Community Solar. Background Review of Electricity System mandated by Bill 1 – Nov. 2013 “Our Electricity Future, Nova Scotia’s Electricity Plan” released.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

Métis Nation of Ontario Métis Nation of Ontario as a Renewable-Energy Supplier in Ontario ABORIGINAL PROCUREMENT Lands, Resources and Consultations Aly.
GPA Renewable Energy Resource for Guam Power Authority
Town of Hopkinton Solar Energy Project Proposal March 2013 Presented by Hopkinton Sustainable Green Committee.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
Green Energy Co-operative of Ontario Introduction to H.A.R.E. (Hamilton Association for Renewable Energy)
City of Eagle Pass, Texas TxCDBG Contract HOUSING REHABILIATION.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
2012 Solar Bulk Purchase for DC Nonprofits and Small Businesses.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Solar Energy in Washington State and Executive Order All Stakeholder Workgroup Jake Fey Director, WSU Energy Program December 8, 2014.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
Contracts for Difference Harrison Clark Rickerbys.
Interconnection of Distributed Generation
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
1 RELIABILITY AFFORDABILITY ENVIRONMENTAL STEWARDSHIP Bringing Solar to the Community Jennifer Szaro, Orlando Utilities Commission.
The Alternative Energy Policy Landscape Surrounding AR.
ORECA Director Education Conference June 2, 2015 Jeff Beaman, Member Services Director Central Electric Cooperative The Road to Community Solar.
Brian Ross, Principal, CR Planning, Inc. Local Best Practices for Solar: Planning, Zoning, Permitting 1 Solar Minnesota November 26, 2012.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
CSG Webinar A Look At Community Solar and EECLP. 2.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
1 Rudolph/Libbe Solar. 2 Our Perspective on Solar in Ohio  Ohio has the foundation for rapid solar growth (distributed generation) – Existing electrical.
Creating A Greener Energy Future For the Commonwealth MA State Programs and Policies Meg Lusardi Mansfield, MA June 17, 2009.
CCM ENERGY SOLAR PV CAWPCA November 1, Chapel Street New Haven, CT
1 WHOLESALE ELECTRICITY MARKET AN OVERVIEW By:Ag. Manager, Market Operations.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Talbot County Project Sunburst Talbot County Department of Parks & Recreation Private/Public Partnership July 12,
1 LCFS Electricity Workgroup Meeting Wednesday, July 14, 2010.
AMENDMENT TO THE LIGHT AND POWER RATE ORDINANCE TO INCLUDE AN ECONOMIC DEVELOPMENT RATE FOR QUALIFIED BUSINESSES City Council November 2, 2015 Item 10.
WFEC and Its Rural Electric Cooperative Members Solar Power October 16, 2015 Fall PR-MR & Marketing Meeting.
CICV Solar Workshop. TPO* Laid Out… Service Agreement** Tax Exempt Entities TPO TPO* Finances Builds Owns Operates Maintains Sells output and/or services.
PROCUREMENT PROCEDURES. Procurement Procurement is the process of acquiring goods, supplies and services. It includes: Equipment, spare parts & supplies.
Renewable Energy Act of 2008
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
THE HINGHAM LANDFILL  HMLP regularly receives calls from solar developers inquiring about building solar arrays at the landfill and on Town owned buildings.
Consulting Opportunities in IDB Private Sector Operations.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Solar Electricity Generation: Government Leading by Example in Solar Deployment Federal Environmental Symposium June 5, 2007 U.S. Department of Energy.
1.882 million total persons Most of Northeast States combined would fit in Nebraska geographically 0ver 600,000 persons live in 2 nd District (Omaha area)
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
Renewable energy support schemes in the Republic of Moldova
Professor H. J Annegarn, Ms L Cape
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
PV SOLAR PROJECT OPPORTUNITIES
Photovoltaic Systems Engineering Session 27
Photovoltaic Systems Engineering Session 26
Asset Acquisition Process
City of Lebanon, Missouri Electric Department
Environmental Sustainability Manager
Future Energy Jobs Act: Public Sector Impacts
Metropolitan Mayors Caucus Illinois Energy Bills
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Massachusetts Solar Market RPS Solar Carve-Out II Final Policy Design Mark Sylvia, Commissioner December 13, 2013 Electricity Restructuring Roundtable.
Photovoltaic Systems Engineering Session 22
The Role of Private Sector in Capital Budgeting
Photovoltaic Systems Engineering Session 23
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
PG&E EV Fleet Program.
Information & Market Engagement
PG&E EV Fleet Program.
Small and Micro Purchases
Presentation transcript:

Community Solar

Background Review of Electricity System mandated by Bill 1 – Nov “Our Electricity Future, Nova Scotia’s Electricity Plan” released Nov Plan identifies “A new Community Buildings Solar PV Pilot Program will promote installation of solar panels on community buildings such as town halls, fire halls, and community centres.” Bill 141 (Dec. 2015) grants government the authority to make regulations implementing such a program Regulations to be created after stakeholder consultation

Commitments (from plan) “Projects will be reviewed and approved based on a competitive process” “Power purchase agreements … for the winning community projects” “The program will be capped and controlled to ensure that there are no significant negative impacts on rate stability”

Requirements (from law) Contracts (PPA) awarded based on competitive process overseen by a independent body (Procurement Administrator) Data must be collected and made available The total size of the program will be limited, and limits known, at the outset The program must remain compatible with the rate stability objectives of the electricity plan

Objectives Encourage conversation about, and acceptance of, Solar PV by giving it prominence in the community Gather information on how Solar Electricity fits into the electricity landscape in NS Develop the solar industry in NS

Projects Must be located on the property of an eligible community organization with existing electrical service Roof or ground-mount Ownership of any new solar infrastructure remains with the property owner PPA is signed with the property owner PPA will be standard contract; defined before launch PPA term will be 20 years, fixed price Output data will be made public (Format and method TBD) Project size will be capped (50kW in first year), but no minimum

Application Structure Applications are joint; by an eligible community group and a solar supplier Applications include location, kW, estimated kWh and PPA price, and all estimated installation costs and financing There is not a need for all costs to be recovered by PPA Applications submitted to DOE, qualifying ones forwarded to the Procurement Administrator The Department will do media releases advertising the program and host information sessions as required Solar suppliers are responsible for identifying community partners

Award Procurement Administrator will select winners to fill each annual allotment Allotment not filled can be available for next cycle Winners have 1-year from award to exercise PPA Award based on lowest cost procurement Additional criteria around geographic distribution and potentially entity diversity (e.g. not all Municipalities) Winning bidders and bids will be made public PPA awarded before construction, cost variance risk to be worked out between owner and installer

Interconnection No restrictions on substation Projects cannot share a secondary line or transformer No grid impact study required (because of cap) Subject to normal electrical inspection, building code and all requirements outlined in NSP’s interconnection guideline All interconnection costs borne by installer, not utility (e.g. re-conductoring of secondary service lines, upgrade of service entrance, metering, etc.)

Questions?