MI/RR Operation Status Ioanis Kourbanis August 21, 2014.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
June 10, 2003Midwest Accelerator Physics Meeting, June 10-11, 2003, ANL 1 Several Topics in Recent Accelerator Studies Weiren Chou Fermilab June 10, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Accelerator Status and Plans
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Main Injector/Recycler Ioanis Kourbanis XMAC Review March 18-19, 2013.
Summary of Working Group 3: Rings Ioanis Kourbanis and Valeri Lebedev PIP-II Collaboration Meeting 9-10 November 2015.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
R. Bartolini Diamond Light Source Ltd
LHC (SSC) Byung Yunn CASA.
Beam dynamics requirements after LS2
Another Immortal Fill….
Presentation transcript:

MI/RR Operation Status Ioanis Kourbanis August 21, 2014

Outline MI SY120 operation (Seaquest) MI/RR High Power Operation Issues with RR High power operation Future Plans Conclusions I. Kourbanis, Proton PMG, August 21,

SY120 MI Operation We are running with ~6.5E12p (4 Booster turns, 6 batches) to Seaquest with a 53 MHz DT of ~30%.  We have a limit of 7.5E12 in MI  Higher intensity introduces losses at switchyard extraction We are continuing our effort to improve the slow spill duty factor.  Testing PS filters for reducing the 360Hz.  A QXR FIR filter is being developed. We currently have no QXR magnet spares. I. Kourbanis, Proton PMG, August 21,

$21 Cycle Intensity and Efficiency I. Kourbanis, Proton PMG, August 21,

Typical Seaquest operation (weekly plot) I. Kourbanis, Proton PMG, August 21,

MI/RR High power operation Continued running $23 cycles (MI only) with non slipped stacked beam till the RR transverse dampers were commissioned. After the RR dampers were commissioned we switched to all $2A cycles (using RR as proton stacker) without slip stacking. Had to deal with RR instabilities and aperture restrictions before we were able to increase the $2A intensity to 2.5E13 (same as the $23 cycle intensity). By using the Recycler we are currently delivering 30% more beam power than running MI only! At this point Recycler is operational! I. Kourbanis, Proton PMG, August 21,

MI Beam Power I. Kourbanis, Proton PMG, August 21, Switched to all $2A cycles Discovered 303 hot spot in RR. Fired TSPs. Boroscoped and re-aligned 303 area.

Recycler dampers It took us longer than expected to commission the Recycler transverse dampers.  Required the help of Nathan Eddy and his group. Dampers were operational late June. Allowed us to reduce chromaticity ~10 units in both planes significantly reducing the RR losses. After the RR dampers were commissioned we were able to switch to all $2A 1.33 sec MI cycles. I. Kourbanis, Proton PMG, August 21,

RR turn by turn with and without dampers I. Kourbanis, Proton PMG, August 21,

RR losses with and without dampers I. Kourbanis, Proton PMG, August 21, No Dampers high chromaticityDampers on low chromaticity

Recycler 30 straight losses 50 mR/h 500 mR/h >2R/h Realignment at 303 improved local losses Moved beam pipe up by 150 mills Pulled down ion pump slots Still have issues in 30 straight Will conduct further studies to understand whether these are just alignment issues, or whether lattice is a factor I. Kourbanis, Proton PMG, August 21,

Losses before and after the 303 re-alignment I. Kourbanis, Proton PMG, August 21,

RR303, RR501 extinction plots I. Kourbanis, Proton PMG, August 21,

RR303 vs. RR501 aperture scan with high intensity beam I. Kourbanis, Proton PMG, August 21,

Recycler Instability I. Kourbanis, Proton PMG, August 21, Affects first batch in the train of batches. Horizontal instability with growth of ~10 turns (cannot be damped) Threshold greatly depending on longitudinal peak density.

Recycler instability damper plot I. Kourbanis, Proton PMG, August 21,

Dealing with the Recycler instability Firing the Recycler TSPs during July’s shutdown helped reducing the instability.  The instability threshold increased by 30% (2.8E12 to 3.7E12) What drives the instability seems to be consumed by the injection of the first batch, so by injecting the first batch with a beam intensity close to the threshold allowed us to inject the rest of the batches with 20% higher intensity. We eventually reached 2.6E13 in RR with 6 batches! I. Kourbanis, Proton PMG, August 21,

Typical RR operational cycle (no ss) I. Kourbanis, Proton PMG, August 21, Batch 1: 3.7E12p Batches 2-6 : 4.4E12 Batch 1: 3.7E12p Batches 2-6 : 4.4E12

Typical MI/RR High Intensity Operation (weekly plot) I. Kourbanis, Proton PMG, August 21,

MI Beam power with and without SY120 I. Kourbanis, Proton PMG, August 21,

I. Kourbanis, Proton PMG, August 21,

Future Plans Commission the 6+2 RR operation  We need to turn off the RR transverse dampers for the last 2 injections.  Requires RF feedback on the RR RF stations.  Commission the MI collimators. Demonstrate 460 KW before the September shutdown. I. Kourbanis, Proton PMG, August 21,

6+2 RR Operation I. Kourbanis, Proton PMG, August 21, operation; beam +RF 2+6 operation; mountain range

Conclusions Recycler is now operational allowing us to deliver up to 350 KW of beam power with 6 Booster batches.  Better vacuum and beam scrubing are helping the RR instability.  Working on understanding the RR aperture at 30.  All localized losses in both machines need to be addressed. Working on increasing the beam power to 460 KW by implementing 6+2 slip stacking.  Studies are under-way We have achieved 70% of the Seaquest beam intensity. I. Kourbanis, Proton PMG, August 21,

EXTRA SLIDES I. Kourbanis, Proton PMG, August 21,

I. Kourbanis, Proton PMG, August 21,

Ring wide beta, vertical August 13, 2014 $ E1, separated tunes $E3 tune, more coupled

RR Momentum Aperture I. Kourbanis, Proton PMG, August 21, Momentum aperture required for SS 0.59% (min. 0.45%)

RR303 Extinction Plot I. Kourbanis, Proton PMG, August 21,