Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

6. Material Requirements Planning (MRP)
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
21–1. 21–2 Chapter Twenty-One Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
MRP and ERP Chapter 12.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
MRP, MRP II, and ERP.
 You should be able to: 1. Describe the conditions under which MRP is most appropriate 2. Describe the inputs, outputs, and nature of MRP processing 3.
Chapter 12 MRP and ERP.
Material Requirements Planning
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
MRP and ERP Chapter 12 MIS 373: Basic Operations Management
Adeyl Khan, Faculty, BBA, NSU. Material requirements planning (MRP)  Computer-based information system that translates master schedule requirements for.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Materials Requirements Planning
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
MRP.
Material Requirements Planning
CHAPTER 12 MRP and ERP H.W.: 2,6,8, and 17..
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
Material Requirements Planning (MRP) and ERP
Resource Planning Chapter 15.
Materials Requirements Planning
1 MRP AND ERP Chapter 12 MIS 373: Basic Operations Management Additional content from Jeff Heyl and L. Beril Toktay.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 14 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Chapter 13 MRP and ERP.
SISTEM INFORMASI ENTERPRISE
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
BUAD306 MRP/ERP.
Chapter 16 Materials Requirements Planning
MRP and ERP.
CHAPTER 14 MRP and ERP.
Chapter 12 MRP and ERP McGraw-Hill/Irwin
MRP and ERP.
14 MRP and ERP.
Production and Operations Management
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs, outputs, and nature of MRP processing 3.Explain how requirements in a MPS are translated into material requirements for lower-level items 4.Discuss the benefits and requirements of MRP 5.Explain how an MRP system is useful in capacity requirements planning 6.Outline the potential benefits and some of the difficulties users have encountered with MRP 7.Describe MRPII and its benefits 8.Describe ERP, what it provides, and its hidden costs 12-1

Independent and Dependent Demand Independent Demand A B(4) C(2) D(2)E(1) D(3) F(2) Dependent Demand Independent demand is uncertain. Dependent demand is certain.

Dependent Demand Instructor Slides Dependent demand – Demand for items that are subassemblies or component parts to be used in the production of finished goods. – Once the independent demand is known, the dependent demand can be determined. – Dependent demand tends to be sporadic or “lumpy” Large quantities are used at specific points in time with little or no usage at other times 12-3

Dependent vs Independent Demand Instructor Slides 12-4

MRP Material requirements planning (MRP): – A computer-based information system that translates master schedule requirements for end items into time-phased requirements for subassemblies, components, and raw materials. – The MRP is designed to answer three questions: 1.What is needed? Type 2.How much is needed? quantity 3.When is it needed? time Instructor Slides 12-5

Overview of MRP Instructor Slides 12-6

MRP MRP begins with a schedule for finished goods that is converted into a schedule of requirements for the subassemblies, component parts, and raw materials needed to produce the finished items in the specified time frame.

MRP Inputs: Master Schedule Instructor Slides Master schedule: – One of three primary inputs in MRP; states which end items are to be produced, when these are needed, and in what quantities. – Managers like to plan far enough into the future so they have reasonable estimates of upcoming demands – The master schedule should cover a period that is at least equivalent to the cumulative lead time – Cumulative lead time » The sum of the lead times that sequential phases of a process require, from ordering of parts or raw materials to completion of final assembly. 12-8

Cumulative Lead Time Instructor Slides 12-9

MRP Inputs: Bill of Materials Bill of Materials (BOM) – A listing of all of the assemblies, subassemblies, parts, and raw materials needed to produce one unit of a product – Product structure tree A visual depiction of the requirements in a bill of materials, where all components are listed by levels Instructor Slides 12-10

Low-Level Coding Instructor Slides Low-level coding – Restructuring the bill of material so that multiple occurrences of a component all coincide with the lowest level at which the component occurs Level 3 Level 2 Level 1 Level 0 XB(2)D(3)E(4)ECE(2)F(2) 12-11

Example: product structure tree diagram An end item X is composed of two Bs and one C. moreover, each B requires three Ds and one E, and each D requires four Es. Similarly, each C is made up of two Es and two Fs. The items at each level are components of the next level up and, as in a family tree, are parents of their respective components. The available inventory on hand of each items B, C, D, and E are 4, 10, 8, and 60 respectively. Note that the quantities of each item in the product structure tree refer only to the amounts needed to complete the assembly at the next higher level. Use this information to do the following: a.Draw the product tree diagram b.Determine the quantities of B, C, D, E, and F needed to assemble one unit of X c.Determine the quantities of these components that will required to assemble 10 Xs, taking into account the quantities on hand of various components

Solution: tree diagram X B(2) C D(3) E E(4) E(2)F(2) B: 2 C: 1 D: 2 ×3 = 6 E: 4 ×3 ×2 + 1 ×2 +2 ×1 = 28 F: 2

Solution: tree diagram X B(2) C D(3) E E(4) E(2)F(2) B: 2 ×10=20 - 4=16 C: 1 ×10 = = 0 E: 1 × 16 = 16 D: 3 ×16 = = 40 E: 4 × 40 = 160 – 60 = 100 B: 16 C: 0 D: 40 E: 116 F: 0

MRP Inputs: Inventory Records Instructor Slides Inventory records Includes information on the status of each item by time period, called time buckets Information about – Gross requirements – Scheduled receipts – Expected amount on hand Other details for each item such as – Supplier – Lead time – Lot size policy – Changes due to stock receipts and withdrawals – Canceled orders and similar events 12-15

Assembly Time Chart Instructor Slides 12-16

MRP Processing MRP processing takes the end item requirements specified by the master schedule and explodes them into time-phased requirements for assemblies, parts and raw materials using the bill of materials offset by lead times. The quantities that are generated by exploding the bill of materials are gross requirements; they don’t take into consideration any inventory that is currently on hand or due to be received. The materials that a firm must actually acquire to meet the demand generated by the master schedule are the net material requirements which is calculated as the gross requirements minus the projected inventory plus a safety stock.

MRP Record Instructor Slides Gross requirements Total expected demand Scheduled receipts Open orders scheduled to arrive Projected on hand inventory Expected inventory on hand at the beginning of each time period Week Number Gross Requirements Scheduled Receipts Projected on hand Net requirements Planned-order-receipt Planned-order release 12-18

MRP Record Instructor Slides Week Number Gross Requirements Scheduled Receipts Projected on hand Net requirements Planned-order-receipt Planned-order release Net requirements Actual amount needed in each time period Planned-order receipts Quantity expected to be received at the beginning of the period offset by lead time Planned-order releases Planned amount to order in each time period 12-19

MRP: Development The MRP is based on the product structure tree diagram Requirements are determined level by level, beginning with the end item and working down the tree – The timing and quantity of each “parent” becomes the basis for determining the timing and quantity of the “children” items directly below it. – The “children” items then become the “parent” items for the next level, and so on Instructor Slides 12-20

Example: MRP Processing A firm that produces wood shutters and bookcases has received two orders for shutters: one for 100 shutters and one for 150 shutters. The 100-unit order is due for delivery at the start of week 4 of the current schedule, and the 150-unit order is due for delivery at the start of week 8. each shutter consists of two frames and four slatted wood sections. The wood sections are made by the firm, and fabrication takes one week. The frames are ordered, and lead time is two weeks. Assembly of the shutters requires one week. There is a scheduled receipt of 70 wood sections in (i.e., at the beginning of) week1. determine the size and timing of planned-order releases necessary to meet delivery requirements under each of these conditions: 1.lot-for-lot ordering (i.e., order size equal to net requirements) 2.Lot-size ordering with a lot size of 320 units for frames and 70 units for wood sections.

Example MRP Shutter Frames (2) Wood sections (4) Instructor Slides 12-22

Solution: MRP Processing a. Develop a master schedule: Week number Quantity b. Develop a product structure tree Shutter Frames (2) Wood sections (4) c. Using the master schedule, determine gross requirements for shutters. Next compute net requirements

Example MRP Instructor Slides 12-24

Example MRP Instructor Slides 12-25

Using the MRP Instructor Slides Pegging – The process of identifying the parent items that have generated a given set of material requirements for an item 12-26

Updating the System Instructor Slides An MRP is not a static document – As time passes Some orders get completed Other orders are nearing completion New orders will have been entered Existing orders will have been altered – Quantity changes – Delays – Missed deliveries 12-27

MRP Outputs: Primary Instructor Slides Primary Outputs – Planned orders A schedule indicating the amount and timing of future orders – Order releases Authorizing the execution of planned orders – Changes Revisions of the dates or quantities, or the cancellation of orders 12-28

MRP Outputs: Secondary Instructor Slides Secondary Outputs Performance-control reports Evaluation of system operation, including deviations from plans and cost information – e.g., missed deliveries and stockouts Planning reports Data useful for assessing future material requirements – e.g., purchase commitments Exception reports Data on any major discrepancies encountered – E.g., late and overdue orders, excessive scrap rates, requirements for nonexistent parts 12-29

Other MRP Considerations: Lot Sizing Rules Lot-for-Lot (L4L) ordering – The order or run size is set equal to the demand for that period – Minimizes investment in inventory – It results in variable order quantities – A new setup is required for each run Economic Order Quantity (EOQ) – Can lead to minimum costs if usage of item is fairly uniform This may be the case for some lower-level items that are common to different ‘parents’ Less appropriate for ‘lumpy demand’ items because inventory remnants often result Fixed Period Ordering – Provides coverage for some predetermined number of periods Instructor Slides 12-30

Other MRP Considerations: Safety Stock Safety Stock – Theoretically, MRP systems should not require safety stock – Variability may necessitate the strategic use of safety stock A bottleneck process or one with varying scrap rates may cause shortages in downstream operations Shortages may occur if orders are late or fabrication or assembly times are longer than expected When lead times are variable, the concept of safety time is often used – Safety time » Scheduling orders for arrival or completions sufficiently ahead of their need that the probability of shortage is eliminated or significantly reduced Instructor Slides 12-31

MRP in Services Food catering service – End item  catered food – Dependent demand  ingredients for each recipe, i.e., bill of materials Hotel renovation – Activities and materials “exploded” into component parts for cost estimation and scheduling Instructor Slides 12-32

MRP Benefits Instructor Slides Enables managers to easily – determine the quantities of each component for a given order size – To know when to release orders for each component – To be alerted when items need attention Additional benefits – Low levels of in-process inventories – The ability to track material requirements – The ability to evaluate capacity requirements – A means of allocating production time – The ability to easily determine inventory usage via backflushing – Exploding an end item’s BOM to determine the quantities of the components that were used to make the item 12-33

MRP Requirements Instructor Slides To implement an effective MRP system requires: – A computer and the necessary software to handle computations and maintain records – Accurate and up-to-date Master schedules Bills of materials Inventory records – Integrity of data files 12-34