Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review 28-29 April 2016 April 28-29,

Slides:



Advertisements
Similar presentations
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
Advertisements

LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
Mechanical Design & Analysis Igor Novitski. Outlines Electromagnetic Forces in the Magnet Goals of Finite Element Analysis Mechanical Concept Description.
Christian Löffler Collaring to cold mass finishing 2 Outline Available tooling and operational status CMM of 5.5m coils Instrumentation Pairing.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
1 QXF heater parameters G. Chlachidze, M. Marchevsky March 13, 2014.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
LARP Collaboration Meeting Racetrack Coil Fabrication
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Program overview: motivation, target parameters, timeline A.V. Zlobin 15 T dipole design review 28 April 2016.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
SQXF Mirror QXFSM1 Strain Gauges
11T Dipole – Single Aperture 2m Model
ERMC/RMM activities May 2017
FRESCA2 Update on the dipole design and new calculations
Glyn Kirby Magnet AssemblyTechniques.
MBHSP02 test STATUS and first results
the MDP High Field Dipole Demonstrator
Analytical Cost Model (16 T dipole)
Analytical Cost Model (16 T dipole)
MQXF updates P. Ferracin October 9th, 2014.
SNS PPU Cryomodule Space Frame
Presentation transcript:

Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29, 2016, FNAL Igor Novitski | 15T Dipole Design Review1

April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review2 1.Cold mass design description 2.Drawing tree 3.Magnet assembly steps and tooling 4.Procurement status 5.Assembly tooling status 6.Conclusions Outline

Cold Mass Design Description April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review3 1 – 4-layer Nb 3 Sn coil 2 –coil-yoke stainless steel spacer 3 – iron yoke laminations 4 – alignment key 5 – aluminum I-clamp 6 – iron filler 7 – stainless steel welded skin 8 – stainless steel axial rod 9 – stainless steel pusher plate 10 – bullet 11 – stainless steel end plate 12 – stainless steel ring

Drawing Tree April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review4 CoilsTooling Cold MassTooling Coil assembly fixture Welding fixture Clamping fixture Lifting fixture

Magnet Assembly Steps Coil instrumentation Coil block assembly, PH and ground insulation placement Yoking Clamping Skin welding Ends loading Leads splicing Final electrical check April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review5

Coil Instrumentation April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review6 Strain gauges, VTs and Heaters

Coil Assembly April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review7 Coil alignment pin LE RE

Coil Ground Insulation and Heaters April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review8 PH design: SS strips 0.025x25mm (LF) and 0.025x32mm (HF) PH position: L4 and in between L2 and 3 PH insulation: single layer 127  m thick Kapton Coil weight=189.4 kg

Coil-Yoke Stainless Steel Spacer April 28-29, 2016, FNALIgor Novitski | 15T Dipole Design Review9 Two 2mm thick stainless steel shells

Coil Block Yoking Igor Novitski | 15T Dipole Design Review10April 28-29, 2016, FNAL Coil block rotated by 90 o Iron laminations with alignment keys lam weight=14.8 kg

Coil Block Yoking Igor Novitski | 15T Dipole Design Review11April 28-29, 2016, FNAL Axial tie rods

Yoke Clamping Igor Novitski | 15T Dipole Design Review12April 28-29, 2016, FNAL Tooling (in design stage) will push all clamp in final position gradually (travel ~5mm) Clamp weight=2.6 kg

After Yoke Clamping Igor Novitski | 15T Dipole Design Review13April 28-29, 2016, FNAL Weight=1546 kg

Shell Welding Preparation Lifting fixtures Igor Novitski | 15T Dipole Design Review14April 28-29, 2016, FNAL Work on a fixture certification in progress Several Iron lams will be modified

Shell Welding Preparation Igor Novitski | 15T Dipole Design Review15April 28-29, 2016, FNAL Stainless steel rings

Shell Welding Preparation Igor Novitski | 15T Dipole Design Review16April 28-29, 2016, FNAL Iron filler and backing strip

Shell Welding Igor Novitski | 15T Dipole Design Review17April 28-29, 2016, FNAL Tooling (in design stage) with welded rods (as in 11T). Hand welded shells

After Shell Welding Igor Novitski | 15T Dipole Design Review18April 28-29, 2016, FNAL

End Loading Preparation Igor Novitski | 15T Dipole Design Review19April 28-29, 2016, FNAL Pusher plate

End Loading Preparation Igor Novitski | 15T Dipole Design Review20April 28-29, 2016, FNAL Pusher plate

End Loading Igor Novitski | 15T Dipole Design Review21April 28-29, 2016, FNAL Return End plate

End Loading Igor Novitski | 15T Dipole Design Review22April 28-29, 2016, FNAL LE end plate

Leads Insulation Igor Novitski | 15T Dipole Design Review23April 28-29, 2016, FNAL Lead insulating spacers

Leads Splicing Igor Novitski | 15T Dipole Design Review24April 28-29, 2016, FNAL Stand-off plate

Leads Splicing Igor Novitski | 15T Dipole Design Review25April 28-29, 2016, FNAL G10 splicing plates

Leads Splicing Igor Novitski | 15T Dipole Design Review26April 28-29, 2016, FNAL G10 cover plate

Magnet Final Design Igor Novitski | 15T Dipole Design Review27April 28-29, 2016, FNAL 1100mm 612mm Weight=2362 kg

Procurement Status Igor Novitski | 15T Dipole Design Review28April 28-29, 2016, FNAL Status: in house; in procurement; in production; in design.

Assembly Tooling Status Coil assembly station – need several (12) new spacers Iron yoke clamping – in design stage Iron yoke lifting – under certification Skin welding - in design stage Igor Novitski | 15T Dipole Design Review29April 28-29, 2016, FNAL

Conclusions A cold mass design is complete All cold mass parts are in procurement Design work is in progress for clamping and welding tooling and will be ready for the model assembly April 28-29, 2016, FNAL Igor Novitski | 15T Dipole Design Review30