1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.

Slides:



Advertisements
Similar presentations
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Installation of the T600 at Fermilab CSN2, September 22,
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
BNL MAGNET TEST FACILITY FOR MQXF Q1/Q3
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
S A Griffiths CM42 June 2015 Electrical & Control.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
WP High Beta Cavities Delivery
Teleconf ACS – FREIA 28th March 2017
Cryoplant Controls Installation
Teleconference ACS – FREIA 31th May 2017
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
2K Cold Box FDR Introduction
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Mike Anerella December 17, 2013
FRIB Cryogenic Support
Teleconference ACS – FREIA 17th October 2017
LARP Vertical Test Facility
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
Teleconference ACS – FREIA 20th February 2018
Compressor Cabinet Design & Interface Diane Hascall Integration Engineer Joint Technical Meeting 2017 March 6, 2017.
LARP Rotatable Collimators for LHC Phase II Collimation
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
Presentation transcript:

1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016

2 Outline Cryogenic Infrastructure Update Power Supply & Controls Test dewar Schedule to Completion

3 Outline Cryogenic Infrastructure Update

4 Cryo Infrastructure I - Sullair 500 (backup compressor) Installation All electrical & plumbing installations are complete Waiting for turn-on Surplus funds approved for use in commissioning helium dirty gas purifier system (Linde contract) Note: all work is “off-project” (not funded by LARP)

5 Cryo Infrastructure II – Nash Pump recommissioning Initial installation / testing Complete Additional sensors being added for remote automatic control programming to be completed (PJ)

6 Outline Power Supply & Controls

7 Power Supply & Controls Status 24KA IGBT Switch: Assembled and installed new three layer snubber circuit. This circuit configuration will be tested starting this week Cabinet mods to be completed after testing 24KA water cooled cables : Finished DI water cooling circuit, installed drain outlet and verified flow (>18GPM) and pressure drop. Finished hardware and software debugging of the new Lab View based Inline Helium purifier and its associated valve system. Installed and started wiring 144 channel variable gain isolation amplifier in the Dewar area. Helium Recovery compressor: Retrieved vendor programmed ladder logic code for modification and addition of remote control logic. Test setup Final config IGBT Switch

8 Outline Test Dewar

9 Test Dewar Status p.1 Heat Exchanger Assembly All parts received: Weka control valve Order placed, delivery 2/19/16 3/28/16 valve body only. Controller and positioner to follow (2K heat exchanger P.O. delayed ~ 11 weeks due to T&C’s, later placed in 2 days through a Small Business intermediary; delivery 2/22/16 3/23/16) Balance of parts ordered, delivery 3/4/16 3/28/16 ASSEMBLY TO START THIS WEEK

10 Test Dewar Status p.2 Helium Dewar & Outer 4K Heat Shield Promised delivery date 4/6/16 for helium vessel & heat shield – critical path Latest promised delivery 5/7/16 4/29/16 Engineering & QA visited Ability 3/15/16 Reviewed technical details, process, schedule Accepted, documented vendor suggestion for improved weld configuration at end dome Received (& later approved) welder certifications Latest issue – dome delivered from subcontractor with dent – investigating use (BNL), replacement from 2 nd vendor (Ability) (very tight to need date in G. Ambrosio schedule) 2/10/16 - Contract placed with Ability Engineering:

11 Test Dewar Status p.3 Lambda Plate lambda plate detail parts fab work order in place - delivery date 3/15/16 4/8/16 (G-10 disc P.O.; trying to improve with O/T$) Note: Still need final info on instrumentation wires, connectors, etc. (MQXF & Mirror)

12 Test Dewar Status p.4 Top Hat Assembly top hat detail parts Work order approved Material being ordered, some final drawings still to be delivered Projected delivery 3/31/16 5/2/16 (top hat – investigating expediting)

13 Schedule To Completion 6/6/16 Commissioning Completion still agrees with latest LARP Mirror Test Schedule but Zero float

14 Test Facility Commissioning 3 week duration, i.e., “plan for success (no delays) Some details to be worked out (electrical load, (Styrofoam?) fill of dewar, etc.)