Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Low material budget microfabricated cooling devices for particle detectors P. PETAGNA and A. MAPELLI On behalf of: CERN PH/DT The NA62 Collaboration EPFL.
122 Nov GTK Microchannel Cooling Hydraulic simulation with Rectangular Manifold Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 22 th Nov 2011 E. Da Riva,
Thermo Fluid Design Analysis of TBM cooling schemes M. Narula with A. Ying, R. Hunt, S. Park ITER-TBM Meeting UCLA Feb 14-15, 2007.
1 21/10/2011 GTK Microchannel Cooling coupled simulation Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 21 st October 2011 E. Da Riva, V. Rao.
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Abstract An upgrade to the ATLAS silicon tracker cooling control system may require a change from C 3 F 8 (octafluoro-propane) to a blend containing 10-30%
GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
NA62-GTK special meeting on cooling options
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
30 th June 20111Enrico Da Riva, V. Rao Parametric study using Empirical Results June 30 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
TSV-Constrained Micro- Channel Infrastructure Design for Cooling Stacked 3D-ICs Bing Shi and Ankur Srivastava, University of Maryland, College Park, MD,
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Cooling System Solutions
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
Microfluidic Cooling for Detector and Electronic OUTLINE: Motivations for micro-channel cooling in HEP Micro-technologies involved First possible HEP cases:the.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
E. Da Riva/M. Gomez Marzoa1 WG4 Meeting - 27th June 2012 Air Cooling by means of carbon fiber structure Enrico DA RIVA (EN-CV-PJ) Manuel GOMEZ MARZOA (EN-CV-PJ)
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
Feasibility Analysis of a Two Phase Solar Thermal Water Heater Solar Thermal Solutions (M15) Project Supervisor: Dr. Y. Muzychka April 3 rd, 2014 Marcus.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
A two-stage system for the future cooling system.
GTK Controls and Safety Thermal results with the ceramic heater Kaitlin Howell, Georg Nüßle, Paolo Petagna,
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
SPS High Energy LSS5 Thermal contact & cooling aspects
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Radiation hard, micro-engineering solutions for thermal management in high energy physics and space applications Diego Alvarez Feito, Julien Bonnaud, Enrico.
For the CMS Pixel detector
ISIS TS1 Project: Target Design and Analysis
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Microchannel cooling - Update
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
Ti/SS transitions A.Basti INFN-PISA*
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Micro-channel Cooling
For the CMS Pixel detector
SILICON PIXELS DETECTOR
ALICE PD group meeting Andrea Francescon.
Microfluidic devices for thermal management
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
WG4 – Progress report R. Santoro and A. Tauro.
Toward the final design of a TPC for the ILD detector
Re-circulating CO2 Test System
Phase II Collimators : design status
Status of CMS-PPS timing detectors
For the CMS Pixel detector
Presentation transcript:

Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University / CERN PH-UFT G. Nuessle – Université Catholique de Louvain / CERN PH-UFT A. Pezous - CSEM P. Renaud – EPFL-LMIS4 E. Da Riva, V. Singh Rao, P. Valente – CERN EN-CV October, 28 th 2011, CERN NA62-GTK special meeting on cooling options

Basic concept: couple to the heat production region a thin silicon layer structured with  - channels, where coolant is circulated ADVANTAGES: Low material budget High thermal stability High thermal uniformity High efficiency (low fluid-sensor  T) Easily adaptable to changing conditions Conventional single phase cooling plant

1 Cooling System Requirements Absorption of nominal dissipated power ~100% Stabilization of detector temperature ~5  C Surface temperature uniformity ±3  C Material budget  0.15% Xo 2 Operation Aspects Meeting stable temperature Reaction time to power failure Reaction time for hydraulic failure 3 Integration Aspects Preliminary integration design Assembly operation sequence Test Plan 4 Cooling System Details Conceptual Design Cost Estimate Radiation Effects Infrastructure Requirements Main conditions to be met by a candidate cooling system as defined by NA62 GTK In the following presentations we will cover this list of conditions and prove that  -channel cooling is indeed a solid and satisfactory option for application to the NA62 GTK

Sequence of talks: Microfabrication: design and production (Mapelli) Experimental analysis of the thermal performance (Howell / Nuessle) Optimization of the geometrical configuration (Da Riva / Singh Rao) Electro-mechanical integration (Jilg / Romagnoli) Cooling plant (Valente) Radiation effects (Nuessle)

Microfabrication Micro techniques involved Design Process flow Final geometry Potential commercial partners Cost estimate

Thermal performance Power absorption Temperature stability Temperature uniformity Reaction to failures Sample cooling plates following a first proposed design have been produced in-house (EPFL CMI) and tested for thermal performance. The production process is fully under control and the produced plates prove to be reliable. An extensive testing activity has been performed in realistic conditions: Initially designed under the assumption of a uniform power distribution over the surface of the sensor assembly, the cooling plates have been successfully tested again more realistic conditions of uneven power distribution between the digital and the analog part of the chip. Due to inherent limitations of the cooling station available for the tests, the thermal performances have been analysed up to ~ ½ the nominal flow rate and ~ ½ the nominal power distribution. A simple extrapolation allows for an exact forecast of the performance under nominal conditions

Geometrical optimization Manifold geometry optimization (pressure drop and flow uniformity) Channel cross section optimization (pressure drop and material budget) The tests performed on sample cooling plates produced with the “design 0” geometry showed their fully satisfactory behaviour with respect to the specifications on the thermal performance. However, there is space for further optimization towards material budget reduction and reliability enhancement (structural safety factor). This has been accomplished through a detailed CFD analysis. The CFD optimization performed brings to an optimized geometry with double inlet / double outlet and minimized channel depth (i.e. enhanced performance, larger structural safety margin and reduced material budget). Cooling plates based on the new optimized design are presently under production.

Electro-mechanical integration Concept of integrated module Precision / repeatability issues during production Study of the jigs required for the production Preparation to the prototyping phase The geometry produced by the CFD optimization has been integrated with the detailed understanding of the production cycle and led to a final cooling plate configuration. This configuration has been implemented in a full 3D CATIA model of the GTK module and a complete study of the electro-mechanical integration of the module has started. The integration concept moves from the experience of the Totem Roman Pots, and LHC detector with several similarities to the GTK. The integration process proposed appears feasible and solid. A first prototyping phase has now been launched.

Cooling plant Local infrastructure Cooling plant specification Cooling plant draft P&I Cost estimates The proposed microchannel cooling is based on a conventional single phase refrigeration plant. With a sound production, integration and operation process available, it is possible to correctly define the specifications for the cooling plant and therefore launch its definition. The proposed cooling plant falls into the category of standard design and production already managed by CERN EN/CV-DC. All components and solutions are standardized on the basis of the LHC experimental cooling plants. EN/CV will be available to follow the production of the final cooling station as well as it maintenance and operation.

Radiation effects Preliminary activation study of FC72 The monophase cooling fluid circulating in the cooling plate will be placed directly in the primary beam, downstream of the target. Although the selected fluid (C 6 F 14 =FC72), largely adopted in LHC experiments, has been certified to be stable under irradiation, some questioning about the possible level of activation and the related impact on access and maintenance operation has been raised. A preliminary study has been performed by RP. Although the study is still in a preliminary phase, as not all the detailed information required for a more accurate analysis is available yet, all indications point towards vey low activation levels, negligible for all scenarios of access and maintenance.

CONCLUSIONS A fully reliable production technique for Si  -channel structured cooling plates suited for application in the NA62 GTK has been individuated A first design proposed for integration in the module (“design 0”) has been thoroughly tested for thermal performance in realistic conditions and proved to be fully compliant with respect to the specification proposed (temperature stability and uniformity, reaction to failures) A CFD optimization study led to the definition of new geometry (“design 1”) enhancing the thermo-hydraulic performance, reducing the material budget and increasing the structural safety margin. Cooling plates based on the new design are presently in production. The optimized geometry (“design 1”) have been implemented in a full CATIA model of the GTK module and a full electro-mechanical integration study has been launched. The specifications for the cooling station have been defined and a preliminary design study has been performed by EN/CV-DC

THE PROPOSED COOLING PLATE Flat coupling (direct adhesive gluing) to the sensor assembly Dual inlet/outlet and manifolds (additional thickness) outside the sensitive area PEEK connectors Minimized material (double sided local thinning) on the sensitive area 130  m Average material budget in the sensitive area: X/X0 =0.11% (min 0.1%, Max 0,14%)