CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
University Health Building Thesis Final Presentation
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Hershey Academic Support Center Structural Option Shawn Jones Building Analysis of the Hershey Academic Support Center Hershey, PA Shawn Jones Structural.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
Tom yost BAE/MAE - structural option granby tower norfolk, virginia senior thesis presentation 14 april 2008 introduction overview proposal goals depth.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Structural Systems Design for a Laramie Office Building
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
North Shore Equitable Building
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option

CBD Chemical Production Building Virginia, USA Function/Occupant Type:High Hazard, Chemical Manufacturing Plant Building Statistics Size: Stories: Primary Project Team: Dates of Construction: Cost Information: Project Delivery Method:Design-Bid-Build with a Negotiated Guaranteed Max Contract April 2008 – January 2009 $125 Million Withheld at request of Engineers and Contractors 5 floors, a mezzanine in the first floor, and a penthouse 55,000 GSF N Site Plan

CBD Chemical Production Building Virginia, USA Structural Overview Foundation System 12 inch x12 inch precast piles Tie beams between each column 100-ton capacity each Typical pile cap detail

CBD Chemical Production Building Virginia, USA Structural Overview Floor System 7 ½ inches of normal weight concrete on 3VLI18 roof has 6 inches of normal weight concrete on 3VLI18 12 inch x12 inch precast piles Tie beams between each column 100-ton capacity each Typical pile cap detail Vulcraft 3VLI18 extrusion

N CBD Chemical Production Building Virginia, USA Structural Overview Framing System 12’6”20’0”30’0”20’0” 22’6” 27’6” 30’0” 12’0” 30’0” 7 ½ inches of normal weight concrete on 3VLI18 roof has 6 inches of normal weight concrete on 3VLI18 12 inch x12 inch precast piles Tie beams between each column 100-ton capacity each Typical pile cap detail Vulcraft 3VLI18 extrusion Third floor framing plan

N CBD Chemical Production Building Virginia, USA Structural Overview Framing System 12’6”20’0”30’0”20’0” 22’6” 27’6” 30’0” 12’0” 30’0” Third floor framing plan

N CBD Chemical Production Building Virginia, USA Structural Overview Lateral System 12’6”20’0”30’0”20’0” 22’6” 27’6” 30’0” 12’0” 30’0” Moment frame in both N-S and E-W Odd column rotation Third floor framing plan

CBD Chemical Production Building Virginia, USA Thesis Goals Structural Depth (MAE Requirement) Construction Management Breadth Conclusions Questions / Comments Outline

Thesis Goals Structural Depth (MAE Requirement) Construction Management Breadth Conclusions Questions / Comments Structural Depth Optimize the steel for the same assumptions Design a concrete beam and girder system for these constraints Compare steel and concrete systems Analyze impact on deep foundation system Construction Management Breadth Compare cost of two structural systems Compare schedules of two structural systems A sketchup model of the layout of the one-way slab system.

Structural Depth Optimize the steel for the same assumptions Design a concrete beam and girder system for these constraints Compare steel and concrete systems Analyze impact on deep foundation system Construction Management Breadth Compare cost of two structural systems Compare schedules of two structural systems PV/Electrical Breadth Analyze potential output of photovoltaic panels on roof Size wiring for panels and inverter Cost benefit analysis / payback period MAE Course Material 3D lateral modeling in ETABS from AE 597 A A sketchup model of the layout of the one-way slab system.

Outline Thesis Goals Structural Depth (MAE Requirement) Construction Management Breadth Conclusions Questions / Comments Steel Optimization ¾” shear studs spaced 1‘ o.c. on all beams All beams designed non-compositely Redesign using these shear studs already in place Structural notes from drawings

Steel Optimization ¾” shear studs spaced 1‘ o.c. on all beams All beams designed non-compositely Redesign using these shear studs already in place ∑ = $ 283, ∑ = $ 169, Total Weight Savings: 95,040 lbs Total Cost Savings: $114,156 Original DesignNew Design

Gravity Design Loads Floor Dead Loads above Ground Floor 7½” slab on 2VLI18 Deck (NWC)82 psf Equipment Pads (NWC)50 psf Steel Framing18 psf MEP20 psf Partitions10 psf Total180 psf Roof Dead Load 6” slab on 2VLI18 Deck (NWC)63 psf Equipment Pads (NWC)50 psf Steel Framing18 psf MEP20 psf Roofing4 psf Misc Dead5 psf Total160 psf Live Loads Floor Live Load200 psf Roof Live Load100 psf Gravity Beams N

Gravity Design Loads Gravity Beams 6” slab based on worst beam spacing All beams are 12x22 for constructability Gravity beams use only #6 and #8 bars Controlling load case: 1.2D + 1.6L Concrete framing plan Detailing for gravity beam

Lateral Design Lateral Loads / Recalculation of earthquake loads East-West Wind Loads k kip-ft North-South Wind Loads k kip-ft New Earthquake Loads Design Category C Must use at least Intermediate Moment Frame R value of k kip-ft

ETABS Model 3D extruded view of ETABS model A birds eye view of ETABS model Rigid end zones are applied to all beams with a reduction of 50% The slabs are considered to act as rigid diaphragms All self weights were applied as an additional area mass at the center of gravity of the diaphragms P-∆ effects are considered The moment of inertia for columns = 0.7Ig The moment of inertia for beams = 0.35Ig Lateral Design Lateral Loads / Recalculation of earthquake loads ETABS model

Lateral Design Lateral Loads / Recalculation of earthquake loads ETABS model Lateral design Intermediate Moment Frame Positive moment capacity at supports must be at least 1/3 negative moment capacity Positive and negative moment capacity must be at least 1/5 the maximum moment capacity throughout entire length Concrete framing plan

Detailing for lateral beam Calcs for lateral beam

Column Design All columns are 30x30 for ease of construction Three rebar configurations: (12) #8 (12) #10 (16) #10 Controlling Load Case: 1.2D+1.0W+L+.5S spColumn Output for the columns shaded in purple Concrete framing plan

Lateral Loads / Recalculation of earthquake loads ETABS model Lateral design Drift checks Lateral DesignDrift Checks Wind loads were checked against h/400 Earthquake loads were checked against.015 for category III buildings All drifts acceptable

Lateral Loads / Recalculation of earthquake loads ETABS model Lateral design Drift checks Foundation Impact Lateral DesignFoundation Impact A simplified approach to the number of piles needed for each column. Each pile has a 100-ton capacity

Cost Analysis Cost information for existing structure obtained from Engineers Detailed concrete, formwork, and reinforcement takeoffs were done by hand RS Means used to obtain unit prices for concrete structure Comparison of steel versus concrete cost performed Outline Thesis Goals Structural Depth (MAE Requirement) Construction Management Breadth Conclusions Questions / Comments Original Cost Estimate provided by project engineer Sum = $5,197,429 Estimated Cost of Concrete Structure

Cost Analysis Cost information for existing structure obtained from Engineers Detailed concrete, formwork, and reinforcement takeoffs were done by hand RS Means used to obtain unit prices for concrete structure Comparison of steel versus concrete cost performed Original Cost Estimate provided by project engineer Sum = $5,197,429 Estimated Cost of Concrete Structure Concrete is $ 1,266, cheaper

Schedule Analysis Schedule Information from RS Means One schedule made for each structural system Concrete schedule took 107 days while steel took 223 days Saving over a hundred days may justify the more expensive structure Concrete ScheduleSteel Schedule

Outline Thesis Goals Structural Depth (MAE Requirement) Construction Management Breadth Conclusions Questions / Comments Conclusions The concrete redesign is a viable solution The concrete system is significantly cheaper A longer construction schedule does pose a significant loss in income for CBD Chemical

Outline Thesis Goals Structural Depth (MAE Requirement) Construction Management Breadth Conclusions Questions / Comments

N CBD Chemical Production Building Virginia, USA Structural Overview Framing System 12’6”20’0”30’0”20’0” 22’6” 27’6” 30’0” 12’0” 30’0” 7 ½ inches of normal weight concrete on 3VLI18 roof has 6 inches of normal weight concrete on 3VLI18 12 inch x12 inch precast piles Tie beams between each column 100-ton capacity each

Steel Optimization ¾” shear studs spaced 1‘ o.c. on all beams All beams designed non-compositely Redesign using these shear studs already in place ∑ = $ 283, ∑ = $ 169, Total Weight Savings: 95,040 lbs Total Cost Savings: $114,156 Original DesignNew Design

Gravity Design Loads Floor Dead Loads above Ground Floor 7½” slab on 2VLI18 Deck (NWC)82 psf Equipment Pads (NWC)50 psf Steel Framing18 psf MEP20 psf Partitions10 psf Total180 psf Roof Dead Load 6” slab on 2VLI18 Deck (NWC)63 psf Equipment Pads (NWC)50 psf Steel Framing18 psf MEP20 psf Roofing4 psf Misc Dead5 psf Total160 psf Live Loads Floor Live Load200 psf Roof Live Load100 psf Gravity Beams

Gravity Design Loads Gravity Beams 6” slab based on worst beam spacing All beams are 12x22 for constructability Gravity beams use only #6 and #8 bars Controlling load case: 1.2D + 1.6L

Lateral Design Lateral Loads / Recalculation of earthquake loads East-West Wind Loads k kip-ft North-South Wind Loads k kip-ft New Earthquake Loads Design Category C Must use at least Intermediate Moment Frame R value of k kip-ft

Lateral Design Lateral Loads / Recalculation of earthquake loads ETABS model Lateral design

Column Design All columns are 30x30 for ease of construction Three rebar configurations: (12) #8 (12) #10 (16) #10 Controlling Load Case: 1.2D+1.0W+L+.5S spColumn Output for the columns shaded in purple Concrete framing plan

Lateral Loads / Recalculation of earthquake loads ETABS model Lateral design Drift checks Lateral DesignDrift Checks Wind loads were checked against h/400 Earthquake loads were checked against.015 for category III buildings All drifts acceptable

Lateral Loads / Recalculation of earthquake loads ETABS model Lateral design Drift checks Foundation Impact Lateral DesignFoundation Impact A simplified approach to the number of piles needed for each column. Each pile has a 100-ton capacity

Cost Analysis Cost information for existing structure obtained from Engineers Detailed concrete, formwork, and reinforcement takeoffs were done by hand RS Means used to obtain unit prices for concrete structure Comparison of steel versus concrete cost performed Original Cost Estimate provided by project engineer Sum = $5,197,429 Estimated Cost of Concrete Structure Concrete is $ 1,266, cheaper

Schedule Analysis Schedule Information from RS Means One schedule made for each structural system Concrete schedule took 107 days while steel took 223 days Saving over a hundred days may justify the more expensive structure Concrete ScheduleSteel Schedule