NIIF CA Status Update and Self-Audit Results 15 th EUGridPMA meeting 27.01.2009 Nicosia Tamás Máray NIIF Institute.

Slides:



Advertisements
Similar presentations
Usage of PGP in TACAR 19th OGF Meeting Chapel Hill, USA February 1, 2007 Licia Florio Project Development Officer
Advertisements

1 ASGCCA Self-Audit Report APGridPMA Jinny Chien March
CNIC Grid CA/SDG CA Self Audit Kejun (Kevin) Dong Computer Network Information Center (CNIC) Chinese Academy of Sciences APGridPMA F2F.
1st Expert Group Meeting (EGM) on Electronic Trade-ECO Cooperation on Trade Facilitation May 2012, Kish Island, I.R.IRAN.
Host of the 13 th ECRF Annual Conference - Budapest 2010.
DESIGNING A PUBLIC KEY INFRASTRUCTURE
1 REUNA Certificate Authority Juan Carlos Martínez REUNA Chile Rio de Janeiro,27/03/2006, F2F meeting, TAGPMA.
National Institute of Advanced Industrial Science and Technology Auditing, auditing template and experiences on being audited Yoshio Tanaka
NRENs supporting Grids using current Grid technology TERENA NREN-GRID Workshop Amsterdam Milan Sova CESNET.
Chapter 11: Active Directory Certificate Services
CN1276 Server Kemtis Kunanuraksapong MSIS with Distinction MCTS, MCDST, MCP, A+
Online AAI José A. Montenegro GISUM Group Security Information Section University of Malaga Malaga (Spain) Web:
NECTEC-GOC CA APGrid PMA face-to-face meeting. October, Sornthep Vannarat National Electronics and Computer Technology Center, Thailand.
National Institute of Advanced Industrial Science and Technology Self-audit report of AIST GRID CA Yoshio Tanaka Information.
NAREGI CA Updates Kento Aida NAREGI CA/NII Kento Aida, National Institute of Informatics APGrid PMA meeting 04/20/2008.
March 27, 2006TAGPMA - Rio de Janeiro1 Short Lived Credential Services Profile Tony J. Genovese The Americas Grid PMA DOEGridsATF/ESnet/LBNL.
National Institute of Advanced Industrial Science and Technology Brief status report of AIST GRID CA APGridPMA Singapore September 16 Yoshio.
NECTEC-GOC CA Self Audit 7 th APGrid PMA Face-to-Face meeting March 8 th, 2010 Large-Scale Simulation Research Laboratory Sornthep Vannarat Large-Scale.
Revocation in MICS §4.4 May 11-13, 2009 Zürich, Switzerland.
Maintaining Network Health. Active Directory Certificate Services Public Key Infrastructure (PKI) Provides assurance that you are communicating with the.
IHEP Grid CA Status Report Gongxing Sun F2F Meeting 20 Apr Computing Centre, IHEP,CAS,China.
IHEP Grid CA Status Report Wei F2F Meeting 8 Mar Computing Centre, IHEP,CAS,China.
Second Annual Meeting of the Romanian Tier-2 Federation RomanianGRID CA STATUS Cosmin Nistor; Alexandru Bobe Romanian Space Agency (ROSA)
IHEP Grid CA Status Report Gongxing Sun 5 th F2F Meeting 16 Sep Computer Center, IHEP,CAS,China.
Profile for Portal-based Credential Services (POCS) Yoshio Tanaka International Grid Trust Federation APGrid PMA AIST.
EUGridPMA status and updates David Groep, GGF18. EUGridPMA Status Update, TAGPMA Ottawa David Groep – Items  EUGridPMA.
KISTI Grid CA Status Report Korea Institute of Science and Technology Information Sangwan Kim Jae-Hyuck Kwan
Sam Morrison APAC CA – APGridPMA - ISGC2010 APAC CA Self Audit and status update Sam Morrison ARCS.
Academia Sinica Grid Computing Certification Authority (ASGCCA)
KFKI RMKI CA Review EUGridPMA May 26-28, Copenhagen Szabolcs Hernáth MTA KFKI RMKI pki.kfki.hu.
© 2003 The MITRE Corporation. All rights reserved For Internal MITRE Use Addressing ISO-RTO e-MARC Concerns: Clarifications and Ramifications Response.
Who’s watching your network The Certificate Authority In a Public Key Infrastructure, the CA component is responsible for issuing certificates. A certificate.
Academia Sinica Grid Computing Certification Authority (ASGCCA) Jinny Chien April 20, th APGridPMA in Taipei.
Security+ Chapter 6 Lab Screen Shots Security+ Chapter 6 Lab Screen Shots Installing Enterprise Subordinate CA Thanks to Rhonda!
NECTEC-GOC CA The 3 rd APGrid PMA face-to-face meeting. June, Suriya U-ruekolan National Electronics and Computer Technology Center, Thailand.
APGrid PMA face-to-face meeting, 9/16/2008 PRAGMA-UCSD CA Team Pacific Rim Application and Grid Middleware Assembly
Community PKIs Initiatives Updates TF-EMC2 Meeting Loughborough, UK 6-7 May, 2009 Licia Florio, TERENA
0 NAREGI CA Status Report APGrid F2F meeting in Singapore June 4, 2007 Rumiko Masuko.
KEK GRID CA Takashi Sasaki Computing Research Center KEK.
TACAR Updates version David Groep, NIKHEF. 9 th EUGridPMA ‘RAL’ meeting – Jan David Groep – TACAR Aims  Trusted and.
Egypt Certification Authority Dr. Ayman Bahaa-Eldin EUN Director 8 May th EuGridPMA meeting, Germany.
Baltic Grid Certification Authority 15th EUGridPMA, January 28th 2009, Nicosia1 Self-audit Hardi Teder EENet.
PKI for improved cybersecurity in NATO Partner countries Software Arsen Hayrapetyan, ArmeSFo CA.
TR-GRID CA Self-Auditing Results and Status Update EUGridPMA Meeting September 12-14, 2011 Marrakesh Feyza Eryol, Onur Temizsoylu TUBITAK-ULAKBIM
HKU Computer Centre Grid Certificate Authority Status Update Lilian Chan IT Services, The University of Hong Kong APGrid.
FP6−2004−Infrastructures−6-SSA [ Empowering e Science across the Mediterranean ] Rome, Tutorial for Certification Authority Managers,
BG.ACAD CA HTTP :// CA. ACAD. BG S ELF - AUDIT REPORT 2014 Vladimir Dimitrov IICT-BAS ( 32 nd EUGridPMA Meeting Poznan, 8-10.
QuoVadis accreditation with EuGridPMA Alessandro Usai
Summary of Poznan EUGridPMA32 September EUGridPMA Poznan 2014 meeting – 2 David Groep – Welcome back at PSNC.
18 th EUGridPMA, Dublin / SRCE CA Self Audit SRCE CA Self Audit Emir Imamagić SRCE Croatia.
Academia Sinica Grid Computing Certification Authority F2F interview (Malaysia )
Feyza Eryol TÜBİTAK ULAKBİM TR-GRID CA SELF-AUDIT & UPDATES.
Department of Computer Science Introduction to Information Security Chapter 8 ISO/IEC Semester 1.
UGRID CA Self-audit report Sergii Stirenko 21 st EUGRIDPMA Meeting Utrecht 24 January 2011.
HellasGrid CA self Audit. In general We do operations well Our policy documents need work (mostly to make the text clearer in a few sections) 2.
News from EUGridPMA EGI OMB, 22 Jan 2013 David Kelsey (STFC) Using notes from David Groep 22/01/20131EUGridPMA News.
29 th EUGridPMA meeting, September 2013, Bucharest AEGIS Certification Authority Dušan Radovanović University of Belgrade Computer Centre.
IHEP Grid CA Status Report F2F Meeting 17 Mar Computing Centre, IHEP,CAS,China.
Self-Audit & Status Report for KEK GRID CA Hiroyuki Matsunaga KEK (High Energy Accelerator Research Organization), Computing Research Center APGridPMA.
26-28 January 2009 – Nicosia, EUGridPMA CALG CP/CPS updates Dana Ludviga LatGrid CA, SigmaNet, IMCS UL.
PKGrid CA Self-Audit 2012 Adeel-ur-Rehman Mansoor Sheikh.
IRAN-GRID CA Self Audit IRAN-GRID CA Self Audit Report Shahin Rouhani IRAN-GRID Tehran Iran Shahin Rouhani Grid Computation Group IPM, Tehran, Iran May.
AEGIS Certification Authority
UGRID CA Sergii Stirenko, Oleg Alienin
HellasGrid CA & euGridPMA
MaGrid CA Self audit and update
Emir Imamagić University Computing Centre (Srce)
Bill Yau HKU Grid Certificate Authority (HKU Grid CA) Self Audit & Status Report Bill Yau
KISTI CA Report Status & Self-Audit
BG.ACAD CA Self-audit report 2018
Presentation transcript:

NIIF CA Status Update and Self-Audit Results 15 th EUGridPMA meeting Nicosia Tamás Máray NIIF Institute

th EUGridPMA meeting - Nicosia2 Agenda General information Current status of CA – statistics Results of the self-audit Actions taken Future plans

th EUGridPMA meeting - Nicosia3 General Information NIIF CA is an X.509 PKI CA with online CA infrastructure (Sun CMS + HSM: Chrysalis Luna crypto HW) It was accredited by the EUGridPMA in 2005 January during the Marseille meeting It provides free X.509 user and host certificates mainly for the academic user community (research and higher education) in Hungary but also for some companies participating in EU FP projects Located in Budapest, operated by NIIF Institute (the Hungarian NREN)

th EUGridPMA meeting - Nicosia4 Current Status of CA As of yesterday: –617 CERTs are issued in total –183 CERTs are valid –394 CERTs are expired –40 CERTs are revoked About 15% of all the CERTs are for hosts, 85% for users

th EUGridPMA meeting - Nicosia5 The Self-Audit What it meant to be: A thoroghful review of –the operation of the CA, –the documents, –the identification process involving the entire staff responsible for running the CA Review is based on Yoshio Tanaka’s “Guidelines for auditing Grid CAs version 1.0-b6” published in September 2008

th EUGridPMA meeting - Nicosia6 Results Very serious problems were not detected. Issues found: –Operational manual is missing –The CPS/CP documents are still organised according to RFC 2527 –Q10: The secure environment is documented only in Hungarian (NIIF’s internal regulation documents, ISO 9001:2008, ISO/IEC 27001:2005) therefore it is not available to the PMA Score: B –Q17 and Q18: root key renewal process is not satisfyingly addressed. Discussion of the overlap issue is missing… Score: B

th EUGridPMA meeting - Nicosia7 Results (cont.) Issues found: –Q32: multiple, simultaneous revocations have not been tested yet… Score: X –Q43: FQDN is not included in the SubjectAlternativeName in host certificates Score: B(?) –Q53: yearly operational audit of the CA/RA staff was not a practice before (though a regular, internal NIIF service reporting procedure is implemented) Score: B –Q62: disaster recovery procedure is not described in CPS/CP (though a general procedure description do exist for the NIIF as a whole) Score: C

th EUGridPMA meeting - Nicosia8 Actions taken An audit report was prepared, giving answer to *all* the audit questions Moreover, decisions were made about: Simplifying the certification request process (leaving out the requirement of the “project manager’s” approval of the request from the Pre-Authorisation phase) –Done Simplifying the operation (quitting the former log server, archiving the logs directly from the TCB) –Done Simplifying the documentation work (CPS/CP are only published in English, Hungarian version is not maintained anymore) –Done Modifying the CPS/CP documents accordingly –Done. (Version 1.4 is prepared.)

th EUGridPMA meeting - Nicosia9 Future Plans Preparation of the operation manual Preparation of the CA’s disaster recovery plan Reorganising CPS/CPs according to RFC 3647 Including FQDN in the SubjectAlternativeName in host certificates(?) Implementing a yearly operational audit of the CA

Thank you!