HFIP Regional Ensemble Call Audio = Passcode = 13677# Meeting ID = June 2012
Today’s Agenda Product Update (Mark DeMaria) Display Update (Paula McCaslin) Ensemble Update (Brian Etherton) HFIP Regional Ensemble Call
HFIP Ensemble Product Subgroup Update on Prototype Products Mark DeMaria May 14, 2012 Conference Call 3
2 Prototype Ensemble Products Planned for Aug. 1, Genesis ensembles from global models T. Marchok lead (GFDL) Development continuing 2.Hybrid dynamical-statistical wind speed probabilities A. Schumacher, M. DeMaria (co-leads) Arrangements made to have ensemble tracks/intensities pushed to CIRA from GFDL Script being developed at CIRA for real time runs Coordination needed with Paula to post products on HFIP web page 4
HFIP Ensemble Display Subgroup Update on HFIP Web Page Paula McCaslin June 18, 2012 Conference Call 5
HFIP Ensemble Subgroup Update on Realtime 2012 Ensemble Brian Etherton June 18, 2012 Conference Call 6
Formal work to be an EMC/GSD effort, running on S-JET, for summer 20-member ensemble, ‘basin-scale’ 27km domain Forecast length=120hr at 00Z and 12Z, 9hr at 06Z and 18Z Use GEFS for IC/BC, add on smaller scale perturbations via dynamical downscaling / cycling method Hope to tap into products work Future years aim for multi-physics ensemble, as well as higher resolution Start from EMC scripting set (Zhan Zhang), with GSD modifications to incorporate small scale perturbations HFIP Regional Ensemble
Meeting summaries/presentations to be located here: Next Call Tentatively scheduled for Monday, July 16 th, at 11AM Pacific, Noon Mountain, 1PM Central, 2PM Eastern (Standard Time) Speakers… likely the three subgroup leads HFIP Regional Ensemble Call