Unit 210: How to communicate with others

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Managing the Health and Safety of Contractors
Duty to Manage Asbestos (an Inspectors View) David Price HM Inspector of H&S HSE Birmingham Office.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Construction (Design and Management) Regulations 2007
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Skyscraper Construction
Customer Service & Customer Protection in MANSELL
Unit 204: Common plumbing processes
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
CDM Regulations 2015 The Practical Implications of the Changes for the Construction Industry 17th June 2015 Slide 1 They say a journey of a thousand miles.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
EM15 – Contractors COST MANAGEMENT
UK’s CDM Regulations 2007 and its Applications in Singapore
Risk Assessment – An Essential Standard
Bringing Quality At Your Budget P.O.Box contact AL BARARI STAR.
Construction Category Management Planning Version 1.1 (May 2015)
BCT 100 Overview of the Construction Industry. The ‘Players’ in Construction Ralph Leibing describes the ‘players’ as: The Owner and Representatives The.
 Real Estate Clerk – performs clerical duties at a real estate office  Real Estate Broker - attempts to find sellers who wish to sell and buyers who.
Health and Safety Reform Bill: What you need to know.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
 Journeyman  Management  Specialization  Teaching  Owning a business.
By: Michael Hilbrant There are many different kinds of construction jobs. The main groups of construction are the builders, which do the frame work and.
Constructionsite Roles in Construction Ron Gatepain.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Specification & Quantities Estimating
Unit 201: Health and safety in building services engineering
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
General Contractor Davon Woodard February 11, 2014 Career Tech.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Week 6 Timber based columns
Careers in the Industry
Selecting Suitable Equipment
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
Objective 10.01: RECOGNIZE career opportunities in the housing industry.
Sprinkler Loads on Trusses Educational Presentation.
Outcome 2 How to apply information sources in the building services industry Unit 210: How to communicate with others.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 29 PowerPoint presentation Types of organisation,
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 25 PowerPoint presentation Key trades Hazards.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 8 PowerPoint presentation Industry bodies Unit.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
The first College of Advanced Technology in the UK. About PROCAT The first College of Advanced Technology in the UK. Did you know? The largest apprenticeship.
Joanne Macgregor C Lund & Son Ltd March 2016
Roles and responsibilities PM
The Design Team Carl James.
Construction Activity
(Refer to Chapter 2 of the textbook)
RIBA Plan of Work 2013.
Craft Occupations in the Construction Industry
SURFACE FINISH.
Temporary Works Co-ordination
Project Development and Managing your Build Agenda
Pre-Contract Cost Control
A Career in Construction
Pre-contract Planning and Practice
Introduction to building contract
Back Ground Information
RIBA Plan of Work 2013.
Presentation transcript:

Unit 210: How to communicate with others Outcome 1 Members of the construction team and their role within the building services industry

Communicating The construction of a building is a complex process that requires many professionals – the construction team – to work together. We need to have an understanding of the role and responsibility of the members.

Site management team Quantity surveyor Client Building surveyor Architect Local Authority Structural engineer Health and Safety Inspector Clerk of works Building services engineer Building Control Officer Building contractor Civil engineer Buyer Estimator Subcontractor Suppliers

Construction team members Client This is probably the most important person, as they are the reason the project is going ahead. It could be an individual, a company or an organisation Employ contractors directly or indirectly Under the Construction Design and Management Regulations, they have responsibility for the health and safety of those on site

Construction team members Architect The designer of the project and considered the leader of the management team They convert clients’ ideas and requirements into a building design and working drawings They liaise with the client regularly at the early stages, and throughout the project

Construction team members Clerk of works (project manager) Generally appointed by the architect; act as their representative on site Ensure the building is constructed as per the drawings, standard of work and quality of materials Liaise regularly with the architect and the construction teams on site Can sign a variation order

Construction team members Structural engineer (specialist engineer) They work closely with the architect to find the most efficient method of construction They calculate loads, forces, variances from wind and rain, looking at structural safety They are sometimes involved in insurance claims, repair work and alterations to properties

Construction team members Surveyor Sometimes known as the Building Surveyor They have to position the building on the land, and ensure Building Regulations are followed throughout the process They will discuss problems on the way and try to resolve difficulties They will visit the site regularly to ensure the building process is being carried out correctly

Construction team members Building services engineer (specialist engineer) Design the internal services within the building which will be cost effective, environmentally sensitive, and with good maintenance access: Heating and ventilation Hot water and cold water Air conditioning Drainage May also be responsible for electrical distribution, fire protection, lifts, escalators, acoustics etc

Construction team members Quantity surveyor Suggest construction methods within the client’s budget Calculate the amount of labour and materials required to complete the project. These details are then collated in the bill of quantities, which is used by contractors to produce an estimate/quotation Visits the site to measure work carried out, to produce interim payments and final accounts

Construction team members Building contractor The contractor will enter into a contract with the client to carry out the work in accordance with the drawings, bill of quantities and specification Each contractor will tender for jobs They will need to employ specialists within the trade to undertake key roles

Construction team members Buyer (works for the contractor) Sources the materials needed to complete a project by obtaining quotations from suppliers for materials, with delivery times and quality assurance Estimator Breaks down the bill of quantities into unit parts, which represent the amount it will cost a contractor to complete each stage Add company overheads and profit margin

Construction team members Contracts manager (works for the contractor) Supervises the contract – creation, planning and building Liaises with head office and the site agent Site agent Sometimes known as the construction manager, they are responsible for running the site Plan ahead and make sure the work is carried out safely

Construction team members The people we have looked at so far are mainly off-site workers; now we will look at on-site workers.

Construction team members Subcontractors They enter into a contract with the main building contractor to carry out a specific or specialist area of work: Plumbing Heating and ventilation Air conditioning Electrical installation Plastering Bricklaying Joinery etc

Construction team members Site supervisor Sometimes also the construction manager – the building contractors’ main representative on site Responsible for the day-to-day running of the site; budgets, hiring, deliveries, construction duties etc

Construction team members Trade supervisor The different trades will have their own supervisor who is responsible for the running of their part of the contract. Allocation of duties Coordinate with other trades Attendance records Explaining and enforcing regulations Overseeing workforce Resolving problems and grievances

Construction team members Bricklayer (craft) Construct building to the architect’s specification using bricks, blocks and stone Carpenter (craft) Also known as joiner First fix: doorways, window frames, joists and trusses Second fix: doors, skirting and architraves Plumber (craft) Install hot and cold water, heating and gas First fix: pipe carcasses Second fix: appliances

Construction team members Electrician (craft) Install and test electrical installations for lights, sockets, fire alarms, intruder alarms First fix: cable, conduit and trunking Second fix: appliances Heating and ventilation (craft) Also SAC engineers Large diameter pipework and ducting Gas fitter (craft) On commercial sites, gas fitter may be required to install the gas pipes and appliances

Construction team members Plasterer (craft) Responsible for wall and ceiling finishes, dry lining, rendering Using modern and traditional methods Painter (craft) Also known as a decorator Paint and wallpaper walls, ceilings, woodwork Tiler (craft) Responsible for tiling floors and walls in properties Specialists may be needed to tile swimming pools and wet rooms

Construction team members Groundworker Sometimes known as a general operative or labourer Mix concrete, lay drains, offload materials and generally assist craft operatives Specialists These can include scaffolders, glaziers, suspended ceiling installers etc

Construction team members Inspectors There are several visitors to site who have specific roles to play, quite often concerning health and safety They inspect to make sure the building project is complying to the rules and regulations, and that the workers and eventual occupants will be safe

Construction team members Inspectors Health and safety inspector Usually works for the HSE but can be employed by the local authority Can arrive unannounced to ensure health and safety law is being implemented by the building contractor Building control officer (BCO) Works for local authority in the planning office and makes sure Building Regulations are being observed in planning and construction Have power to reject plans but can also offer advice Visit site at different stages and finally sign off the work

Construction team members Inspectors Water inspector Employed by the water undertaker Key role is to reduce the risk of contamination in the public water supply They enforce Water Regulations by randomly inspecting occupied properties and all new builds May also inspect in cases of contamination or problems Electrical services inspector Employed by the local electricity supplier They inspect new electrical installations to ensure they comply with all IEE wiring regulations

Test yourself Who would fit lintels? Answer: Bricklayer To improve working relationships what could you organise? Answer: Social events outside of work Which trade installs conduit? Answer: Electricians Who is responsible for ensuring build complies with L1a Answer: Building control officer (BCO)

Test yourself Who would design a heating system for a new restaurant? Answer: Architect (with the building services engineer) Once a new office block is built, who would be responsible for the facilities? Answer: Facilities manager Which regulation covers contamination? Answer: Water Regulations 1999