Technical Standards for PACE Matt Golden, Efficiency.org Dub Taylor, Texas State Energy Conservation Office.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

New Paradigms for Measuring Savings
Financing Energy Efficiency Projects: Credit Enhancements for Commercial Finance September 26, 2011 Presented by: Dan Clarkson Energy Efficiency Finance.
FLORIDA PACE FUNDING AGENCY Delivered by SAIC. FloridaPACE.gov 2 FLORIDA PACE FUNDING AGENCY Delivered by SAIC What is PACE? –Property Assessed Clean.
Residential Mortgage Loans
Chapter 1 The Nature of Real Estate and Real Estate Markets Real Estate FIN 331.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
Energy Efficiency Financing: Which Financial Instruments Can Best Leverage Energy Efficiency Financing Dr. Xiaodong Wang Senior Energy Specialist EASIN,
Chapter 1 The Real Estate Investment Decision Real Estate - Physical Land and Attached Structures Real Property - Legal Interest in land and structures.
Overview of Property Assessed Clean Energy (PACE) Program San Antonio Office of Environmental Policy December 16, 2009.
ESTHER TOPOROVSKY Program Director Green Communities.
Green Real Estate/ Energy Efficiency Real Estate Webinar Series.
McGraw-Hill /Irwin Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Sixteen Securities Firms and Investment Banks.
Mark Zimring Lawrence Berkeley National Laboratory (LBNL) December 7, 2010 Financing Energy Efficiency Upgrades in the Residential Market.
Finding the Right Financing Mix: The Capital Structure Decision
© 2009 Dwight Jaffee and Nancy Wallace, Slide 1 Fisher Center for Real Estate at Haas School Market Mechanisms for Financing Green Real Estate Investments.
Introduction to Financial Statements and Other Financial Reporting Topics COPYRIGHT ©2007 Thomson South-Western, a part of the Thomson Corporation. Thomson,
2 Disclaimer This presentation is for discussion purposes only. Second Nature is currently exploring the viability of formally establishing a Climate.
Promoting Energy Efficiency In Buildings in Developing countries.
“Real Estate Principles for the New Economy”: Norman G. Miller and David M. Geltner Chapter 20 Commercial Real Estate Finance.
Tax Credits & Financing for Energy Efficiency & Renewable Energy Projects Presented by: The Morgantown Green Team.
 Company Name : Nature Outdoor Recreation and Resort (NATOUR)  Company Address : Hutan Simpan Ayer Hitam, Puchong, Selangor  Type of Company.
Chapter 1 The Nature of Real Estate and Real Estate Markets Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Energy and Economy Transition California’s energy system to a highly efficient, renewables-based system and electrify transportation.
Analyzing Year End Financial Reports to Evaluate the Business Objectives:  The student will describe five key factors of year end financial analysis 
Presented By: Matt Bell Partner, Viridian. Buildings and the Environment Buildings account for 36% of greenhouse gas emissions Buildings account for 72%
Picking up the PACE Team Adhoc Proposal. Introduction Scaling from city to state level Promoting high enrollment Operating with efficiency Combating financial.
State and Local Governments Leveraging ENERGY STAR in Energy Policy.
Part 4 PowerPoint Presentation by Charlie Cook Copyright © 2003 South-Western College Publishing. All rights reserved. All rights reserved. Finding Sources.
Projects financing and implementation experience Dr.sc.ing. Ilze Purina Chairperson of the Board Latvian Environmental Investment Fund ____________________________.
PACE APPLICATION PROCESS HOW TO PUT TOGETHER A PACE PROJECT.
Environmental Defense Fund’s Investor Confidence Project New Jersey Clean Energy Program Energy Efficiency Committee May 16 th 2014.
EE/RE in the 83 rd Texas Legislature Dub Taylor Director, SECO.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
GROUP MEMBERS SIDRA ALEEM AILIA BATOOL GHAZI REHMAN ZAID HASSAN.
PACE FINANCING UPGRADE YOUR BUILDING AND IMPROVE YOUR BOTTOM LINE.
©CourseCollege.com 1 16 Long Term Debt Long term debt - liabilities with due dates greater than one year. Learning Objectives 1.Explain accounting for.
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
Using Financial Information and Accounting Chapter 19.
Electricity Transportation Heating Allocation of 6.2 GtC/yr Electricity: 40% Fuels used directly: 60% 60% of Global Carbon Reduction Needed in 5-10 yrs.
Order Order Sale Payment Sent Cash Placed Received Received Accounts Collection Accounts Collection Time ==> Time ==> Accounts Disbursement Accounts Disbursement.
Using Financial Information and Accounting Chapter 14.
Energy Efficiency Financing October 15, About Virginia Community Capital  Founded in 2006, then Governor Mark Warner privatized $15M state loan.
PACE 2.0 Restructuring PACE programs Team Crown Joules.
Shadow Banking.
David M. Robins Thompson & Knight, LLP Houston, Texas PACE Legislation, Implementation and Financing 1.
Keeping PACE in Texas Texas Housing Conference July 28-30, 2014 Hilton Hotel Austin, TX.
CH 2.  This chapter includes:  The Function of banks and services.  Banks targets.  Organizational forms for banks.  Administrative and organizational.
PREPARE THE FOUR FINANCIAL STATEMENTS 1. INCOME STATEMENT 2. RETAINED EARNINGS STATEMENT 3. BALANCE SHEET 4. CASH FLOW STATEMENT.
“IMPORTANCE OF SOLAR THERMAL TRAINING SYSTEMS FOR A HOUSING ENTERPRISE” PRESENTATION TO THE SOLTRAIN CONFERENCE, MIDRAND, SOUTH AFRICA 11 February 2016.
Non-Bank Financial Institutions Finance Companies, Insurance Companies, Pension Funds, Mutual Funds, and Real Estate Investment Trusts Chapter 5 Dr. BALAMURUGAN.
ENERGY EFFICIENCY FINANCING FOR LOW AND MODERATE-INCOME SINGLE-FAMILY HOMES May 24, 2016 Chris Kramer, Energy Futures Group.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Module 1: Basics of Financial Statements. Balance Sheet Equation Assets: companies own cash, receivables, inventories, real estate, equipment, securities,
Creating Economy With Water and Energy Retrofits to Commercial and Industrial Property Charlene Heydinger
Role of Financial Markets and Institutions
Session 18 (R) Medium Scale PV Projects (Commercial, Industrial, Community) March 21, 2016.
Residential Energy Efficiency Policy for Existing Homes Kara Saul-Rinaldi Vice President of Policy & Government Affairs, Home Performance Coalition Government.
Overall Objectives of NAMA
SEIA Finance Initiative
The EEFIG Underwriting Toolkit
IREM® Fall Conference San diego, Ca 10/21/2016.
Sustainability Business Case with FUNDING assistance
Keeping PACE on The Texas Border
Ratio Analysis - Gearing
Environmental Upgrade Agreements
Buy to Let Valuations James Ginley – Technical Director
Chris Kramer, Energy Futures Group
SESSION IV: INVESTMENT AND FINANCING OPPORTUNITIES
Proposed by the District of Columbia May 2010 presentation to WCOG
Presentation transcript:

Technical Standards for PACE Matt Golden, Efficiency.org Dub Taylor, Texas State Energy Conservation Office

Energy Efficiency Project Barriers

Breaking Down Barriers to EE Finance PerformanceRisk CreditRiskAssetRisk On-Bill Repayment Commercial PACE Green Banks Benchmarking Asset Labeling Disclosure Project Finance Long-term financing of projects based upon the projected cash flows of the project rather than the balance sheets of its sponsors.

Investor Ready Energy Efficiency™ IREE is the” logo in the lobby”, like LEED but for a building retrofit project.

Near-Term: Increase Deal-Flow Increase Confidence in Savings Reduce Transaction Costs Streamline Origination Process Standardized Performance Data Project Finance Underwriting Enable Portfolios and Securitization Long-Term: Market Transformation

PACE Technical Standards – why? PACE is least aligned with performance risk – Owner accepts liability (lien) without defined, offsetting benefit Owners don’t believe savings are real – Savings to Investment Ratio (SIR) – What about non-energy benefits - tenant retention, etc…? Keeping transaction costs low – where is balance point?

Basis for Technical Standards TEXAS LOCAL GOVERNMENT CODE Sec REVIEW REQUIRED. (a) A program established under this chapter must require for each proposed qualified project: (1) a review of water or energy baseline conditions and the projected water or energy savings to establish the projected water or energy savings; and (2) a verification that a proposed qualified improvement meets the requirements of a qualified project. (a-1) A verification provided as required under Subsection (a)(2) conclusively establishes that the improvement is a qualified improvement and the project is a qualified project. Qualified improvement A permanent improvement fixed to real property and intended to decrease water or energy consumption or demand, including a product, device, or interacting group of products or devices on the customer's side of the meter that uses energy technology to generate electricity, provide thermal energy, or regulate temperature. Qualified project The installation or modification of a qualified improvement. Real property Privately owned commercial or industrial real property or residential real property with five or more dwelling units.

Basis for Technical Standards TEXAS LOCAL GOVERNMENT CODE (cont.) Sec REVIEW REQUIRED. (b) After a qualified project is completed, the local government shall require written verification that the qualified project was properly completed and is operating as intended. (c) A baseline water or energy review or verification review under this section must be conducted by an independent third party. Pace in a Box Toolkit - Technical Standards

Questions/Discussion