1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.

Slides:



Advertisements
Similar presentations
PC Encryption installation progress/password screen Includes comments from: Encryption team Sarah Deane Tony Stieber Selected people who took part in the.
Advertisements

Usually the next step is to run the Cognitive Tests. Click on “Run Cognitive Tests” button to start testing. All of the tests begin with you giving a brief.
How To Register on HROCMMS. Suggestion for this manual may be sent at following s : 1. 2.
Copyright © 2005 Rockwell Automation, Inc. All rights reserved. 1 Micro Logix 1100 RSLogix 500 LAB#2 Timing, Counting & Comparing.
User Training. Step 1 Press Ctrl-I or choose File > Login, this will open the Login window. Figure 1-1 shows the Login window. Figure 1-1 Login Window.
LogTag Training January 2015
Ignore errors in this “Server” window Is there a popup window about a memory error? If so, restart monitoring Can you see in this window the program running.
Multi-DNC Data Collection/Monitoring
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
USER GUIDE PRODUCTION MODE VERSION (VERSION February 2013) 1.
How to use the Student / Temporary Employee Online Time Sheet Q: When will online time sheets be used? A: Go live is September 16, Online time sheets.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
1 Burn-in Viewer User’s Guide Version 2.0 February 17, 2005 LukasTomasek
2008 Physiological Measurements Focusing on measurements that assess the function of the major body systems 1.
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
Logging into ITAMS as an Exempt Employee To Login to ITAMS for the first time: Open your web browser. Click File, Open, and type the following address:
USC’s Internet-based Time and Attendance Management System.
Using ITAMS as a Supervisor or ITAMS Approver Login to ITAMS as usual, at: Enter your User Identification Number (Same as your.
Networking All talk - Selective listen Network up to 15 active nodes + 17 passive nodes Nexus/Discovery panels, network repeaters, R3 19” racks, Alarm.
StressChill App Click the StressChill icon (shown to the right) to open the app. If you do not see this on the desktop, you will find it in the pull up.
Downloading and Installing PAF Insight PAF Insight can be easily downloaded Or can be installed from a CD A license is needed t0 activate the program.
1 BRIDGEPAD (BP) SYSTEM TRAINING Adapted for ScoreBridge Users By John de Ridder PSBC Revised 2 November 2009.
Time and Attendance System for Classified Service Employees.
Basic Navigation in SAP For the Windows Graphical User Interface (GUI) Click your mouse anywhere or select “Page Down” to scroll through the pages.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Basic Administration.  Familiarize support staff with basic DSX administrative tasks  Provide expedited service to customers  Minimize the involvement.
UNCLASSIFIED / FOUO Introducing the National Guard Performance Appraisal Application (PAA) This briefing is UNCLASSIFIED.
4 May I/O Control. 4 May What is I/O Control? A Doors feature that allows you to program input events to drive output responses – for example:
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
PubMed/History, Advanced Search and Review (module 4.3)
Setting Up Alerts and Dashboard Links. When you first start using the Active Orders system, you will need to establish the settings for two types.
Time and Attendance System for Classified Service Employees 1.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
Working with the VB IDE. Running a Program u Clicking the”start” tool begins the program u The “break” tool pauses a program in mid-execution u The “end”
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Asttraining.com Scan Procedures for Ford EEC-V OBD II Systems.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
1 Getting Started Exercise Part 1. 2 Profiles related to the exercise When starting use archive profile: GettingStarted_Start.zip The fully completed.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Hatrak Scheduler UsOn Line Demo HATRAK SCHEDLER.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Chapter 3 Device Monitor Screen Otasuke GP-EX! Chapter 3 Device Monitor Screen Chapter 3 Device Monitor Screen.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Integrated ISO ILL for staff users Borrowing requests – part two Yoel Kortick 2007.
Redundant Bricks Configuration Example Lucent Security Products Configuration Example Series.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Chrome River Navigation Guide
K. Grogg, M. Weinberg, M. Grothe
Shifter Instructions regarding the ZD, Dan Peterson
How to Create and Start a Test Session
Digital Chart Recorder Operation
CSC Turn ON Status Report by Fred B.
Pierluigi Paolucci & Giovanni Polese
Two methods to observe tutorial
New Features in Security Management
19-April-05 CSC ME1/1 Meeting
CSC Shift Training and Operation + B904 Status
Presentation transcript:

1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single Multiple Pcrate – Any Single Multiple Glossary Instructions Communication Loss Locking OFF Acknowledged

2 1 st Priority  HV Primaries  LV Maratons

3 29-Sept-2009Operation of CSC DCS3  If a HV Primary Supply is in error, this is what the system will look like.  Call the field manager at  Any run in progress will continue but there will be no data from these chambers

4 Low Voltage PrimaryLost 29-Sept-2009Operation of CSC DCS4  When a Peripheral Crate Loses LV, check the Low Voltage Primaries (Labeled Maratons)  If a Maraton goes into error, double click the Maraton in error and then in the top drop- down menu select “Off”  Call the Field Manager (165509) after turning off the Maraton  This alarm will probably stop any run with a FED ERROR

5 Maraton LV  This panel shows the status for each of the Maraton LV supplies  Each Maraton supplies LV to either Two Trigger Sectors, TS, of chambers (2x9) plus a pcrate (VME)  4x ~8.0V  1x ~5.5V + 1x ~6.5V Three pcrates (VME) (3TS)  Shown!  3x ~5.5V & 3x ~7.0V  note the voltages and currents for each output channel

6 Maraton  The control panel for a Maraton is shown  Do NOT turn on a tripped or OFF Maraton! – Expert Operation ONLY!

7 2 nd Priority  Chambers or Pcrates  HV  LV  Temperature

8 2 nd  CSC Errors  HV  LV  Temperature

9 29-Sept-2009Operation of CSC DCS9 CSC Status  Move cursor over Chamber to read LV, HV, and Temperature  You must double click the chamber to perform control actions upon it CSC HV ALARM CSC LV ALARM CSC temp ALARM

10 CSC Status  Move cursor over CSC to view read back values  NO control  Displays HV LV Temperature  NOTE:  When entire display not in Generl mode this panel displays only information for the current mode

11 High Voltage Trip (Diagnosis) 29-Sept-2009Operation of CSC DCS11  If a single chamber goes into error, and the high voltage is in error, the HV in the chamber has tripped.  Double click on the chamber, then double click on box ending in “_HV” then go to the next slide

12 CSC Status  Double Click on CSC to get panel  Double Click on ‘Sub- System name tab to get >>> ( see next slide )

13 29-Sept-2009Operation of CSC DCS13  Press FORCE ON  If a chamber trips three or more times in a shift, call the CSC Expert (161972) HV Trip (Action)

14 HV Trip (Action) 29-Sept-2009Operation of CSC DCS14  Our inner ring of chambers on Station 1 have a different interface  If you see this screen instead, select the drop down menu of the sub-system in error and select Off  After 10 minutes in the same menu select On

15 Dubna HV  Panel for control of HV Use this panel when following procedures for Dubna HV  Panel shows time history of voltage Use this panel to watch ramp up of individual chamber HV

16 LV for Single Chamber Out 29-Sept-2009Operation of CSC DCS16  If Low Voltage currents or voltages are zero for a single chamber, the chamber has lost its firmware  This can be ignored when not running  Otherwise call the CSC Expert (161972)

17 CSC Temperature Alarm

18 2 nd  Pcrate  LV  Temperature

19 Peripheral Crate Overheats (Diagnosis) 29-Sept-2009Operation of CSC DCS19  If a Peripheral Crate is in error while it’s Chambers are fine, mouseover the Peripheral Crate  Check the DMB temperatures to see if they are too hot  If so, double click on the Peripheral Crate in error and proceed to the next slide

20 29-Sept-2009Operation of CSC DCS20 Peripheral Crate Loses LV (Action)  Single Click the TO SWITCH OFF button  Call the Field Manager at

21 Peripheral Crate Loses LV (Diagnosis) 29-Sept-2009Operation of CSC DCS21  If a Peripheral Crate and it’s corresponding Chambers are in error, the Peripheral Crate has lost Low Voltage going to it.  Check if LV Primary Supplies are also in error  Double click on the Peripheral Crate in error and proceed to the next slide

22 29-Sept-2009Operation of CSC DCS22 Peripheral Crate Overheats(Action)  Single Click the TO SWITCH OFF button  Call the Field Manager at

23 3 rd Priority  CSC_GAS  CSC_COOLONG

24 Gas in Error 29-Sept-2009Operation of CSC DCS24  CSCs are designed to run for 24 hours without fresh gas while beam is off.  If gas goes out during the Morning shift or Afternoon shift, wait an hour and then call the CSC Field Manager (165509) if gas is still in error.  If gas goes out during the Owl shift, inform the morning shifters of the problem and have them call (165509) at 8 am if the gas is still in error. Back

25 Cooling in Error 29-Sept-2009Operation of CSC DCS25  Our Cooling is only indicative as to whether it is safe to turn on.  If Cooling is in error while the system is off and wants to be turned on, call the CSC Field Manager (165509) before turning on.  If the Cooling goes into error while CSC system is on, monitor chamber and rack temperatures.  If 36 or more chambers are red (T > 32 °C), turn off entire system and call We would like to request that an SMS be sent to in the event of a cooling error. Currently it only sends to A. Lanaro Back

26 Standby

27 29-Sept-2009Operation of CSC DCS27 Standby State  Standby indicates that the high voltage has been lowered below data taking levels  This is currently also our Safe state  Here only one chamber is shown in standby state, standby will mostly be for all chambers or none Back

28 CommunicationLost 29-Sept-2009Operation of CSC DCS28  When a chamber has a question mark on it, that means it has lost communication with DCS  Mousing over will reveal a No Communication message  If a chamber is out of communication for over an hour, call the CSC Expert (161972) Back

29  HV control and detail panel  From this panel follow procedures to correct a UF HV trip

30 PCrate LV  pcrate LV Status Move cursor over pcrate Shows the LV at CRB LV delivered to different boards in pcrate

31 PCrate LV  Double click to get >>> PCB LV detail and control panel  Individual OFF|ON control each group or board or voltage VCC – Crate Controller Shown  Button in RED switches OFF/ON entire crate

32 Acknowledged Alarms  The ! Symbol indicates that there is an ACKNOWLEDGED alarm on this device Back

33 Lock Out  1 st Turn Device OFF (shown after turn off)  2 nd click on check mark  3 rd click on “Disable”  Record in ELOG Back

34 Other Error / Unknown State 29-Sept-2009Operation of CSC DCS34 ?  Please double check to see if it looks similar to one of the previous problems and if so please perform those actions.  No action described in this manual will damage our system  If there is no procedure or the situation is unique please call the CSC Field Manager (165509).

35 Instructions

36 Nomenclature

37 Terminology 29-Sept-2009Operation of CSC DCS37  Each disc is called a Station  Trapezoids the wheel are composed of represent Chambers  Squares outside wheel represent Peripheral Crates  Each Peripheral Crate controls a number of Chambers  LV = Low Voltage  HV = High Voltage Peripheral Crate Chamber Back

38 Backup Slides

39 Value Monitor  There are 4 mode options for the value monitor display Max Temperature Average Temperature Max HV Average HV  Max Maximum value over the last N? reads  Average Average value over the last N? reads

40 29-Sept-2009Operation of CSC DCS40 Temp/HV Monitor  There are 4 mode options for the value monitor display Max Temperature Average Temperature Max HV Average HV  In continuous running mode keep monitor on Average Temperature  If 36 or more chambers are red (T > 32 °C), turn off entire system and call Field Manager (165509)

41 Value Monitor  The Value Monitor shows the values in color for all chambers  Moving the cursor over a chamber brings up the summary panel for that chamber

42  This panel operates exactly as the ‘old’ version  Note that the panel is shown as locked When this happens follow the procedures to get control!  It is opened by double clicking on the Sub-Systems top button ‘Old’ Top Panel

43 How to change HV value for ME1/1  On Main DCS GUI double click CSC_HV. A smaller icon appears  In this icon change the value (3000→2900) in ME 1/1 HV (Dubna HV) and push “Enter” on the keyboard.  The color of the ME1/1 CSCs will change to blue like it is “OFF”.  1.  2.  One can see the real values moving cursor to the desirable chamber.

44 ERRORS HERE - RED  Do this …..

45 ERRORS HERE - RED  Do this …..

46 ERRORS HERE - RED  CSC_GAS NOTE: These values come from cDCS and are acted on there Notify cDCS Shifter Notify CSC CEO link  CSC_COOLING NOTE: These values come from cDCS and are acted on there Link

47 Possible Errors 29-Sept-2009Operation of CSC DCS47

29-Sept-2009Operation of CSC DCS48 Top Level of CSC DCS User Interface Low Voltage Supplies High Voltage Supplies Overall State Temperature Monitor Chamber View

49 Top Level of CSC DCS UI  Top  End view of CSC Stations  Bottom  Subsystems  High Voltage Primary  Maraton  Value Monitor

50 Change Mode  Change Mode Sets mode for Stations view  General State Shows all values  High Voltage – only  Low Voltage – only  Temperature – only

51 example  In this example CSC ME-1/1/05 (Dubna) is in Standby  Notice that the general display reflects this for the chamber  The detail panel reflects this  The Sub-Systems panel also reflects this

52 High or Low Voltage in Error 29-Sept-2009Operation of CSC DCS52  If either of these subsystems are in error a Chamber or Peripheral Crate will often also be in error.  The following slides are all examples of what to look for when High or Low Voltage go into error.

53 HV Primary - UF  This panel shows the Primary HV setting  This panel is used to control the HV value during beam operations