P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.

Slides:



Advertisements
Similar presentations
Design Review UL Vibration Test Apparatus May 13, :30PM Est.
Advertisements

Client Status Presentation Team Members: –Tom HamiltonTreasurer –Kevin HarkinsDocument Coordinator –Alan KinnamanTeam Leader –Robert NapperLiaison –Bill.
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
Academic Advisor: Dr. Dave Turcic Team Members: Ron Pahle Khoa T. Tran Duc M. Le Thanh Q. Nguyen Shafi Alhajri Sponsoring Company: Edwards Vacuum Ltd.
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
Background Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires.
Design Review UL Vibration Test Apparatus May 13, :30PM Est.
1 P14471 Vibration Testing Apparatus II Final Review 5/13/2014 Brett Billings Jacob Gardner Nick Greco Ron “Sparky” Jimbo Claire Kobal Ryan Selig Ashley.
Jake Manley-Project Lead/EE Mitchell Sedore-ME Brian Benner-ME Anushka Kalicharan-ME Kyle Abbott-ME.
P14474: Hydrostatic Test Apparatus Jake Manley Anushka Kalicharan Mitchell Sedore Brian Benner Kyle Abbott.
1 Connecticut Corsair Senior Design School of Engineering Connecticut Corsair Senior Capstone Design Project.
P14007: Wheelchair Assist Che-An Lee Phil Medalie Dan Schuster Tom Elliot.
Systems Level Design Review UL Vibration Test Apparatus January 11, 2013 KGCOE Room # :00AM-12:00PM Est.
Recreation and Wellness Intranet Project
Loading Apparatus for High Velocity Tissue Rupture Mechanical Engineering Dalhousie University Senior Design Project Winter 2010.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
Department of Electrical and Computer Engineering Lighting Tool Box Winter 2004 ECE 498 Team Members: Nick Sitarski Blaine Thompson Brandon Harris Dave.
Transmission Oil Pump Audit Test Stand Project Overview.
Problem Definition Review Reciprocating Friction Tester.
Grob Systems, Inc., the customer, requires an industrial computer system that will have a function of acquiring raw data, processing the data, presenting.
Optical Encoder for a Game Steering Wheel May Team members Sam DahlkeCpr E Peter FecteauCpr E Dan PatesEE Lorenzo SubidoEE Advisors Dr. James Davis.
Multidisciplinary Senior Design Project Charles Alexander, Tom Christen, Kim Maier, Reggie Pierce, Matt Fister, Zach Mink Underwater Thermoelectric Power.
Wind Turbine Design and Implementation Phase III Senior Design May Team Andrew Nigro (EE) Chad Hand (EE) Luke Rupiper (EE) Ryan Semler (EE) Shonda.
P14471 Vibration Testing Apparatus II Detailed Design Review 12/10/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
TEAM 14 John Armitage Douglas DeVoto Brian Polkowski Marykate Wioncek SOUTHCO Vibration Fatigue Tester.
Marcos Esterman, Associate Professor Industrial and Systems Engineering Department Rochester Institute of Technology Multidisciplinary.
PROJECT MEMBERS: COLIN PAYNE-ROGERS JACOB LENNOX Change of Resistance Test Stand PROJECT GUIDE/MENTOR: DR. BENJAMIN VARELA PRIMARY CUSTOMER: JOE MANAHAN.
Motor Assisted Wheelchair Design Review 09/10/15.
P  Customer Dr. Schrlau  Team Jacob Bertani Bridget Lally Avash Joshi Nick Matson Keith Slusser  Guide Bill Nowak.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
TEAMSKILL an exploration of manufacturing The development of this simulation was sponsored by Honeywell and Metal Working Production magazine and run twice.
Expansion Joint Active Monitoring. Team Members Joe Savino – Project Lead Mechanical Engineer Adam Remick – Customer Contact Electrical Engineer Andrew.
P16680: AATech Universal Oil and Bag System Bryce Mowers Jessica Reed Maria King Nicole Anklam Philip Couturier Samantha Orlando.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
P15051: Robotic Eye Project Definition Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
Smoke Notification System (SNS) Final Presentation Senior Design 1 April 18, 2013.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
Luminaire Vibration Test Apparatus: P14471 Team MemberMajor Brett Billings, Team LeadIndustrial and Systems Engineering Nicholas Greco, Lead Mechanical.
Electrophotographic Cascade Development Apparatus Zachary FoggettiBridget Kearney Dalton MeadRuishi Shen Michael WarrenThomas Wossner.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
P14471 Vibration Testing Apparatus II Subsystems Design Review 10/29/2013 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
P14471 Vibration Testing Apparatus II Integration Demo 4/15/2014 Brett Billings Jacob Gardner Nick Greco Ron Jimbo Claire Kobal Ryan Selig Ashley Waldron.
Week 3 Review Team P14029 McKibben Muscle Robotic Fish Zak Novak John Chiu Seaver Wrisley Felix Liu.
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Multidisciplinary Senior Design I: Problem Definition Review
Right Move, Right Place, Right Time
P14551: Multi-Process 3-D Printer
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
P15661 Reciprocating Friction Tester Base Subsystem
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Multidisciplinary Senior Design I
Tub Lift Rev. 2 Dom Group
P15661 Reciprocating Friction Tester Base Subsystem Problem Definition Review Matt.
Presentation transcript:

P14471 Vibration Testing Application

Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical Engineer Ashley WaldronScribeMechanical Engineer Claire KobalEDGE MasterMechanical Engineer Jacob GardnerMechanical Engineer Ron JimboElectrical Engineer Ryan SeligElectrical Engineer

Agenda Problem Statement and Deliverables Project Background Customer Needs Engineering Requirements House of Quality Project Timeline Team Norms and Values

Current Product Old machine Motor recently died Oil splatter Senior Design Created the displacement control mechanism for the vibration apparatus

Problem Statement: Project Cooper Crouse-Hinds Industries is a leader in the manufacturing of luminaires, an encased lighting system, for hazardous locations. These luminaires are placed in environments in which they are subject to harsh vibrational disturbances. Luminaires must meet the testing standards set in UL 844, which include vibration RPM and displacement, apparatus setup, and test duration. The company is currently using an outdated testing apparatus and would like to incorporate improvements into the new design. This project is a continuation of P13471 which started the process and has already built the eccentric drive mechanism. The new design still requires a frame, motor, and control system.

Background Information Luminaire A lighting fixture that could be exposed to hazardous conditions UL 844: Test fixture must: Vibrate luminaire at 2000 cycles/min Total displacement of 1/32” Operate for 35 hours

Project Deliverables Completed frame Appropriate motor selection and implementation Speed Control Alternatives Visual display Speed of motor Displacement Documentation User Manual Maintenance Manual Test data verifying the operation of the apparatus

Stakeholders Primary Customer: Joe Manahan Cooper Crouse-Hinds Dr. Varela Team Lab Technicians Secondary Customer: Companies who purchase luminaires from Cooper Crouse-Hinds RIT

Customers Needs RequirementsImportance Adherence to UL 844 standard5 Apparatus is safe5 Motor must be compatible with available voltage5 Ability to test multiple configurations3 Easy to use3 Easy to maintain2 Visually display test information/feedback to operator3 Ability to test a range of luminaire weights4 Cost under $4,0003 Long service life4 Similar dimensions to existing machine1

Engineering Requirements NumberRequirement Raw Score Units Ideal Measure 1 Displacement of luminaire69in1/32 2 Vibration of luminaire69cycles/min Duration of vibration test69hours35 4 Isolate motor from oil spills45BinaryYes 5 Maintenance Documentation44Survey (easy to follow)80% 6 Mount pendant configuration35BinaryYes 7 Operation Documentation33Survey (easy to follow)80% 8 Machine won't operate if crankshaft enclosure is open25BinaryYes 9 Completely stop machine with Emergency Stop25seconds< Maximum voltage of Motor25V AC Minimize number of operators21people2 12 Max weight of mounted luminaire20lbs> Visually display settings and status of test18BinaryYes 14 Steps to set up16steps< Setup Time16seconds< Low Sound15dBA< Minimize pinch points15Count< 3 18 Total materials cost15$< 4, Mount stanchion configuration7BinaryYes 20 Mount yoke configuration7BinaryYes 21 Mount trunnion configuration7BinaryYes 22 Machine footprint5in 2 < 34X48

Engineering Requirement Pareto

House of Quality Engineering Metrics Customer Requirements Customer Weights Displacement of luminaire Vibration of luminaire Duration of vibration test Low sound Machine won't operate if moving parts are exposed Completely stop machine with Emergency Stop Minimize pinch points Minimize number of operators Voltage of motor Mount pendant configuration Mount stanchion configuration Mount yoke configuration Mount trunnion configuration Visually display settings and status of test Operation documentation Steps required for Set-up Isolate motor from oil spills Maintenance documentation Max weight of mounted luminaire Total materials cost Time to Set up Machine footprint Adherance to UL844 testing standard5555 Apparatus is safe Motor must be compatible with available voltage Ability to test multiple configurations Easy to use Easy to maintain Visually display test information/feedback to operator Ability to test a range of luminaire weights Cost under $ Long service life Similar dimensions to existing machine1 5 Technical Targets (Specifications) 1/32 in cycles/min 35 hours < 85 dBA yes < 10 seconds < 3 ≤ 2 < 240 V AC Yes 80% via survey (easy to follow) < 10 steps Yes 80% via survey (easy to follow) > 150 lbs < $4000 < 120 seconds < 34X48 in 2 Raw score Relative Weight 11% 2%4% 2%3%4%6%1% 3%5%3%7% 3%2%3%1%

Project Timeline

Next Phase Schedule

Team Norms and Values Behavior: Act professionally Don’t be condescending No yelling Keep an open mind Take responsibility Balance of work loads: Communicate Action items list Strengths: Take preferences into account Help other members learn Communication: Google groups Weekly meetings Urgent: text/call Decisions: Consider/consult expert No important decisions made alone Final decisions: consensus Conflict: One-on-one Take it to the group Take it to Advisor