Section 6-T14N-R94W Sweetwater County, Wyoming 13000’ Almond Test April 24 th, 2010 James Benson Kristin Carter Patrick Gardner Brandon Heiner Aaron Bounds.

Slides:



Advertisements
Similar presentations
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Advertisements

Well Design PE 413 Introduction and API Standards of Casing
PETE 411 Well Drilling Lesson 17 Casing Design.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
PETE 203 DRILLING ENGINEERING
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Chapter 3 Casing design.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Petroleum Engineering 406
Lesson 20 Abnormal Pressure
DRILLING ENGINEERING Well Control.
Well Control Gas Solubility.
Petroleum Engineering 406
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
Trouble in the Gulf Deepwater Horizon
Hydraulic Fracturing Best Management Practices Environmentally Friendly Drilling Program John Michael Fernandez Matthew Gunter.
Supported / Created by IOGA WV Provide factual information Debunk false information In-depth look into the natural gas industry.
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
Petroleum Engineering 406
Petroleum Engineering 411 Well Drilling
BASIC MUD LOGGING.
Hydraulic Fracturing 101. What is Hydraulic Fracturing? Hydraulic fracturing, or “fracking”, is the process of drilling and injecting fluid into the ground.
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Drilling Engineering – PE311 Rotary System
Lesson 10 Drilling Hydraulics (cont’d)
Lesson 25 Well Control, cont’d
Outline Pore Pressure and Fracture Gradient Drilling Fluid Casing Design Cement Design Drilling Bit Economic Analysis.
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
New Fluid Solutions, Inc. NFS-BlackSeal ®. Overview Generally, the types of formations that are prone to lost returns are cavernous and vugular, naturally.
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
PETE 411 Well Drilling Lesson 9 Drilling Hydraulics - Hydrostatics.
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Dual Gradient Drilling Basic Technology Confidential to DGD JIP
Lesson 18 Casing Design Example
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
DRILLING.
Gas Exploration Team Hail 7 Casing Design. Overview Wellbore Schematic Design and load assumptions Design Factors Casing Strings & Connections Details.
Well Design PE 413.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
Casing Design.
April 12, 2012 Shale Gas Extraction.
Downhole Drilling PRODUCTS Bio-Stable Drilling Fluid Fuel Maximizer.
Hydraulic Shale Fracturing Kyle Koliba Robert Stroud
Alex Procyk, ConocoPhillips, David Atwood, Schlumberger
The Original Drilling Fluids Company™ 2012 Baroid IDP Basic Drilling Fluids Workshop Introduction to Drilling Fluids.
Lesson 21 Prediction of Abnormal Pore Pressure
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Wellbore Stability in Olmos Formation
An Automated Approach to Wellbore Stability Analysis Petroleum Engineering Senior Design II GROUP L: QUENTYN GUGLIELMO HUGH HANNUM CARSON POLLAT BRONSON.
RICK COOPER DIRECTOR OF THE DIVISION OF GAS AND OIL VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY Gas and Oil Well Drilling Requirements for the Tidewater.
ESPY 1-22 Solution GROUP P: JEREMIAH LARSON, CLAYTON HAWORTH, MOHAMMED JAFFAL.
Logo here… PORE PRESSURE PREDICTION OF SOME SELECTED WELLS; INSIGHT FROM THE SOUTHERN PLETMOS BASIN, OFFSHORE SOUTH AFRICA. Oluwatoyin Ayodele, Mimonitu.
CASING.
Chapter 2: Casing Design Introduction and API Standards of Casings
Hydraulic Fracturing 101.
Cementing How it is Done
INSTRUCTOR © 2017, John R. Fanchi
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Chapter 2: Casing Design Casing Selection
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Macondo: BP MC 252 A-1.
Design Factors Collapse Corrected
Casing Point Selection
Casing Design Workshop
Design Calculations Combination Strings
Coal Bed Methane Cementing Best Practices
Presentation transcript:

Section 6-T14N-R94W Sweetwater County, Wyoming 13000’ Almond Test April 24 th, 2010 James Benson Kristin Carter Patrick Gardner Brandon Heiner Aaron Bounds

 Introduction  Health, Safety and Environmental  Geology / Hazards  Mud program  Casing Design criteria  Casing Program  Economics  Conclusion, Q&A

 Purposes of casing: ◦ Protects and isolates wellbore and surrounding formations  Prevents contamination of water sources and, vice versa, keeps unnecessary water out of the produced fluids ◦ Strengthens wellbore  Can hold back weak formations from sloughing into wellbore and also keeps overweighted drilling fluids from fracturing and entering weak formations

 Casing pipe itself is basically a standardized large-diameter pipe ◦ Casing grades are denoted with a letter for tensile yield and an abbreviated number for yield strength  “J-55” grade steel can withstand 55,000 psi before it starts to fail  In general, stronger casing (like P-110, for example) is more susceptible to hydrogen sulfide (H 2 S) embrittlement due to the metallurgy

 Safety procedures put in place can be the weight of the mud, additional rams, a larger gas buster, and a flare. The heavier the mud weight the more pressure is placed on the recovered product. The weight must be balanced with the pressure of the formation and the product. Too heavy mud can cause fractures in the formation which can also be problematic.  The additional rams may be put in place to ensure that if there is a well control issue then the BOP can be closed.  If a well is high pressure there stands the potential for a large amount of gas, increasing the size of the buster may help when that gas is coming to surface.  The flare will be used in conjunction with the buster to destroy the gas and help relieve pressure.

 Six named formations must be traversed before reaching the Almond

 Mixed oil shales, coals and sandstones ◦ Possibility of losing circulation to natural fractures ◦ Supplies Wamsutter with municipal water ◦ Shallow formation (roughly 1500’)

 Mudstone with sandstone lenses and coal seam cap ◦ Lost circulation common ◦ Depth of roughly 3000’

 Mixed sandstones, shales and coal seams ◦ Weak formation  Washouts common ◦ Many coal seams can lead to lost circulation ◦ Depth: 5800’

 Mixed shale, siltstone, sandstone and coal seams ◦ lost circulation is an issue ◦ Depth approximately 9200’

 Sandstone ◦ Known to contain uranium in other parts of the country, unknown here ◦ Depth of roughly 10,200 feet

 Shale with bentonite stringers ◦ Possible wellbore stability problems ◦ Known to be a transition zone to higher (abnormal) pressures ◦ Depth: 10,500 ft

 Target zone  Mixed sandstone, bentonitic shale, coal seams ◦ Known to be overpressured ◦ Coal seams can take mud ◦ Depth approximately 12,600 feet

 Standard 8.5 ppg mud until about 6000 ft  Escalate mud weight to 10 ppg at 10,000 ft  Lewis formation (10,450 ft) is expected to be transition to overpressured zones ◦ Increase mud weight to control formation pressures ◦ Final mud weight should be between ppg

Casing Design Criteria: Account for swab and surge pressures by adding a margin on both gradients Work from the bottom to top, starting at TD and using the least number of different casing sizes possible while staying between the gradient margins

 Industry standard of 1.12 ◦ Using tensile load as a factor to derate collapse pressure rating from Halliburton “Red Book” (or similar source)

 As the length of a casing string increases, the weight of lower pipe adds to tensile stress and derates the pressure capability(as above) ◦ Industry standard is a TDF of 1.8  TDF= Joint Strength / Tension Load

This shows why a single piece of casing will not suffice. -One string will not allow adequate pressure control during the entire length of the wellbore even ignoring surge and swab pressure margins

Using the above chart:  Bottomhole pressure will be around 9500 psi ◦ For 5 ½ in. casing, P-110 grade (20 lb/ft) withstands 11,080 psi ◦ This casing becomes “overkill” at about 10,000 ft  Could change casing to a smaller size or lighter grade steel to save money

From the pore pressure chart, the next casing should be designed around a “bottom” pressure of around 6200 psi ◦ Needs to accommodate a 6 ½ inch bit ◦ 7 ⅝ inch C-95 casing at 33.7 lb/ft withstands 9,380 psi  Appears to be overdesigned for pressure  Also need to consider tensile load – may be the limiting factor

 The 2-string designs average $500k in materials  3-string design runs $800k just for materials, on top of extra rig time (tripping, cement setup and crew, casing crew and other labor)

 Modified casing sizes for economics ◦ Supported by other wells in the area ◦ Used data from nearby wells  Formation data  Gas data  Production data

Tubing SizeGradePrice / ftLengthTotal Price 10 3/4J/K-55$ $45, /8HCP-110$ $367, /2P-110$ $44, Tubing: 2 7/8N/L-80$ $78, Design (#2) Total$534, Tubing SizeGradePrice / ftLengthTotal Price 9 5/8J-55$ $35, HCP-110$ $302, /2P-110$ $39, Tubing: 2 3/8N/L-80$ $59, Design (Final) Total$436, Savings: $98, 240

 Saves almost $100k on materials, will not have significant effect on production ability  Surface casing: 9 ⅝ in. J lb/ft to 1520 feet  String #1: 7 in. HCP-110 to 10,500 feet  String #2: 4 ½ in. P-110 from 10,000 to 13,000 feet  Tubing: 2 ⅜ in. L-80 from 13,000 feet to surface

-Generated from Schlumberger’s I-Handbook

 waterplan.state.wy.us/plan/green/techmemos/mu niuse.pdf waterplan.state.wy.us/plan/green/techmemos/mu niuse.pdf  Halliburton Cementing Tables, April 1999  Applied Drilling Engineering, Bourgoyne et al, SPE 1991  Wyoming Oil and Gas Conservation Commission, wogcc.state.wy.us/ wogcc.state.wy.us/  Toolpushers Supply Company,  Devon Energy,