Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer 1.1.4.6.

Slides:



Advertisements
Similar presentations
Basic Refrigeration Cycle
Advertisements

February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Cryogenics Applied Technology Development Dana Arenius, Rao Ganni Engineering Division Cryogenic Systems Department Technology Town Meeting Feb 9, 2012.
Current status Arkadiy Klebaner November 21, 2012
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
ORNL is managed by UT-Battelle for the US Department of Energy Cryogenic System Operating Experience at SNS Presented at the CEC/ICMC 2015 – C3OrA Matthew.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
Superconducting Electronics and Detectors Workshop “Jefferson Lab Cryogenic Operation” Mathew C. Wright December 1,
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
TE-CRG Activities D. Delikaris, TE-CRG.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Manoj Kumar, B. N. Duttagupta, Rajvir Singh Doohan, S. K. Joshi, A. K. Sagar, L. Chowdhary, Rekhya Naika, Prabhat Kumar Gupta, Vivek Nema, Hemant Kumar.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
LCLS-II Cryoplant Overview
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Thomas Jefferson National Accelerator Facility LCLS September 13, 2013 Dana Arenius Rao Ganni Jefferson Laboratory Sept 13, 2013 CRYOGENIC SYSTEMS.
Makara, Aug. 17, Cryo Dept. Shutdown Status.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Process Requirements and Design Approach
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
Online Helium Inventory Monitoring of JLab Cryogenic Systems
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Overview of Mechanical Design
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Action People Time [h] Shutting down the SR 2 1
2K Cold Box Process Design
2K Cold Box Mechanical Design
SC1R Cold Box PDR: Process Requirements
Mathew C. Wright October 2016
Pressure Piping Analysis
Mathew C. Wright January 26, 2009
Cryo-ops 2018,Beijing,IHEP
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
Overarching Commissioning Plan
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
CTF Users’ Perspective
ESR2 Process Cycle Design
Onsite Training at JLab
Cryogenics – The Basics
SNS PPU Cryomodule Instrumentation
ESR2 Process Cycle Design
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer Cryogenic Maintenance and Upgrade Plans Cryogenics CEBAF Cryogenics and SRF Workshop Jefferson Lab April 3, 2014

Thomas Jefferson National Accelerator Facility Page 2 CEBAF Cryo & SRF Workshop April 3, 2014 Outline 2014 Summer Maintenance Task List Examples Budget/Cost Estimates Schedule Helium Inventory Spares CHLI CHLII Future Maintenance Linac’s on one 2K

Thomas Jefferson National Accelerator Facility Page 3 CEBAF Cryo & SRF Workshop April 3, 2014 Task List

Thomas Jefferson National Accelerator Facility Page 4 CEBAF Cryo & SRF Workshop April 3, 2014 Task List Task List (2014 Summer) Add a vaporizer to the CHLI main cold box (MCB) Clean HX1 in the CHLI MCB Replace and regenerate the carbon in the CHLI main carbon bed (the one outside). This job requires many months of clean-up Modify insulating vacuum piping for the CHLI MCB Install a super Conducting helium liquid level probe to CHLI MCB sub-cooler (HX9a) Repair oil leak on CHLI main compressor C4 Clean water side of all main compressor oil/water heat exchangers Remove the old purifiers (to make room for the new vaporizer) Install the LINAC low pressure relief system (hurricane reliefs) LN2 dewar fill station over pressurization prevention modifications

Thomas Jefferson National Accelerator Facility Page 5 CEBAF Cryo & SRF Workshop April 3, 2014 Add a vaporizer To prevent the temperature of the LN2 boiler becoming dangerously low during 2KCB Pump Downs damaging the LN2 boiler and shutting down CHLI cryo systems To shed capacity during off normal operations 4K) It is a problem now because we are pumping one LINAC vs two LINAC’s

Thomas Jefferson National Accelerator Facility Page 6 CEBAF Cryo & SRF Workshop April 3, 2014 Clean HX1 in the CHLI MCB Reduce the amount of wasted LN2 Outlet temp of med pressure header cold causing carbon pipes to sweat and rust all the way to the compressor room and sometime get below the allowable temperature limit

Thomas Jefferson National Accelerator Facility Page 7 CEBAF Cryo & SRF Workshop April 3, 2014 Modify vacuum piping for the CHLI MCB Presently can only pump on the vacuum space through the diffusion pump Need extra vacuum port to be able to attach external pump like what is on CHLII CBX CHLI main CBX vacuum was leading cause of downtime at the end of 6GeV

Thomas Jefferson National Accelerator Facility Page 8 CEBAF Cryo & SRF Workshop April 3, 2014 Regenerate CHLI Carbon Bed This job requires many months of carbon drying process Life of carbon bed design ~8 year Installed 2004 Oil Carry over into CBX causes wasted LN2, rusty pipes, and if bad enough, will shut down the CBX

Thomas Jefferson National Accelerator Facility Page 9 CEBAF Cryo & SRF Workshop April 3, 2014 Remove the old purifiers

Thomas Jefferson National Accelerator Facility Page 10 CEBAF Cryo & SRF Workshop April 3, Budget/Cost Estimates Material Cost Estimates based on Vendor Quotes

Thomas Jefferson National Accelerator Facility Page 11 CEBAF Cryo & SRF Workshop April 3, 2014 Schedule

Thomas Jefferson National Accelerator Facility Page 12 CEBAF Cryo & SRF Workshop April 3, 2014 Schedule

Thomas Jefferson National Accelerator Facility Page 13 CEBAF Cryo & SRF Workshop April 3, 2014 Schedule

Thomas Jefferson National Accelerator Facility Page 14 CEBAF Cryo & SRF Workshop April 3, 2014 Spares Typical Needed Compressor Body, Motor, Oil Pump, Oil Pump Motor Spare compressor bodies (6-9 month lead time after PO) Spare motors (9-12 month lead time after PO) Warm helium piping cross connects between CHLI and CHLII If a CHLII system compressor goes down If one down – 4K If two down – 300K Recommendation New C6 compressor skid Two spare compressor bodies (CHLII C1-C4) One 800HP motor (CHLII C1-C4)

Thomas Jefferson National Accelerator Facility Page 15 CEBAF Cryo & SRF Workshop April 3, 2014 Linac’s One CHL supporting 2K Add a large cryo valve on spare 9” bayonets Need to evaluate if we need to switch CHLI/CHLII with the South/North LINAC’s Unreliable and marginal heater/capacity problems Process modifications at CHL? Add 1.5kW external heater? Needs more process analysis

Thomas Jefferson National Accelerator Facility Page 16 CEBAF Cryo & SRF Workshop April 3, 2014 Future Maintenance CHLI future maintenance Leftover from List CHLII future maintenance Dewar Vacuum CBX Vacuum piping / system Warm Gas Tie-In New Compressor Skid (C6) LINAC Guard Vacuum Pumps Need Replacement