study status and model for the beam dynamics simulations SUITABLE SENSORS A better interchangeability and determination of the zero (± 5  m expected) A more suitable mechanical interface Upgrade of the existing capacitive-based WPS sensors

Pre-alignment study status and model for the beam dynamics simulations SUITABLE SENSORS Development of an optical -based WPS sensor Promising Vectran wire A more suitable mechanical interface Absolute measurement within a few microns. (under tests)

Pre-alignment study status and model for the beam dynamics simulations PRE-ALIGNMENT STUDY STATUS A known and stable alignment reference Sub micrometric sensors Fiducialisation and internal metrology

Pre-alignment study status and model for the beam dynamics simulations METROLOGY AND FIDUCIALISATION In the CTF2 facility, the components (CAS, PETS) were maintained aligned in a closed loop w.r.t. a stretched wire within a window of ± 5 microns, thanks to sensors and micro movers, in a very radioactive environment. Fiducialisation within a few microns Small scale solution to align the accelerating cavities on the girders Mechanical design to update (modification of the size of the components, integration of the other equipments and services) But…

Pre-alignment study status and model for the beam dynamics simulations Aligned independently from the girders along 5 degrees of freedom Micrometric supporting solution tested and validated in the CTF2 facility, but non compatible with the stabilization required (1 nm in vertical) All these solutions will be tested in the CLEX facility ( ), but before it is necessary: to propose a solution for the fiducialisation to finalize the technical specifications concerning the stepper motors in order to buy the propotypes asap. the compatibility between the pre-alignment solution and the stabilization solution concerning the « main beam » quadrupole is studied in conjunction with the Stabilization Working Group. METROLOGY AND FIDUCIALISATION The case of the « main beam » quadrupole

Pre-alignment study status and model for the beam dynamics simulations MODEL FOR THE BEAM DYNAMICS SIMULATION The simulations. Why ? How ? Simulation of the propagation network Simulation of the modules Validation of the simulations

Pre-alignment study status and model for the beam dynamics simulations THE SIMULATIONS. WHY ? HOW ? The simulations of the CLIC prealignment are essential for the design of the alignment strategy. The results inform where improvements have to be done in order to reach the required alignment tolerance of 10 μm along a 200m sliding window. But we weren’t alone to be interested by these simulations. They are important for the beam dynamics studies. They need them in order to get an accurate idea of the misalignment effects on the beam itself. This presentation gives the first results of the CLIC prealignment simulations and the stategy which has been set up to validate them. These simulations are a first approximation. All the modules degrees of freedom have not been taken into account.

Pre-alignment study status and model for the beam dynamics simulations Reference points are defined at each pit according to the geodetic measurements made on the surface (GPS, triangulation). The main plates of the propagation network are defined according to these points (metrological calibration). The propagation network can now be built. THE SIMULATED MEASUREMENTS – STEP km (?)

Pre-alignment study status and model for the beam dynamics simulations THE SIMULATED MEASUREMENTS – STEP 2 Length of one wire WPS sensor Wire 1 1. The position of the sensor in the middle of a wire according to the ones at its ends is given by ecartometry. 2. Thanks to a metrological calibration, the position of each sensor of the plate according to the others is known. Now, the geometry of the whole propagation network, i.-e. of the whole wires, is known. We can align the modules according to it. This is the minimum configuration. In order to optimize the accuracy, redundancy can be introduced. 2

Pre-alignment study status and model for the beam dynamics simulations THE SIMULATED MEASUREMENTS – STEP 3 Wires On each module takes place a WPS sensor. Its position is known according to the wire by ecartometry. 4. The position of the articulation point between 2 modules is known according to their sensors (metrological calibration). 5. The fiducialization : we get the beam entrance and exit points on one module from the articulations points.

Pre-alignment study status and model for the beam dynamics simulations SIMULATION OF THE PROPAGATION NETWORK (1) The propagation network has been simulated along 22km in different configurations. Different numbers of reference points, i-e the number of pits have been tested : 2, 3 and 6. For 6 pits, the maximum deviation is ±1mm.

Pre-alignment study status and model for the beam dynamics simulations SIMULATION OF THE PROPAGATION NETWORK (2) In order to pre-align the modules in the required tolerance, the deviation of the propagation network has to be as smooth as possible. The offsets of the WPS are actually around 20μm. It seems feasible to reach 5μm. Both of these values have been simulated.

Pre-alignment study status and model for the beam dynamics simulations SIMULATION OF THE MODULES (1) The pre-alignment tolerance in the transversal direction is 10μm along a 200m sliding window. It is a 3σ tolerance. I-e the accuracy is around 3μm. The output of the modules simulations is the coordinates of their beam entrance and exit points. Let us assume a module point O. Thanks to the least square method, the “best” straight line for all the modules points less than 100m apart from O is computed. We get the distances of each point to this line. The standard deviation of theses distances is the pre-alignment accuracy along 200m. By moving O along the linac, we have the accuracy of the modules pre-alignment along a 200m sliding window.

Pre-alignment study status and model for the beam dynamics simulations CLIC requirement SIMULATION OF THE MODULES (2) The modules pre-alignment has been simulated along 400m using 400m wires. The offsets of the WPS here are 5μm. The accuracy along the 200m sliding window is between 4 and 8μm. This includes the errors due to the overlapping wires. But we are still less accurate than the CLIC requirement.

Pre-alignment study status and model for the beam dynamics simulations VALIDATION OF THE SIMULATIONS (1) Some hypothesis have been assumed in these simulations. What about their validations ? The length of the wire (400m). It has been proven that the WPS can reach a 5μm precision along a 500m wire. The metrological calibration have a 5μm accuracy. It is the accuracy of the CMM machine used actually at CERN by the metrology laboratory (TS/MME). The accuracy of the CLIC components fiducialization is 2μm. This has not yet been proven. The accuracy of the WPS (offset error) is 5μm. This is the result we expect to have in the following months.

Pre-alignment study status and model for the beam dynamics simulations VALIDATION OF THE SIMULATIONS (2) The 5μm accuracy of the WPS sensors used in these simulations has to be demonstated. A new 3 balls fixation system and a calibration bench have been developped. It will be tested soon in the TT1 facility.

Pre-alignment study status and model for the beam dynamics simulations CONCLUSION A R&D strategy is being actively followed. CLIC team working full time on the subject: a Surveyor doctorate student, in charge of the methods and strategies of alignment, the simulations, as well as the research studies on the wire itself. a Fellow in charge of the mechanical studies, of the development of an optical WPS, being also an interface with the stabilization studies. a geodesist doctorate student, in charge of the theoretical and practical studies concerning the influence of the gravity on a stretched wire. We also would like to open the CLIC survey and alignment studies to the Survey groups from other labs (FNAL, SLAC, Argonne, KEK, DESY), in particular concerning the development and qualification of sensors. The first contacts have already been taken.