WP3 Biomapping status quo WP3: NRM, CDF, CEFAS, DINARA, WCS.

Slides:



Advertisements
Similar presentations
WP3 Biomapping results to date WP3: NRM, CDF, CEFAS, DINARA, WCS Additional input: WP1, AquaMaps workgroup.
Advertisements

Implementation Council Meeting Structure and Resources Background: The Implementation Council (Council) roles and responsibilities are described in the.
Mapping Life on Earth: Recent Progress with AquaMaps Rainer Froese IFM-GEOMAR, Kiel, Germany Teldap Conference, Taipei 2 March 2009.
Add your Logo in the slide master menu Module IMPLICATIONS WP8- SERVICES WP9-SOCIOECON WP10-VALUATION.
State of the Art in Theory and Practice of Rural Development Measures Partner 4: The University of Wales Aberystwyth.
Technologies for adaptation to climate change: How to make them work?
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Winners and Losers in the Future Ocean Insights from Millions of Samples Rainer Froese IFM-GEOMAR, Kiel, Germany EDIT Symposium 18th January
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: Dissemination NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project co funded by.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Tradeoff Analysis: From Science to Policy John M. Antle Department of Ag Econ & Econ Montana State University.
The Preparatory Phase Proposal a first draft to be discussed.
Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.
EUROPEAN WORKPLACE AND ALCOHOL EWA PROJECT Main elements of coordination, administration and reporting WP1 Lidia Segura and Eva Moreno Program on Substance.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the.
Planning for Arctic GIS and Geographic Information Infrastructure Sponsored by the Arctic Research Support and Logistics Program 30 October 2003 Seattle,
RESISTVIR Work Package 1 (Project Management & Further Development) Mid-Term Meeting 7 th July 2006 Damian Cooper-Smith Chalex Research.
1 Electronic Atlas for All Marine Species Rainer Froese IFM-GEOMAR
EU BON Meeting, Joensuu, March 2015 Specifications of data sharing tools.
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
Species Information Systems Rainer Froese IFM-GEOMAR, Kiel World Biodiversity and European Taxonomy May 2009, Prague.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
WP6: Coastal Transects Ratana Chuenpagdee, Coastal Development Centre, Thailand Kungwan Juntarashote, Coastal Development Centre, Thailand Robert Kay,
© ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011.
Brainstorm: Ideas for sustainability after ICT-AGRI-2 Antoinette Jordan, Dr Raymond Kelly TEAGASC ICT-AGRI-2 Governing Board meeting, Athens 5-6 October.
SWPBS Team is Leadership Team Representative of school Representative of school Works directly with administration Works directly with administration Reviews.
European COstal-shelf sea Operational observing and Forecasting system ECOOP 1. Annual Meeting Athens February 2008 Erik Buch Coordinator.
Administrative matters Katherine Loens. The periodic activity report: Section 1 – Project objectives and major achievements during the reporting period:
Hellenic Centre for Marine Research (HCMR) MedOBIS - Ocean Biogeographic Information System for the Eastern Mediterranean and Black Sea.
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
Ecological Niche Modeling Conceptual Workflows Deana Pennington University of New Mexico December 16, 2004.
Environmental Information Infrastructure John R. Busby ERIN, Environment Australia.
Building Scientific Workflows for the Fisheries and Aquaculture Management Community based on Virtual Research Environments Pedro Andrade (CERN)
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
MAP-IT! Review Meeting 5 March Brussels Project Next Steps Cybion Srl.
European Topic Centre on Biological Diversity EIONET NRC Meeting on Biodiversity October 2011, Copenhagen Progress.
INCOFISH WP1, Data, Tools and Outreach Lotta Jarnmark Workpackage 1 leader INCOFISH WorldFish Center, Philippines.
User scenario on Marine Biodiversity AquaMaps Pasquale Pagano National Research Council (CNR) – ISTI Italy.
Transfer of Technology Consultative Process Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat (UNFCCC) Asia and the Pacific Regional.
This research has received funding from the European Community’s Seventh Framework Programme (FP7/ ) under grant agreement No WP3 update.
Eureca – European Ecosystem Assessment Proposal 3 March 2008.
Community Engagement to Advance Mitigation Action.
AquaMaps Mapping Marine Biodiversity Rainer Froese IFM-GEOMAR, Kiel, Germany FishBase Symposium 1 September 2008.
WP3 Biomapping summary WP3: NRM, CDF, CEFAS, DINARA, WCS Additional input: WP1, AquaMaps workgroup.
WP6: Coastal Transects Ratana Chuenpagdee, Coastal Development Centre, Thailand Kungwan Juntarashote, Coastal Development Centre, Thailand Robert Kay,
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
ECOST PROJECT WP4 ECOLOGICAL MODEL SECOND MEETING March 2006 DAKAR, SENEGAL WP.4 ECOLOGY CO-LEADER PROGRESS REPORT Karl Aiken, PhD UNIVERSITY OF.
COST Action and European GBIF Nodes Anne-Sophie Archambeau.
Click to edit Master subtitle style 3/9/ /12 Audit Readiness and Predetermined Objectives 11.
12 th Meeting of the GBIF Participant Nodes Committee 6-7 October 2013, Berlin, Germany Towards a generic work programme for a Node Olaf Bánki Senior Programme.
REPUBLIKA SLOVENIJA MINISTRSTVO ZA FINANCE 1 PLANNING WAGE BILL EXPENDITURES Saša Jazbec, Director General / Budget Directorate Ministry of Finance Ljubljana,
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 st Consortium Management Team Meeting University of Belgrade 27 th -28 th November 2014 WP8 - Management Progress Presentation (month 1- 12) Prof. dr.
CaSYPoT project structure
An Introduction to the Climate Change Explorer Tool: Locally Downscaled GCM Data for Thailand and Vietnam Greater Mekong Sub-region – Core Environment.
Strengthening the Capacities of the Chambers and Partners to help SMEs to Engage in apprenticeship Project Presentation Božo Pavičin, Cap4App Project.
MAES Working Group Meeting Brussels
The Joint CEOS/CGMS Working Group on Climate
Project Coordination Group (PCG) for the implementation of the MSFD
WP 2: Align / synchronise progress reporting under both directives
European Commission DG Environment
Management of Natura 2000 Sites
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
WP 10 Service Activities: Access to data products and knowledge
Presentation transcript:

WP3 Biomapping status quo WP3: NRM, CDF, CEFAS, DINARA, WCS

Objectives Provide access to point data from alla available sources Combine point data with environmental parameters to establish niche preferred niches and create maps (mostly done by WP1) Establish a system where maps can be verified by experts Provide authoritative species inventories Predict changes in species composition based on climate change scenarios

Dependencies Maps are provided by WP1 (D1.4) Underlying data from FishBase (OBIS, GBIF)

Followup on STCM 2 Progress. –Well…. Publications. –Still in pipeline Issues. Communication problems with CDF and WCS –Remain (solution?: more travel for CDF and WCS) Agreement: More point data. –Some provided from FB-Sweden. With current access to GBIF+OBIS, difficult to excel

WP Deliverables to date DeliverableDue month Completion Online standardized maps for predicted distributions for coastal zone species relevant to the project 13 May 2006 Online N<4141 Before-after maps with predicted distribution before and after a certain point in time 19 November 2006 Forthcoming

Maps = AquaMaps Based on c-squares mapping tool (Tony Rees) Maps available through FishBase servers

AquaMaps 4141 spp. to date

AquaMaps Multiple user options

Before-after maps Snapshot (outdated)

WP 3 Deliverables due DeliverableDue month Completion? Seasonal distribution maps 25 May 2007 Environmental layers collected, implementation underway Dynamic maps in space and time 31 Nov 2007 Environmental layers collected, implementation due on time Further population of maps, interactions and report 34 Feb 2008 Further population ongoing Report likely due on time At least 5 publications 34 Feb 2008 Doubtful

WP Papers projected Paper (lead author)Expected draft 1. AquaMaps validation (CEFAS)Summer Before-After maps (NRM)Second half Global biodiversity analysis – Multi-species tools in AquaMaps (FIN) Second half Potential for predicting future distributions of species given climate change models (NRM) Second half 2007 (following or linked to 3) 5-7 Finer scale mapping for local regions (CDF, DINARA, WCS) ???

Milestones First workshop (review data body and assign tasks) - Month 5 –Kiel, October 2005 and Campinas, April 2006 Second workshop (review map tools, and outcomes of analyses, decisions on dissemination and interfaces) - Month 27 –La Paz, March 2007

Financial status Current –Salaries: slight deficit –Coordinator travel: too much –WP workshops: maybe even break FishBase Sweden co-sponsors ArcView, computers, books, travel, etc. Prediction for year 2 end (April 2007) –NRM 2007 book-keeping will be available for analysis only end March (presently stands at EUR )

Wrap up All deliverables must be available in some advanced format by September 2007 Knowledge transfer within NRM from November/December 2007 Final report work starts January 2008, together with NRM project management officer No staff from March 2008 Audition starts March/April 2008 (? what to do if budget not balanced)

For further consideration Occurrence data quality –Expert review –Data cleaning More multi-species queries Computing requirements –Processing of multi-species data –Server capacity