Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.

Slides:



Advertisements
Similar presentations
TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.
Advertisements

Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
NLC – The Next Linear Collider Project Colorado Univ. - Boulder Calorimetry-Arlington Calorimetry Detector Study Plans at Colorado Uriel Nauenberg for.
Gary Feldman P5 Meeting 21 February The NO A Experiment P5 Meeting SLAC 21 February 2008 Gary Feldman.
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
Leon Mualem — NNN07 The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Workshop on Next Generation.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
The Status of the NOvA Experiment Sarah Phan-Budd Argonne National Laboratory Miami 2011 December 16, 2011.
NO A goals & physics NO A goals & physics NO A sites & detectors NO A sites & detectors NO A now & future NO A now & future.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
Progress with the Off-axis Experiment LoI and PAC Response Ongoing detectors R&D Simulation efforts Sites UCL meeting Next steps.
Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
NO A Experiment Jarek Nowak University of Minnesota For NOvA Collaboration.
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Sarah Phan-Budd, TIPP Construction of PVC Extrusions for NO A Near and Far Detectors Sarah Phan-Budd Argonne National Lab On Behalf of the NO A.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Extrusion Modules – The Active Detector Ken Heller University of Minnesota Talks by: Tom Chase – Progress on End Seals and Leak Detection QA Alex Smith.
Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The NO A Experiment Gary Feldman Harvard University Survey.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Fermilab Users’ Meeting 2009.
 Leslie Camilleri CERN, PH November 23, NO A is a Long Baseline experiment using the NUMI beam from Fermilab Now being used for MINOS (732km)
Long Baseline Experiments at Fermilab Maury Goodman.
The NOvA Experiment Ji Liu On behalf of the NOvA collaboration College of William and Mary APS April Meeting April 1, 2012.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
,,,,, The Daya Bay Reactor Neutrino Experiment Liangjian Wen On behalf of the Daya Bay Collaboration Institute of High Energy Physics Daya Bay Detectors.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Harvard Neutrino Group DoE Review August 21, 2006.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
NOvA in light of non-zero θ 13 Gavin S. Davies Iowa State University for the NOvA Collaboration nuTURN Workshop Laboratori Nazionali del Gran Sasso, Italy.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Status of the NO A Experiment Kirk Bays (Caltech) on behalf of the NO A collaboration Lake Louise Winter Institute Saturday, Feb 22, 2014.
The NO A Near Detector: An overview Jose A. Sepulveda-Quiroz For the NO A Collaboration Iowa State University and Argonne National Laboratory APS April.
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Event Display The DAQ system architecture The NOA Data Acquisition system with the full 14 kt far detector P.F. Ding, D. Kalra, A. Norman and J. Tripathi.
Monitoring and Commissioning the NOνA Far Detector M. Baird 1, J. Bian 2, J. Coelho 4, G. Davies 3, M. Messier 1, M. Muether 5, J. Musser 1 and D. Rocco.
NLC – The Next Linear Collider Project Colorado Univ. - Boulder Calorimetry-Arlington Calorimetry Detector Study Plans at Colorado Uriel Nauenberg for.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
The NOνA data driven trigger Matthew Tamsett for the NOνA collaboration NOνA Neutrino 2014, XXVI International Conference on Neutrino Physics and Astrophysics.
Experimental Method: 2 independent detectors on both sides of IP
NOnA NuMI Off-axis ne Appearance
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
The Beam Test at Fermilab:
Gamma-ray Large Area Space Telescope
LHCf – CSN1 Trieste O. Adriani
Chris Smith California Institute of Technology EPS Conference 2003
ScECAL+AHCAL+TCMT Combined Beam FNAL
Gary Feldman P5 Meeting 21 February
High Energy Neutrino Detectors Day 2
Experimental Method: 2 independent detectors on both sides of IP
Presentation transcript:

Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado

2 Overview of NOνA Mostly active liquid scintillator near and far detectors Beam energy peaked at 2 GeV NuMi Off-axis ν e appearance Experiment

3 Overview of NOνA Mostly active liquid scintillator near and far detectors Beam energy peaked at 2 GeV NuMi Off-axis ν e appearance Experiment For more details on physics at NOνA see talks and posters by: E. Niner, K. Bays, C. Backhouse E. Arrieta Diaz, Z. Wang,H. Sahoo, F. Psihas

4 The Detectors Near Detector Far Detector Prototype (NDOS) 14 kilotons 59.6 m x 15.6 m x 15.6 m 300 tons 14.3 m x 4.1 m x 4.1 m Finely segmented tracking calorimeter 4x6 cm 2 PVC cells filled with mixture of mineral oil and scintillator Alternating horizontal and vertical cells for 3D reconstruction

5 Getting the Light Out Wavelength shifting fiber delivers light to avalanche photodiodes (APDs) One cell per APD pixelTemperature -15 o CVoltage V Gain~100 Quantum Efficiency ~85% 344k channels Modules built from two extrusions

6 The NOνA Module Factory University of Minnesota Minneapolis

7 Ash River, Minnesota The Far Detector Hall

8 Far Detector Assembly Blocks Assembled at Ash River 32 planes per block 12 modules per plane

9 Block Installation Pivoting and moving blocks into place First block installed on 10 September Watch video of first block installation at:

10 Fermilab Near Detector Status ND cavern nearly ready Currently working on installation of movable access platform 8 blocks of 24 planes 3 modules per plane

11 Far Detector Status 11 Schedule: First beam in June 2013 (2.5 ktons for readout) Finish module assembly by early 2014 Fully instrumented by August 2014 As of 9-April-2013 Readout electronics installed Filled with scintillator Blocks installed Block assembly Updated weekly at

12 First Data from NOνA

13 Event Displays Far Detector Data Vertical Modules Horizontal Modules

14 Event Displays Far Detector Data Vertical Modules Horizontal Modules

15 Event Displays Far Detector Data Vertical Modules Horizontal Modules

16 Event Displays Far Detector Data

17 ADC spectra Far detector commissioning since March modules instrumented APDs not yet cooled Cosmic ray tracks from data taken on March X X X X Hits with adjacent hits Normalized to unit area

18 Summary NOνA construction is well underway More than one third of modules installed On schedule to completion by next summer Recorded and analyzing first cosmic rays First beam data expected this summer

19 Thank You

20 Event Displays

21 Event Displays

22 Construction Schedule July 2012 October 2014 April 2013 First Beam