Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.

Slides:



Advertisements
Similar presentations
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Advertisements

Hunterdon County’s Stone Arch Bridges H unterdon County’s interest in stone arch bridges began in 1992, when a developer wanted to a raze a stone arch.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Specification Changes Pub 408/2011 Changes 1 & 2 District 8-0 Winter Construction School February 23rd, 2012 Linda Atkinson Bureau.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Carrollton Bridge Jonathon L. Sera, P.E. Approaches to Historic Bridge Rehabilitation Case Study #3 1.
Chapter 34 Bridge Construction.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
POWERPOINT PRESENTATION
Chapter 3 Structural Infrastructure Copyright © 2012 by John Wiley & Sons, Inc. All rights reserved. Introduction to Infrastructure: An Introduction to.
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
CATEGORIES OF COMMENTS REGARDING THE DOWNTOWN MOTOR APARTMENTS From October 28 th meeting.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
Increased load capacity of arch bridge using slab reinforced concrete T.G. Hughes & M. Miri Cardiff School of Engineering Arch 04, Barcelona, Nov ,
Arch 04 UNIVERSITY OF MINHO 0 Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November REPAIR OF STONE MASONRY.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
October 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
KYTC Bridge Preservation and Maintenance Program David Steele, P.E. Branch Manager for Bridge Preservation.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Approaches to Historic Bridge Rehabilitation Case Study #4
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Bridge Engineering (5) Substructure – Abutments and Piers
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
PA Non-composite Adjacent Box Beam Bridges PennDOT June 2006 A presentation adapted from the AASHTO T-18 Bridge Inspection Technical Committee Meeting.
La Center, Washington: Balancing Pipelines and Populations 1.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Draft for Discussion & Policy Purposes Only
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
JSC CTC Metallokonstruktsiya Corrugated structures.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Money.
Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Typical Bridge Components
 Final Inspection Reminders  and  Recurring Corrective Work Items.
2009 CUMULATIVE BRIDGE PROGRAM Monroe County Highway Department April 14, 2009.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Posting Bridges for Specialized Single-Unit Trucks
High Bridge Re-Deck Project
Rating Grade Separations
Approaches to Historic Bridge Rehabilitation Case Study #3
Project Purpose and Objective
Blatnik Bridge Management Study
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
4th Annual Construction Law Summit
Pavement Preservation
Replacement of Vehicle Bridge over Spring Creek
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Estler Lake Dam Rehabilitation
Replacement of Vehicle Bridge over Spring Creek
ACEC Designer Training
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural Resource Specialist – Central Office Monica Harrower Cultural Resource Specialist – District 6-0 1

Stenton Avenue Bridge (S.R. 3003) over Wissahickon Creek Whitemarsh Township, Montgomery County Bridge Description Built in 1914 Total length of 168 feet as measured from end to end of wingwalls 2-Span Masonry Arch Bridge (clear spans of 30’ and 26’) comprised of rubble-coursed field stone spandrel walls and parapets with concrete capstones that continue across the wingwalls. The voussoirs of the arch rings are partially parged. The intrados are parged, and concrete toe walls have been placed. 2 Case study #1

Aerial View Showing Project Setting Erdenheim Farm Washington Valley Park Wissahickon Trail Case Study # 3

Stenton Avenue Masonry Arch Rehabilitation Completion Date: 2010 Cost: $1,050,000 Designer: TranSystems Owner: PennDOT Dist. 6-0 Contractor: J.D. Eckman Company 4 Case study #1

Significant Issues Associated With Project Overwhelming inventory of structurally deficient bridges. Increasing number of structural failures to its masonry arch population. Identified the need to develop a repair program that provided for expedited design process and cost effective repair methodology as well as one that preserved and renewed the cultural legacy of masonry arch bridges. 5 Case study #1

Existing Structure Average daily traffic: 9,774 vehicles per day. Important transportation link. Critical Condition due to masonry superstructure condition with several Priority “0” and “1” recommendations requiring timely repairs. Case Study # 6

Structure Was in Critical Condition Case Study # Sections of the masonry walls exhibited cracks, bulges and missing or displaced stones. The structure was classified as Structurally Deficient. Overall, the barrels were in good condition and suitable for reuse in the rehabilitated structure. 7

Substandard Bridge Railings Existing roadway width (20’-10”) was determined to be adequate for traffic volumes. Masonry barriers inadequate height and strength. Substandard guiderail connections. 8

How Significant Issues were Resolved Replace earth fill with lightweight concrete fill. Reconstruct stone masonry parapets with reinforced concrete cores and full width moment slab. Repoint masonry as needed. Scour repair and protection. 9

Temporary Support of Arches Arch “centering”, constructed of a timber and pipe scaffolding system, installed to stabilize the arches during rehabilitation. The existing bituminous pavement, earth fill, masonry parapets and deteriorated sections of the spandrel walls were removed. 10

Replaced Earth Fill with Lightweight Concrete Fill Case Study # Since the utilities would ultimately be encased in the concrete fill, carrier pipes were installed that would permit the smaller diameter utility pipes to be installed after the bridge rehabilitation. Concrete fill was placed over pier and abutments to stabilize the structure during masonry reconstruction. 11

Replaced Earth Fill With Lightweight Concrete Fill Deteriorated sections of the spandrel walls were reconstructed and concrete fill was placed up to sub-grade level of the new reinforced concrete moment slab. 12

Finished Concrete Moment Slab Case Study # Full width reinforced concrete moment slab with integral concrete barriers was constructed on the concrete fill. The barriers were faced with stone and finished with an integral concrete capstone for aesthetics. 13

Concrete Core Barrier Stone facing was also provided on the fascia. Repointing was performed in accordance with the PennDOT Stone Arch Bridge Maintenance Manual and NPS Standards. 14

Finished Roadway Section Case Study # A bituminous wearing surface was added to the concrete moment slab to provide the appearance of the original structure. Note increased parapet height and improved guiderail attachments. 15

Finished Bridge Case Study # 16

How was Section 106 handled PennDOT District 6-0 Stone Arch Bridge Management Plan Ranked #57 (Not recommended for long term preservation). Pro-active approach by PennDOT engineering and cultural resource staff to develop rehabilitation procedures. Memo with project description prepared and forwarded to PHMC for review and approval. Finding of “No Adverse Effect”. All work performed within existing right-of-way. 17 Case study #1

Lessons Learned/Conclusions Through the development of a streamlined repair methodology, PennDOT has been able to efficiently and cost effectively rehabilitate its stone arch bridges. Over the past year, construction contracts for 20 masonry arches have been let employing these procedures. Close coordination with the PHMC has resulted in findings of “No Adverse Effect”. Project has been awarded a 2010 Grand Jury Award by The Preservation Alliance for Greater Philadelphia 18 Case study #1