UM 1751 Energy Storage Workshop #3 May 9, 2016. UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: 2018-2019) Emerging.

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

How Technology will make Renewable Energy Competitive 10/17/2013
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Responses and Suggestions for Distributed Resource Plans Sky C. Stanfield September 17, 2014 CPUC Workshop – R
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
The Role of Energy Storage in Renewable Power Integration Emily Fertig Sharon Wagner Carnegie Mellon University.
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Transformation of the Electric Power Industry: Value of Regulatory Impact Assessments Greg R. White Commissioner.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
MINISTRY OF ENERGY Energy Storage Presentation to APPrO Storage Symposium November 19, 2014.
Energy Storage and Renewable Integration. 2 Dynapower Dynapower Corporation Dynapower Corporation is the world’s leading Independent manufacturer of standard.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
© Energy Storage: Addressing Today’s Grid Challenges for Tomorrow’s Energy Demands Brad Roberts Power Quality Systems Director S&C Electric.
Regulatory Approaches to Managing Investment Uncertainty Gülefşan Demirbaş ICER VWG2 Co-Chair.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Electric vehicle integration into transmission system
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Energy Analysis Department Cost-Effectiveness Valuation Framework for Demand Response Resources: Guidelines and Suggestions Chuck Goldman Lawrence Berkeley.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Advanced Energy Storage for Load Management 2008 Rulemaking on Load Management Standards Efficiency Committee Workshop March 3, 2008 Charles R. Toca US&R.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Matthew Rylander EPRI April 20, 2015 Streamlined Method for Determining Distribution.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
//plug-in ready michigan //powerpoint// plug-in ready michigan an electric vehicle preparedness plan: Utilities made possible through the generous support.
Energy Efficiency Action Plan Kathleen Hogan Director, Climate Protection Partnerships Division U.S. Environmental Protection Agency NARUC Winter Meetings.
Balanced Portfolio for Reliable Electricity System YES Inc. Brief Assessment.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
Demand Response
More Than Smart – A Distribution System Vision © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Dave Geier – VP Electric.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Changes in U.S. Regulatory Framework that Supports Energy Storage Deployment Jim Hart Vice President – South America.
Renewable Energy Innovation In Canberra Jon Sibley Director, Energy and Waste Policy Environment and Planning Directorate.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Haresh Kamath Program Manager, EPRI Building California’s Flexible Grid October 27,
V 2 green 1 Plug-in Vehicles and the Smart Grid David Kaplan V2Green Beyond Oil: Transforming Transportation September 4-5, 2008.
Women In Energy Conference Kingston, Jamaica March 10, 2016.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
Alex Glenn Duke Energy Florida President
Irvine Ranch Water District Distributed Energy Storage Case Study
NWA Suitability Criteria
Microgrids and Energy Storage for Smart City Planning
The Transition to a High DER Future
Opportunities in the Changing Energy System
New England Electricity Restructuring Roundtable
Preserving Competition and Promoting Clean Energy (for All)
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Integrated Distribution Planning Process
2500 R Midtown Sacramento Municipal Utility District
California Solar Initiative RD&D PV Integrated Storage: Demonstrating Mutually Beneficial Utility-Customer Business Partnerships Deepak Aswani May 4, 2017.
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

UM 1751 Energy Storage Workshop #3 May 9, 2016

UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging high value applications (long term) Projects under consideration for HB 2193 as of today How will the Company evaluate projects? Recommendations for the Commission to evaluate projects How should the Commission encourage investment? How will storage potential be evaluated? 2

Most viable and beneficial applications (HB 2193 time frame) 3 Distribution system deferral, either feeder or substation transformer upgrades, through peak shaving Local area regulation (voltage) Generation capacity deferral Electric energy time shift (arbitrage) Wind firming Best technologies: lithium chemistries and flow (depending on energy capacity requirements) Stacking of use cases will likely be necessary

Emerging high value applications (2020 and beyond) 4 Distribution system deferral, including feeder or substation transformer upgrades, through peak shaving Renewables energy time shifting Renewables capacity firming Regulation / Reserves Reliability – customer benefit Electric energy time shift (arbitrage)

Projects under consideration for HB 2193 as of today 5 Company believes HB 2913 requires: Storage resource(s) to be located in Oregon One or more storage projects with a combined energy capability of 5 mega-watt-hours storage capability Area distribution planning and the budgeting process have been key tools to identify potential storage opportunities Recent notification of potential step changes in load (i.e. major new load)

Projects under consideration for HB 2193 as of today 6 Key selection criteria: Approaching design capacity Expected load growth Historical load growth patterns Investment need Reliability statistics “Peaky” load (limited energy requirements) Permitting/approval challenges Physical space availability Utility side of the meter

Projects under consideration for HB 2193 as of today 7  Potential distribution substations/feeder capacity/congestion issues that have been identified: Gleneden Redmond Shevlin Park Warrenton  Large customer to address high reliability requirement

Shifting Peaks – Winter & Summer 8

Projects under consideration today 9

10

Projects under consideration today 11

Projects under consideration today 12

Projects under consideration today 13

Redmond 5D22 Winter Peak 14

How will the Company evaluate projects? 15 Prioritize and short list potential projects based on the value of investment deferral and in-house data base of costs and performance Apply a storage evaluation software tools [such as PNNL’s Battery Storage Evaluation Tool (BSET) or EPRI’s StorageVet] to identify best set(s) of stacked use cases Hold a competitive technical RFI/RFP to evaluate full life cycle costs assuming a set of use cases to identify applicable technologies/chemistries and optimum O&M practices. This will include an assessment of the commercial viability of the company/technology.

How will the Company evaluate projects? (cont’d) 16 Perform a present value of revenue requirements analysis of short-listed responses to the competitive solicitation. This will include a comparison to a traditional solution (if the application warrants-such as a substation upgrade). Valuation metrics that need development: Avoided balancing charges (renewable firming) Regulation Reserves (spinning and non-spinning)

How should the Commission encourage investment? 17 Consider supporting multiple projects to advance emerging use cases and/or promising technologies such as: “Behind the meter” applications of distributed residential storage (especially in neighborhoods with high solar PV penetration) Customer reliability applications Emerging battery chemistries

Recommendations for the Commission to evaluate projects 18 Highest net present value of revenue requirements If the net benefit is negative, rank order projects based on minimizing cost impacts to customers recognizing and balancing: Long term performance risk versus Providing a mechanism to foster and assess emerging/promising technologies Consider a mix of technology development project(s) (higher risk), market scenario cases (regional RTO) and higher value projects

How will storage potential be evaluated? 19 Storage potential will be evaluated in the context of need (current and future loads and generation portfolio), value and economic benefit to customers Storage potential will be indicated by future capital requirement “triggers” for either generation or T&D resources and the evolution of transparent markets (regional RTO) Short term (next 5 years) storage potential will be identified in the context of storage as an alternative to traditional T&D solutions