Cleaning up the Lower Fox River Greg Hill, Wisconsin DNR Winnebago Project University of Wisconsin Oshkosh, May 23, 2008.

Slides:



Advertisements
Similar presentations
PCBs Total Maximum Daily Loads San Francisco Bay Fred Hetzel SFB-RWQCB May 13, 2003.
Advertisements

Anthropogenic Contamination of the Lower Fox River, WI Alyssa Offutt UT Austin, EWRE Masters Candidate GIS in Water Resources Section 2 12/4/2012.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
The Fox River Cleanup Project What boaters & anglers should know.
Fox River Cleanup Overview Project Participants  Responsible Parties (RPs) – NCR– Arjo Wiggins / Appleton Papers Inc. – PH Glatfelter– US Mills.
Cleaning Wisconsin’s Waters: From Command and Control to Collaborative Decision Michael Kraft Public and Environmental Affairs UW-Green Bay Prepared for.
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
The Fox River Cleanup Project What boaters & anglers should know.
Presentation to: Technical Advisory Committee Onondaga Lake.
Warm Up Think about where water comes from. Is there more or less water on Earth than there was 1 billion years ago?
Location : a small lake situated about 10 kilometers downstream of a paper-mill Paper-mill handled the recycling of waste paper containing PCBs How serious?
TOXIC WASTE AND HUMAN HEALTH Objectives: 1. Become aware of some of the problems which have come from the technology that produces our high standard of.
Iron Mountain Mine California Acid Mine Drainage Discharge Stuart Gaunt Guy Laurie.
Section 1: Water Resources
PCBs- ‘Put Care Back’ (Report On The Hudson River Scandal) By: Jonathan Webb November 25, 2003.
Muskegon Wastewater Treatment Facility
Warm Up Think about where water comes from. Is there more or less water on Earth than there was 1 billion years ago?
Spokane River PCB Source Assessment Washington State Department of Ecology Spokane River Forum May
Aquatic Plants and the Environment (SWES, ECOL, WFSc 474/574)
The Hudson River PCB Problem
The Work of Streams. Erosion Usually happen by streams flowing through their channels and lifting loose particles by abrasion, grinding, and by dissolving.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Mark Richards Virginia Department of Environmental Quality What’s in Your Water? A Discussion of Threats to Virginia’s Water Quality William & Mary School.
Fresh Water. Rivers What Is Erosion? Erosion is the process by which soil and sediment are transported from one location to another. Water and Erosion.
Cleaning up the Hudson Andrew Brown. The Hudson River Official Source- Lake Tear in the Clouds in Adirondack Mountains Official Source- Lake Tear in the.
Polychlorinated biphenyl (PCB) Pollution of the Hudson River Marka Latif 10/18/13 Life Science Class.
Making Waste Productive. Creating Energy from Waste.
ENVIRONMENTAL SAFETY – SPILL MANAGEMENT TRAINING August 2009.
Water Quality Environmental Science Mr. Mead Environmental Science Mr. Mead.
Water Sources and Pollution. Where does our water come from? It comes from 2 sources: 1.Surface water: above ground in lakes and rivers. –Most large cities.
Ross MacNames Edward Jackson Samantha Quiroga.  Elevated levels of Polychlorinated Biphenyls (PCBs) found in sediment of the Little Brazos River
A Hazardous Waste Site PCB Contamination. Polychlorinated Biphenyls (PCBs) Man-made class of oil-like chemicals used in the manufacture of electrical.
BACKRIVER TMDL PROJECT Technical Outreach Prepared by MDE/TARSA Prepared for the Baltimore Harbor Stakeholder Advisory Group September 10, 2002.
Section 3: Mining Regulations and Mine Reclamation
Fishing Advisories and Fish Contaminants EEES 4730 Amanda Wendzicki.
Cleanup and Remediation of Persistent Bioaccumulative Toxics in the Great Lakes Basin Gina Bayer, CH2M HILL PBT Strategy Team Maumee Bay Meeting February.
DRAFT Spokane River Regional Task Force Members of the community, stewards of the river 6/4/2016srrttf.org1.
SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.
Polychlorinated Biphenyls (PCBs)
Chapter 11 Section 3 Water Pollution Environmental Science Spring 2011.
Freshwater and Society Module 1, part C. Developed by: Updated: U?-m1c-s2 Water quality degradation
Today’s Topics Hartford Iron site assessment Cleanup to date Cleanup steps to come What can you do.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
WaterSection 1 Chapter 11 Water Section 1: Water Resources.
SUCTION DREDGE OPERATION
Pollution Investigation 1. Please complete the “Participant Card” 2.
Water Distribution. The Water Cycle Water is essential to life on Earth. Humans can live for more than month without food, but we can live for only a.
goldentigers.org Snake River Exhibit A Water Flow Rate (No EPA Standard) Fish Kill Provided By: Consulting Scientists and Engineers M J J A S O N D J.
Combining prediction and monitoring for reduction of toxics: the Lake Michigan Mass Balance Study Glenn Warren, Russell Kreis, and Paul Horvatin U.S. EPA,
WaterSection 1 Water Resources Water is essential to life on Earth. Humans can live for more than month without food, but we can live for only a few days.
Organic Chemicals and Water. Synthetic Organic Chemicals Dioxins Pesticides PCBs Cleaning agents Chlordane Dioxin PBDE DDT Organochlorines Flame Retardants.
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
Chapter 6. Where is our water? Water Cycle Evaporation from the ocean and other water sources Precipitation over the ocean and land Water runs from high.
Environmental Science  Mid-1800s, 25,000 people living along the River Thames in London died of cholera  River was declared “dead” by 1950  Walk.
Water. Section 1: Water Resources Objectives: Describe the _____________of Earth’s water resources. Explain why _________ water is one of Earth’s limited.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Water Chapter 11. Water Resources Section 11.1 Water is essential to life on Earth. Humans can live for more than month without food, but we can live.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Section 3: Mining Regulations and Mine Reclamation
Can kill fish and other wildlife
Section 3: Mining Regulations and Mine Reclamation
Section 3: Mining Regulations and Mine Reclamation
Section 3: Mining Regulations and Mine Reclamation
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Section 3: Mining Regulations and Mine Reclamation
The Work of Streams.
3.1Process selection and the treatment process train
Presentation transcript:

Cleaning up the Lower Fox River Greg Hill, Wisconsin DNR Winnebago Project University of Wisconsin Oshkosh, May 23, 2008

Fox River Background The Lower Fox River is Wisconsin’s largest tributary to Lake Michigan Flows northeast about 40 miles from Lake Winnebago to Green Bay Once called “the hardest working river in the world” because of heavy use by industry Industry brought positive economic effects and some negative environmental effects

Pollution in the Fox River Paper mill discharge into Little Lake Butte des Mortes, 1973

Where Did PCBs Come From? Paper companies used PCBs in carbonless copy paper About 700,000 pounds of PCBs were discharged into the river from EPA outlawed PCBs in 1971, but they remain in river sediment DNR estimates over 64,000 pounds of PCBs are in Fox River sediment today

The Problem with PCBs Small river organisms eat sediment with PCBs PCBs accumulate in fatty tissue and get passed up the food chain PCBs cause wildlife deformities immune system and reproductive problems developmental delays possibly cancer

Demonstration Projects Two demonstration projects conducted to evaluate full-scale sediment dredging and disposal on the Fox River Locations Deposit N, upstream of Kimberly lock and dam Sediment Management Unit (SMU) 56/57, below De Pere Dam Showed dredging to be safe and effective and removed some contaminated sediment

Moving Forward with the Cleanup

Cleanup Activities at OU1 Cleanup work at OU1 (Little Lake Butte des Mortes) began in Summer 2004 Expected to take 3-6 years Cleanup site is on west shore of lake, near U.S. Highway interchange P.H. Glatfelter and WTM I are designing, carrying out and paying for the cleanup in this part of the river

The Cleanup Process Hydraulic dredge guided by GPS system removes sediment from riverbed where PCB concentration is 1 ppm or greater

The Cleanup Process Dredged sediment travels through underwater pipeline to on-shore “geotubes” made of material that allows water out but holds the sediment in.

Partially filled geotubes with clamp valves to regulate in- flow of dredged sediment

The Cleanup Process Water is treated with dissolved air floatation, sand filtration, and granulated active carbon filtration (picture of main filtration tank)

The Cleanup Process When sediment is dewatered (dried), geotubes are loaded into lined trucks with backhoe and transported to landfill

Truck loaded with dried sediment; note the liner and cap that cover sediment during transport

Trucks and all other equipment that come in contact with dried sediment are pressure washed before leaving the site (and at the landfill)

Activities at OUs 2-5 Final cleanup plan for OUs 2-5 (from Appleton Dam to Green Bay) is being designed by Georgia-Pacific and NCR Corporation Extensive sampling and testing was done in 2004 and 2005 and is the basis of final plan that is being developed The plan allows capping to replace part of the dredge area Cleanup work began in 2007 and will take about 12 years to complete

Phase 1 Project  Hot spot in the river’ down stream of the DePere Dam  140,000 cubic yards  Dredging was completed in 2007

Water and Sediment and Fish Sampling in Progress

The Big Show  Final Design being completed  Shoreline processing site being built  Contracts being developed/signed for dredging and disposal  Start-Up May 2009

With continued cooperation, we can look forward to a healthy Fox River future