Meeting RPC Gas Task Force Meeting – 15 A. Sharma January 21st, 2009

Slides:



Advertisements
Similar presentations
Inert Gas Purification Systems
Advertisements

Gas Chromatography 427 PHC.
B.Satyanarayana for S.D.Kalmani TIFR, Mumbai Closed Loop Gas System.
Inert Gas Purification Systems Why do we need them??? Many of the materials used in research and development today are extremely air sensitive, and can.
LAPD Run 2 Results and Notes Terry Tope
RPC Purifiers’ studies /status/ IR, RG
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
RPC GAS SYSTEM Commercial grade Gas :Do in-situ purification Regeneration must :Get back ~90% Fixed pressure control room: pressure at all points in room.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
What is the It is the Next Generation, Calibration Station for the GasBadge ® Plus Personal Monitor
Fly Ash Collection System The most important factor in determining the type of fly ash collection technology to be used is the permissible particulate.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Dick Loveless 20 January Status of UXC Dick Loveless 20 January 2010.
Report dal Technical Coordinator Anna Colaleo. Detector Status: gas leak problem W+ 1, W+2, W-1 : 12 chambers with gas leak replaced W0 one chamber has.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
An Introduction to Chromatography What is chromatography? The separation of a mixture by distribution of its components between a mobile and stationary.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Summer Updates- Summer Student Report Emine Altuntas Stephen Fee Supervisors: Mar Capeans, Ivan Glushkov, Roberto Guida Gamma Irradiation Facility.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Optimization of the operation of Muon systems at LHC: a closed- loop gas system for RPCs and a CF 4 -recuperation unit for the CSC of CMS Conseil Européen.
Mack T12 Engine Test Update
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
1 Fluoride contamination of the RPC working gas and ageing phenomena in collaboration with Dip. Chimica University of Roma “Tor Vergata” Bio-Electro analytical.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
The RPC Closed loop Gas System Slides from Bianco and Guida.
Gas Systems for Particle Detectors R.Guida on behalf of the PH-DT-DI/Gas Service Team PH-DT Seminar CERN September 4 th, 2014.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Associated detection/extinction systems D. Swoboda.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
FTIR Gas Analysis Module Spectrum GX FTIR System – Perkin Elmer – Volume: 8.5 L – Wavenumber range: 10, cm -1 – Resolution: cm -1 M-5-22-V.
Control of the RPC ageing effects in the ATLAS chambers at the GIF - X5 CERN irradiation facility Siena 2004 Siena, 24/05/2004 By G. Aielli on behalf of.
The gas system for the CMS-RPC detector Roberto Guida Collaborazione CMS-RPC Riunione CSN1 Roma, 2 Aprile 2007.
Sampling and Measurement for Inorganic Gaseous Pollutants.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Luke or MTS Q anode. MOBY DICK  Purpose of Moby Dick:  Can we even get to ~10 ppb O 2 and H 2 O?  What other things in Moby will cause loss of LAr.
RPC Gas System Operation Report for October, Changguo Lu, Hansheng Sun.
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
HMPID maintenance activities during LS1 during LS1 Cosimo Pastore HMPID PLENARY MEETING March 22th, 2013.
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
The closed loop system at ISR We moved the system at ISR in January. Preliminary tests has been done in order to verify the possible use in the “ISR conditions”:
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
S.Colafranceschi 20 June Stefano Colafranceschi LNF Frascati CERN Universita’ di Roma – La sapienza An overview on gas studies, purifier materials.
Recycler/Ecool Shutdown Planning Meeting (6/4/2010)
Quality control of EP in KEK-STF TTC meeting April 21 st 2010 FNAL Motoaki SAWABE.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
G.SavianoWorkshop RPC Mumbai February Materials, Filters and Gas analyses for CMS RPC detector in Closed Loop test setup S.Bianco a, A. Brotzu.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
TC meeting P2 planning wks 3&4 A.Tauro
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Summary of TS2 activities on CO2 vacuum insulated lines on YB0
Gas system Commissioning procedures and status
Proximity Cryogenics P&IDs meeting
Oxygen + Mineral Water Purifier November, 2009.

Presentation transcript:

Meeting RPC Gas Task Force Meeting – 15 A. Sharma January 21st,

Closed loop All racks on CL 2.2 m3 /hr gas is circulated 7% fresh gas Some leaks repair(ed), broken gas inlets repair(ed), Shutdown with humidified Argon, with small current Purifiers : P1 (molecular sieve) in automatic mode with change over every 200 m3 (which is an equivalent of about 100 hours) P2 (Nickel filter) also automatic change over after 840 m3 ( about 14 to 16 days) The conditioning sequences for both purifiers are automatic. Humidifier: stable at ~ 6000 ppm ATLAS Meeting RPC Gas Task Force Meeting – 15 January 21st, 2009 Closed loop All racks on CL, Wheels (all?) REs (positive and ?) 10 % fresh gas (?) Some leaks repair(ed) Shutdown with humidified Argon, with small current New Infrared analyzer ok Gas Chromatograph Status New sampling points Purifiers: P1: Molecular Sieve (10% 5Å, 90 % 3 Å). Purifier saturated when the water concentration starts to rise from the set-point (8500 ppmV). (~ 1 wk) P2: Metallic filters (25% Cu; 25% Cu-Zn; 50% Ni Al2O3) The saturation of O2 takes about one month. Restart – Last week of Jan (ie next week) CMS

GIF: Gas Studies ATLAS Studies CMS Forward RPC Studies Meeting RPC Gas Task Force Meeting – 15 January 21st, RPC Gas Consumption: Approx. 50 K CHF for each ATLAS and CMS ( to be verified with Mats)