HIGH SPEED RAIL ASSESSMENT NORGE

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

Cross-Acceptance: UNIFE expectations Alice Polo Safety and Certification Manager.
Establishing a standardised methodology to measure JEREMIE impact Álvaro Navarro Innovation and Development Agency of Andalusia, Spain Brussels, 20 th.
STATE OF TRANSPORT CLIMATE CHANGE ADAPTATION ACTIONS IN EEA COUNTRIES, RECENT EXPERIENCES Natalia Sobrino (TRANSyT- UPM) ETC/CCA Task Adaptation.
. Report from the 5thmeeting of the Safety & Security Committee Report from the 5th meeting of the Safety & Security Committee Paris, April 29 th 2010.
1 Risk-based Evaluations and Trends of Railway Casualty Accidents on the National Railway of South Korea International Railway Safety Conference 2007.
Vancouver, October 08th 2013 DB Systemtechnik GmbH Marc Geisler The challenge of transforming a rule-based system into a risk-based culture on an example.
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
Dr. Lajos CSEPI (State Secretary for Transport ) Hungary CLIMATE CHANGE: ENERGY AND TRANSPORT Issues, challenges and strategies in Hungary.
Railway Safety Plan and Its Status in Korea
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Vectus Ltd Copyright Page 1 Safety Process in Vectus ’ PRT Project Inge Alme: Safety Manager Jörgen Gustafsson: CTO.
Climate & Transportation R&D program conducted by the Norwegian Public Roads Administration , cca 2,5 mill € Update design, construction, operation.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
The European Railway Agency in development
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
What is Business Analysis Planning & Monitoring?
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Twinning project, activity 4, Maintenance assessment Tuesday 4 th October 2005, session 3 Output management: essential Instruments within ProRail By Jan.
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
Title: Rail Safety Survey Presenter’s Name: DAISY P. JACOBO Economy: Philippines 33rd APEC Transportation Working Group Tokyo, Japan October
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
The Preparatory Phase Proposal a first draft to be discussed.
Assurance Case Approach TECNALIA Inspiring Business Novara November, 2013 TRIAL WS.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Technologická platforma "Interoperabilita železniční infrastruktury" a zaměření její činnosti v dalším období Praha, Jozef Fazik, Chargé de Mission.
1 Noise and rail What about Belgium ? Martine Serbruyns Federal Public Service Mobility and Transport Brussels - 28 april 2014.
#UIC ERTMS World Conference 1. – 3. April 2014, Istanbul UIC Rail System Department UIC ERTMS World Conference Dirk Schattschneider UIC Frequency Manager.
Adaptation Planning at ODOT ODOT’s Climate Change Adaptation Strategy Report and Future Planning Liz Hormann Sustainability Planner Oregon Global Warming.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Climate change in the European Commission’s Impact Assessment. An evaluation of selected impact assessment reports Valentine van Gameren, Centre d’Etudes.
KIT – University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association INSTITUTE FOR ECONOMIC POLICY RESEARCH (IWW),
Telecom and Informatics Odd Nordland, SINTEF Frank Renpenning, SIEMENS 1 PSAM6, San Juan, Puerto Rico, USA - June 2002 RISK ACCEPTABILITY CRITERIA FOR.
Guidelines of Good Practice on customer cost surveys as an input for infrastructure development and its regulation Riccardo Vailati Co-chair CEER/ERGEG.
1 Review and Assessment of the Korea Rail ’ s Safety Performance using Risk Assessment Models International Railway Safety Conference 2009, Sweden Chan-Woo.
INTERNATIONAL EDUCATIONAL CONFERENCE „LET‘S SAVE LIVES“ Tallinn, Estonia, March 15 th, 2011 Martina Pavlíková ŽSR – The Railways of the Slovak Republic.
Capacity and Service to Road Users Task 05: To optimise the capacity of the road network Mike Wilson, Bristol 27 January 2006.
European Railway Safety Strategy EIM Safety Group (PhGALLEY and J-Å HALLDEN) 29 september 2009.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
H\projects\controls\ekdilosi\tecnoman\ ppt Prospects of drafting Prospects of drafting Black Sea Ring Highway Black Sea Ring Highway Master Plan.
Over View of CENELC Standards for Signalling Applications
Transport Rail Safety & the Railway Safety Directive Frank Jost Single European Rail Area EU Commission 1.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October/December2008.
UIC Safety Unit activities – UNECE Railway Safety Workshop Geneva, 24 November 2015 Peter Gerhardt, Manager of UIC Safety Unit.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October 08/January 09.
1 Federal Office of Transport, Hannes Meuli, Roman Slovák Workshop on Rail Safety: Trends and Challenges, UNECE, Geneva, Schweizerische Eidgenossenschaft.
Risk and Safety in the Transport Sector (RISIT) - a research programme covering road-, sea-, air- and the railway sector Finn H. Amundsen, Head of programme.
Summary and Wrap-up Discussion 8 July 2015
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
Professional railway standardization International Railway Standard (IRS) vs. Industrial railway standardization 19 th February 2016 Dr. Marc Antoni FIRSE.
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
INTERNATIONAL TRANSPORT FORUM WORKSHOP ON MEASURING INVESTMENT IN TRANSPORT INFRASTRUCTURE UNECE WP6 WORKING PARTY ON TRANSPORT STATISTICS May 2012.
1 Address: UIC Safety Database (SDB) System and Results.
N° 1 Possible co-operation between rail and buses in the area of Telematics Applications for Passengers Presented by European Railway Agency (ERA) th.
BSR Risk Management Capability Assessment Methodology
Public Conference December
Uniper Energy Services
AusRAIL 2006: Railway Safety
Green and Sustainable Remediation (GSR) Overview
European Rail Infrastructure Managers
The move from a rule based system to a risk based system Challenges for the competent authorities October 2017.
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Track circuit reliability assessment for preventing railway accidents
Workshop on freight train derailments - Introduction -
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
Presentation transcript:

HIGH SPEED RAIL ASSESSMENT NORGE Pöyry transparent logo flattened with the pattern image Technical and Safety Analysis December 16th, 2010 Hermann Gitzelmann, Pöyry Infra GmbH

Technical and Safety Analysis – HSR Assessment Norge PÖYRY and partners will perform this task for JERNBANEVERKET PÖYRY is a global consulting and engineering company dedicated to balanced sustainability 7’000 experts in about 50 countries More than 30 years of experience in High-Speed Rail Rolling stock & risk assessment partner is INTERFLEET Technology with consultants from Norway, Sweden, UK and Germany Norwegian Engineering partner is SWECO KIT Karlsruhe Institute of Technology Department of Railway Systems will contribute with their R&D experience Together our team offers international and Norwegian know-how both for High- Speed Rail and railway as a system 3-column text and 2-column image

Technical and Safety Analysis - Content of Task Technical Solutions Standards for high-speed railways Adverse Weather and Climatic conditions Technical track solutions Infrastructure concepts / tilting train alignment Rolling stock Risk Assessment Safety and Security High Speed Rail Assessment Norge September 2010

Technical and Safety Analysis – Subject 1: Technical Solutions Standards EN TSI UIC NRI Rolling stock Infra concepts Alignment Weather Conditions Tilting train Technical track solutions Lars High Speed Rail Assessment Norge September 2010

Subject 1 Technical Solutions – HSR Standards Comparison and Evaluation of Technical Specifications for the Interoperability (TSI) and Norwegian Standards for high-speed railways Infrastructure Technical Equipment Rolling Stock Operation and Maintenance Analysis of gaps between European and Norwegian norms and standards Target:  Propose solutions or strategies to close the identified gaps in the Norwegian standards in comparison to the European norms and standards for HSR traffic High Speed Rail Assessment Norge September 2010

Subject 1 Technical Solutions - Adverse Weather and Climatic conditions Evaluation and Description climatic and weather conditions in Norway Topographic issues and landslide Consequences for track and Rolling stock Evaluation of early warning systems Target:  Presentation of solutions and common procedures in respect to Norwegian weather and climatic conditions High Speed Rail Assessment Norge September 2010

Subject 1 Technical Solutions - Technical track solutions Evaluation and Description for the different track construction types like ballast sleeper tracks and slab track Overview for different technical solutions influencing the track system in aspect to: Specific Norwegian environment Investment and operation costs Operational and service parameters Functional and technical parameters Target:  Presentation of track solutions and parameters as basis for decision on an optimal HSR track system under Norwegian requirements High Speed Rail Assessment Norge September 2010

Subject 1 Technical Solutions - Infrastructure concepts / tilting train alignment Feasibility study for high speed tilting train system Main alignment parameters Interaction between alignment and variants (pure HSR / HSR with regional traffic / mixed traffic) Effects of alignment parameters to structures, safety and control equipment Conclusion and recommendation to alignment parameters for non-tilting and tilting train systems Case study of HSR experiences with tilting train systems in other countries Interviews with operators and suppliers Conclusions from the gathered information: Importance of tilting trains in the development of railway networks Infrastructure upgrading vs. use of tilting trains Reliability of tilting trains Target:  Presentation of solutions and parameters as basis for decision on an optimal HSR train system under Norwegian requirements High Speed Rail Assessment Norge September 2010

Subject 1 Technical Solutions - Rolling stock Evaluation of critical parameters for the train concept Define technical requirements and assumptions related to the rolling stock to be used for high-speed railways in Norway Listing and description of existing/future train concepts Target:  Propose the right requirements for rolling stock and an evaluation model for different train concepts High Speed Rail Assessment Norge September 2010

Subject 2 Risk Assessment and Analysis Safety Process, Overview Objectives of the risk-process: Definition of agreed risk tolerability criteria Identification of all relevant system-hazards Analysis of consequences Derivation of Tolerable Hazard Rates (THR) at system-level Lars High Speed Rail Assessment Norge September 2010

Subject 2: RISK ASSESSMENT AND -ANALYSIS Definition of risk acceptance criteria ERA (European Railway Agency) approach according to the regulation No. 352/2009 of the commission of the European community Risk Level Severity Level Frequency of hazardous event Calibration of risk matrix Safety barrier Propose the appliance of an explicit risk estimation and harmonized Risk Acceptance Criteria for Technical Systems (RAC-TS) High Speed Rail Assessment Norge September 2010

Subject 2: RISK ASSESSMENT AND -ANALYSIS Hazard Identification Process System boundary Interfaces System functions Scenarios Hazard List High Speed Rail Assessment Norge September 2010

Subject 2: RISK ASSESSMENT AND -ANALYSIS Hazard Identification / Top Events resp. Accidents: Derailment Collision train-train Collision train object Fire Passenger injured at platform Person injured at level crossing Person injured at track side High Speed Rail Assessment Norge September 2010

Subject 2 Risk Assessment and Analysis Derivation of Tolerable Hazard Rates at the level of system-functions After the identification of all hazards and the correlation of severity level the definition of tolerable hazard rates can apply using RAC-TS. The result of this phase is the complete list of all hazards and their related tolerable hazard rates. List of Hazards and related tolerable Hazard rates (THR) List of Hazards and related qualitative severity High Speed Rail Assessment Norge September 2010

Subject 3 Safety and security analysis Future risk level of public transport with present means of transport vs. future HSR transport 1. Determine the current transport safety level and development 2. Estimate future distributions between types of transport means 3. Estimate the future passenger safety including high-speed operations 4. Present changes in risk and consequences of the change Uncertainty analysis is fundamental to the decision-making process => guidance on what safety factors to improve in order to increase the difference = benefits in future transportation systems Lars High Speed Rail Assessment Norge September 2010

Subject 3 Safety and security analysis CURRENT SAFETY SITUATION Railway transport Road transport Air transport Boat transport Assessment of total safety METHODOLOGY Model description Scenarios Input data Uncertainty assessment RESULTS Change in transport safety of transport modes Total change in transport safety for studied scenarios Uncertainty analysis Lars High Speed Rail Assessment Norge September 2010

Interfleet Technology Karin Johansson Telefon +47 22340500 Contact: Pöyry Infra GmbH Hermann Gitzelmann Telefon +49 7621 9300 - 0 Hermann.gitzelmann@poyry.com Interfleet Technology Karin Johansson Telefon +47 22340500 Karin.johansson@interfleet.no End slide High Speed Rail Assessment Norge September 2010