PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Novel Beam Diagnostics on PXIE Vic Scarpine, FNAL 2nd Annual PASI Meeting April 3-5, 2013.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Key Specifications for Tevatron BPM Hardware Architecture Choices Jim Steimel.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
ESS DTL beam commissioning
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
ORNL is managed by UT-Battelle for the US Department of Energy SNS Beam Diagnostics: Ten Years After Commissioning A. Aleksandrov Oak Ridge National Laboratory,
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Beam diagnostics in the beamlines
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Developments of the FETS Ion Source Scott Lawrie.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
MEBT status A. Shemyakin for the PXIE warm front end group PIP-II technical meeting January 20, 2015.
PXIE LEBT Status Update Lionel Prost PIP-II “Friday” Meeting January 16 th, 2015.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Beam Commissioning Adam Bartnik.
Re-entrant BPM R&D for ILC Main Linac
BPMs in the new Dump Line
BE-BI Software for LINAC4
Physics design on Injector-1 RFQ
ERL BPM System Mike Billing, Mark Palmer
LINAC4 commissioning plans etc.
Beam Current Monitoring with ICT and BPM Electronics
Breakout Session SC3 – Undulator
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
Presentation transcript:

PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016

Overview Previous work: focus on LEBT instrumentation commissioning and Source/LEBT beam operations Simpler systems: DAQ based on HRM digitizers Simple bias technique for isolated beam pickups Now: Focus on MEBT instrumentation development for RFQ commissioning Primarily beam current system and BPM system Transition from HRMs to FPGA-based digitizer frontends Allows for more flexibility and dynamic operation Integration into MPS Preparing instrumentation for initial pulsed beam operation through RFQ into MEBT 1.1 Goal of initial beam current system ready 1 st week of March and BPM system 2 nd week of March

PXIE LEBT Upstream of chopper Long pulses DCCT, EIDs HRM DAQ – single point measurement – no change Downstream of chopper Short pulses Toroid, collimator, LEBT scraper Digitizer/FPGA DAQ – waveform measurements Integrated with MPS Optional signal to HRMs

RFQ Vane Voltage Measurements Measure x-ray spectrum to get vane voltage measurement X-ray detector installed at beam output of RFQ Previous measurements made of MEBT buncher cavity

MEBT 1.1 Quad Doublet Quad Doublet Buncher Toroid Ring Pickup MPS BPM Time-of-Flight Movable BPM RFQ Fast Faraday Cup Faraday Cup Dump Electrical Isolated Scrapers

Frontend Electronics for Beam Current Measurements Toroids, Faraday cup dump, scrapers Signal cables scheduled to be pulled Racks being dressed Utilize FPGA-based 8-channel, 125 MHz, 14 bit digitizer cards Allows for pipeline or snapshot DAQ and signal processing Only pulsed beam for initial operations Initial FPGA and VME code - reuse FAST code Integrated with MPS Initial goal ready for beam 1 st week of March Need to understand noise and systematic effects Large gain on toroids Tight beam loss requirements for MPS Needs further study LEBT Toroid Calib signal 1 mA, 20  s 50 mV signal 60 db gain

Ring Pickup - Machine Protection 8 Dedicated ring pickup to measure bunched-beam current Wide bandwidth pickup but narrowband electronics Simple analog circuit give rectified signal pulse Pickup installed in beamline Analog electronics completed and tested Signal measured through beam current frontend High/Low threshold for MPS Short beam pulse software installed and being tested Software for MPS installed Pickup response out to 2 GHz

DAQ with FPGA-based electronics for CW and pulsed beam 12 channel, 14 bit, 250 MSPS boards Analog filter & amp boards built and tested MHz 1 st and 3 rd harmonics Pseudo bunch length measurements MEBT BPMs 9 Requirements: Status: First two BPMs being installed in quads Stretched wire measurements performed Electronics assembled with initial testing on bench Instrumentation rack being filled Reuse frontend software from other systems Pulsed beam initially Average position, phase, intensity per pulse Initial system ready goal of 2 nd week of March

Time of Flight (ToF) Movable BPM Measure beam velocity (  energy) via ToF Utilize movable BPM to minimize systematics e.g. BPM response, bunch shape effects Use HINS BPM on linear stage ~ 1” of travel; ~10  m resolution Allows for “continuous” phase measurements MEBT energy resolution: 0.1% Status: Motion stage installed; BPM ready Use MEBT BPM electronics to acquire phase Working on motion control (cables and software) 10

Bunch Length - New Fast Faraday Cup New design Embedded 50  stripline – initially designed by SNS High Bandwidth ( > 6 GHz) – need scope DAQ Beam damage at HINS (2.5 MeV protons) We redesigned with better thermal properties Old model tested at HINS and Linac Prototype new design tested in PXIE LEBT Assembly into beamline occurring now DAQ via scope – manual operation Old design - Damage with HINS beam Linac MEBT Measurements

Allison Scanner for MEBT Emittance Measurements Design a water cooled Allison-style MEBT emittance scanner based on LEBT scanner Gives faster phase-space measurement Reuse most LEBT hardware except scanner head 2.1 MeV  requires longer deflector plates  requires more beam line space Higher beam power  no CW operation 12 Preliminary numbers: HV plate length: 300 mm Flange-to-flange: < 450 mm HV plate separation: 6 mm Plate HV: ± 1 kV ~ ± 10 mrad angular range Status: Vacuum enclosure under design Design mostly finished Ordering hardware Estimate May/June for MEBT installation

Summary Instrumentation focus now is on preparation for first RFQ beam All MEBT configuration 1.1 instruments proceeding No perceived delays for beam line installation Software development manpower limited/priorities Initial instrumentation software for pulsed mode only Average values per pulse Basic beam measurements at first beam Noise and systematics may be a issue  filters, averaging, signal processing Integration of instrumentation signals into MPS proceeding and added as needed Goal of initial beam current system ready 1 st week of March and BPM system 2 nd week of March - Manpower limited – lower priority COMMISSIONING WILL TAKE TIME – NOT PLUG-N-PLAY SYSTEMS

Extra

Prototyping Wire Scanner Developing prototype wire scanner for profile measurements Test in diagonal port of MEBT scraper Constructed mock-up to test wire stretching and mounting issues