CERN 1 DataGrid Architecture Group Bob Jones CERN.

Slides:



Advertisements
Similar presentations
24-May-01D.P.Kelsey, GridPP WG E: Security1 GridPP Work Group E Security Development David Kelsey CLRC/RAL, UK
Advertisements

Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
5-Dec-02D.P.Kelsey, GridPP Security1 GridPP Security UK Security Workshop 5-6 Dec 2002, NeSC David Kelsey CLRC/RAL, UK
Stephen Burke - WP8 Status - 14/2/2002 Partner Logo WP8 Status Stephen Burke, PPARC/RAL.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
GridPP Presentation to PPARC Grid Steering Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting,
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
ATF Progress Report 8/3/2001 Steve Fisher / RAL. 8 March 2001ATF report - Steve Fisher/RAL2 Who are the ATF Francesco Giacomini – WP1 Wolfgang Hoschek.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
Pilot and Proposal for a European Remote Access Network David Schiller (IAB) Data without Boundaries (DwB) - WP4 workshop before NTTS Brussels, 4. March.
Thoughts on the ATF of the DataGrid 24 th –25 th May 2001 Steve Fisher / RAL.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
CERN Technical Coordinators Report PTB, 3 rd July 2002 Bob Jones.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
QCDGrid Progress James Perry, Andrew Jackson, Stephen Booth, Lorna Smith EPCC, The University Of Edinburgh.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
Grid Workload Management Massimo Sgaravatto INFN Padova.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
GridPP Collaboration meeting Manchester 9/10 May 2002 P.Clarke Resource Management: Instruments and Procedures Testbed Rollout: Development of Plan Education.
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
InterGrid Meeting 7 Oct 2001 Tony Doyle. Tony Doyle - University of Glasgow GridPP Status  Financial Background  Deliverables  Recruitment  Regional.
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
10-May-01D.P.Kelsey, Security Workshop Summary1 DataGrid Security Workshop 29/30 March 2001 SUMMARY David Kelsey CLRC/RAL, UK
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
Andrew McNabSecurity Middleware, GridPP8, 23 Sept 2003Slide 1 Security Middleware Andrew McNab High Energy Physics University of Manchester.
Software Release Procedure Session MANAGEMENT and FUTURE directions Form ongoing ‘empowered’ Technical Discussion Group (TDG) Any future project definitions(resources.
CERN, DataGrid PTB, April 10, 2002 CrossGrid – DataGrid Collaboration (Framework) Marian Bubak and Bob Jones.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
Report from DataGrid Technical Board Massimo Sgaravatto INFN Padova.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK
Andrew McNab - Manchester HEP - 10 May 2001 EDG / Globus Meeting, 5-7 April “Obtaining an up-to-date understanding of the state of the Globus Toolkit,
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
Plans for D7.7 The Security Report on the Final Project Release Linda Cornwall, RAL.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
WP10 Goals and accomplishments from WP10 point of view J. Montagnat, CNRS, CREATIS V. Breton, CNRS/IN2P3 DataGrid Biomedical Work Package.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
Dave Newbold, University of Bristol21/3/2001 (Short) WP6 Update Where are we? Testbed 0 going (ish); some UK sites being tried out for production (mostly.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
JRA1 Middleware re-engineering
Massimo Sgaravatto INFN Padova
Bob Jones EGEE Technical Director
EGEE Middleware Activities Overview
DataGrid Quality Assurance
EO Applications Parallel Session
JRA1 (Middleware) Overview
Fabric and Storage Management
Presentation transcript:

CERN 1 DataGrid Architecture Group Bob Jones CERN

Jan EU DataGrid - Architecture Group 2 Background l Architecture Task Force (ATF) German Cancio, CERN Steve M. Fisher, RAL (chair) Tim Folkes, RAL Francesco Giacomini, INFN Wolfgang Hoschek, CERN Dave Kelsey, RAL Brian L. Tierney, LBL/CERN 2 versions ( March & July 2001) of the architecture document drafted active until PM9 - emphasis then shifted to testbed 1 l D12.4 deliverable (PM12) New architecture document written based on ATFv2 and individual WP architecture/design documents

CERN Jan EU DataGrid - Architecture Group 3 Some Lessons learnt from testbed 1 & D12.4 l Some concepts remain vague e.g. what do we really mean by interactive jobs? l Some boundaries are unclear Between components and between work-packages e.g. are we certain about the scope/functionality of a Storage Element? l Some requirements are not addressed e.g. anonymous users l The various software components are not yet fully integrated e.g. do the Storage Elements, Computing Elements & Information System work in unison? l Need better links with the application groups and sw integrators Ensure priorities are addressed and a deployable architecture is defined l Short term/ Long term trade-offs Need to satisfy the short-term needs of the testbed without jeopardizing future directions e.g. do we patch code now that we know will be replaced in the next release?

CERN Jan EU DataGrid - Architecture Group 4 Mandate Modify D12.4 to clarify then rationalise the interfaces & dependencies of the different components with a view to the requirements for testbed 2 Take into account: Reviewers comments We currently don’t have answers to all the questions asked Experiences from testbed 1 Applications (D8.2) & integrators (D6.4) Future directions in underlying toolkits e.g. Globus developments, & Grid Open Services Architecture Changing requirements from the Application Groups e.g. move towards common higher-level interface Look for convergence with architectures being proposed for other related Grid projects e.g. PPDG/GriPhyN to enable inter-operability

CERN Jan EU DataGrid - Architecture Group 5 Proposed Composition Technical coordinator (chair) Middleware: WP1, WP2, WP3, WP4, WP5 Networking: WP7 Integration & deployment: WP6 Security: AAA Applications: WP8, WP9, WP10 Consultants grid gurus and architects from related Grid projects Total: ~15 members

CERN Jan EU DataGrid - Architecture Group 6 Organisation l Members names to be finalised this week l First meeting on Thursday 7 th March in Paris l Subsequent meetings approximately 1 per month l Participants will be expected to work outside the meetings Consult with WP colleagues to assure information flow Prepare material for the meetings and D12.4 document Discuss with architecture group colleagues